Permitting Authorities / City of Cherry Hills Village Building Department

Do you need a permit to replace a roof in Cherry Hills Village, CO?

Adopted code

City of Cherry Hills Village Building Department

Yes — a permit is required to replace a roof in Cherry Hills Village, CO, issued by City of Cherry Hills Village Building Department. Village roofing requirements call for an ice barrier installed in lieu of regular underlayment extending from the lowest edges of all roof surfaces in accordance with the IRC, and a drip edge at eaves and gables of asphalt shingle roofs.

Jurisdiction
City of Cherry Hills Village, Colorado
Jurisdiction type
city
Address
Cherry Hills Village, CO
Contact
  • url: https://www.cherryhillsvillage.com/421/Building-Permits
  • phone: 303-789-2541
Roofing permit required
Required
Contractor registration required
Not required
Registration details
  • license: Cherry Hills Village does not issue contractor licenses. Electrical contractors must register with the city by emailing required documentation; plumbers need state licensing but do not require city registration; other contractors do not need to register, though inspectors may request a trade professional's license during inspections.
Permit process note
Village roofing requirements call for an ice barrier installed in lieu of regular underlayment extending from the lowest edges of all roof surfaces in accordance with the IRC, and a drip edge at eaves and gables of asphalt shingle roofs.
Inspection requirements
All aspects of permits, including inspection scheduling, are handled through the city's online permit portal; first-time users must register and portal approval can take up to 24 business hours.
Adopted code
Cherry Hills Village has adopted the 2024 editions of the International Building Code, International Residential Code (with state amendments), International Energy Conservation Code, International Existing Building Code, International Fire Code, International Fuel Gas Code, International Mechanical Code, and International Plumbing Code, plus the 2020 National Green Building Standards and the state-approved National Electrical Code edition.
Drip edge
Required — The City's "Specific Roofing Requirements" guide states, under "Drip Edge": "A drip edge is required in accordance with Section 1507.2.9.3. They must be provided at eaves and gables of asphalt shingle roofs. Overlap to be a minimum of 2 inches. Eave drip edges shall extend 1/4 inch below sheathing and extend back on the roof a minimum of 2 inches. Drip edge shall be mechanically fastened a maximum of 12 inches o.c." About drip edge
Ice & water shield
Required — The City's printed Table R301.2 (continuation image) on the Adopted Building Codes page lists "Ice Barrier Underlayment Required: Yes." The City's separate "Specific Roofing Requirements" guide states, under "Ice Dam Protection": "Cherry Hills Village has a history of ice damming in the past. Therefore, in accordance with IRC Section 301.2 an ice barrier is required to be installed in lieu of the regular underlayment and extend from the lowest edges of all roof surfaces in accordance with the above code sections." About ice & water barrier
Mid-roof inspection
Required — The City's "Specific Roofing Requirements" guide states, under "Pre/Mid-roof Inspections": "The City of Cherry Hills Village requires a pre/mid-roof inspection on all reroofing projects. The inspector needs to see the underlayment and ice barrier as well as determine if the existing decking is appropriate and in good structural condition. It is recommended that the contractor call for the pre/mid-roof inspection prior to the installation of the roof membrane."
Impact-resistant roofing
Not required — Chapter 18 (Building Regulations) of the Cherry Hills Village Municipal Code — repealed and re-enacted by Ordinance No. 4, Series 2025, which adopts by reference the 2024 International Building Code and the 2024 International Residential Code with City amendments — was reviewed in full, including the complete IBC and IRC amendment lists. It contains no impact-resistance, Class 4 or UL 2218 roofing requirement, and no local amendment to the IRC roof-assembly provisions. The City's own "Specific Roofing Requirements" handout was likewise reviewed in full and imposes only ice-barrier, drip-edge, slope, underlayment, fastening, re-roofing and mid-roof-inspection requirements, with no impact-resistant material standard.
Repair permit threshold
The City's "Specific Roofing Requirements For Cherry Hills Village" guide states, under "Roof Repair": "If less than 1 square of roofing is to be replaced, it is considered general maintenance and does not require a permit. Over 1 square requires a permit and if the underlayment and shingles tie back into the existing, replacement of individual shingles or sections of shingles is permitted. Ice and Water shield, flashings and drip edge is required where shingles have been replaced."
Wind design criteria
The City's Adopted Building Codes page publishes "TABLE R301.2 CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA" as a printed image: "Ground Snow Load: 30 psf. Wind Design - Speed (mph): 115. Topographic effects: No. Special wind region: No. Wind-borne debris zone: No. Seismic Design Category: B." A continuation image ("cont.") adds: "Subject To Damage From - Weathering: Severe. Frost Line Depth: 36 in. Termites: Slight/Moderate. Ice Barrier Underlayment Required: Yes. Flood Hazards: August 1995."
Roof layer limit / recover
The City's "Specific Roofing Requirements" guide, under "Reroofing vs. Recovering," quotes IRC Section R907.3: "New roof coverings shall not be installed without first removing all existing layers of roof coverings where any of the following conditions exist: 1. Where the existing roof or roof covering is water-soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing. 2. Where the existing roof covering is wood shake, slate, clay, cement or asbestos-cement tile. 3. Where the existing roof has two or more applications of any type of roof covering." -- i.e. a maximum of one existing roof-covering layer before a recover is disallowed and tear-off is required.
Sales & use tax
7.75% combined (state 2.9% + RTD 1% + SCFD 0.1% + Arapahoe County 0.25% + City of Cherry Hills Village 3.5%; no LID). Cherry Hills Village is a home-rule municipality and self-collects its own sales tax; the City's own Sales Tax page states: "Effective May 8, 2023, the City of Cherry Hills Village imposes a 3.5% sales tax on the privilege of selling tangible personal property at retail upon every vendor engaged in business in the City." Colorado Department of Revenue form DR 1002 (rev. 06/19/19; updated semi-annually) separately lists Cherry Hills Village under "Home Rule Cities For Which The State Does Not Collect Local Sales Tax" at a city rate of 3.50%, consistent with the City's own page, and lists the RTD (1%) and Scientific and Cultural Facilities District (0.1%) rates as applying countywide across the Denver-metro RTD/CD boundary, which includes Cherry Hills Village. The Arapahoe County component (0.25%) is per the same DR 1002 vintage and was not independently corroborated against a live county page. Re-verified 2026-08-27 against the January 2026 edition of Colorado Department of Revenue form DR 1002, read from a rendered image of its tables rather than from extracted text: the state, county and city figures above match that edition exactly. Where the text above names the June 19, 2019 revision of DR 1002, that describes the edition the figure was originally taken from and is not a current citation.

The building permit authority for the City of Cherry Hills Village in Arapahoe County. Permits are handled through the city's online portal, the city does not issue contractor licenses (only electrical contractors must register), and the 2024 I-Codes are adopted, with village-specific roofing requirements for ice barrier and drip edge.

Working an insurance claim in Cherry Hills Village, CO? Everything on this page — drip edge, ice & water shield, inspections, Class 4 rules — formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF) — one page, free.

Buy this jurisdiction's pack — $12 Delivered by email within minutes.

Questions about the Cherry Hills Village, CO pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Free instant roof estimate — Cherry Hills Village, CO

Ballpark your replacement in 20 seconds. No phone call required to see the number.

Roofing questions — Cherry Hills Village, CO

Do you need a permit to replace a roof in Cherry Hills Village, CO?

Required. The City's "Specific Roofing Requirements For Cherry Hills Village" guide states, under "Roof Repair": "If less than 1 square of roofing is to be replaced, it is considered general maintenance and does not require a permit. Over 1 square requires a permit and if the underlayment and shingles tie back into the existing, replacement of individual shingles or sections of shingles is permitted. Ice and Water shield, flashings and drip edge is required where shingles have been replaced."

Is ice & water shield required in Cherry Hills Village, CO?

Required — The City's printed Table R301.2 (continuation image) on the Adopted Building Codes page lists "Ice Barrier Underlayment Required: Yes." The City's separate "Specific Roofing Requirements" guide states, under "Ice Dam Protection": "Cherry Hills Village has a history of ice damming in the past. Therefore, in accordance with IRC Section 301.2 an ice barrier is required to be installed in lieu of the regular underlayment and extend from the lowest edges of all roof surfaces in accordance with the above code sections.".

Is drip edge required?

Required — The City's "Specific Roofing Requirements" guide states, under "Drip Edge": "A drip edge is required in accordance with Section 1507.2.9.3. They must be provided at eaves and gables of asphalt shingle roofs. Overlap to be a minimum of 2 inches. Eave drip edges shall extend 1/4 inch below sheathing and extend back on the roof a minimum of 2 inches. Drip edge shall be mechanically fastened a maximum of 12 inches o.c.".

Is a mid-roof inspection required?

Required — The City's "Specific Roofing Requirements" guide states, under "Pre/Mid-roof Inspections": "The City of Cherry Hills Village requires a pre/mid-roof inspection on all reroofing projects. The inspector needs to see the underlayment and ice barrier as well as determine if the existing decking is appropriate and in good structural condition. It is recommended that the contractor call for the pre/mid-roof inspection prior to the installation of the roof membrane.".

Do roofing contractors need a license or registration in Cherry Hills Village, CO?

Not required. Cherry Hills Village does not issue contractor licenses. Electrical contractors must register with the city by emailing required documentation; plumbers need state licensing but do not require city registration; other contractors do not need to register, though inspectors may request a trade professional's license during inspections..

What building code does Cherry Hills Village, CO use?

Cherry Hills Village has adopted the 2024 editions of the International Building Code, International Residential Code (with state amendments), International Energy Conservation Code, International Existing Building Code, International Fire Code, International Fuel Gas Code, International Mechanical Code, and International Plumbing Code, plus the 2020 National Green Building Standards and the state-approved National Electrical Code edition.