Permitting Authorities / City of Yukon - Development Services

Do you need a permit to replace a roof in Yukon, OK?

Adopted code

City of Yukon - Development Services

Yes — a permit is required to replace a roof in Yukon, OK, issued by City of Yukon - Development Services. The City's Roof Permit Application states "A separate application and permit are required for each individual building," that "All metal & flat roof permits are required to be submitted with the manufacture installation instructions for review. Allow for a 3 day turn around for review," and that "All permits must be posted on the garage/front of building where it can be viewed from the street before you start work on any roof.".

Jurisdiction
City of Yukon, Oklahoma
Jurisdiction type
city
Address
334 Elm Avenue, Yukon, OK 73099
Contact
  • url: https://www.yukonok.gov/157/Development-Services
  • phone: 405-354-6676
  • email: [email protected]
Roofing permit required
Required
Contractor registration required
Registration details
  • license: The City of Yukon's "How to Hire a Roofing Contractor" page states "Any person hired to perform work must have the required City of Yukon contractor registration (Building Contractor License) to do work within the City limits," and that roofing contractors "must be licensed by the State of Oklahoma Construction Industry Board."
Permit process note
The City's Roof Permit Application states "A separate application and permit are required for each individual building," that "All metal & flat roof permits are required to be submitted with the manufacture installation instructions for review. Allow for a 3 day turn around for review," and that "All permits must be posted on the garage/front of building where it can be viewed from the street before you start work on any roof."
Inspection requirements
The City's online "Request an Inspection" page lists "Roof Tear-Off" as an inspection category under Miscellaneous inspections, which may be requested by phone, fax, or the online request form.
Adopted code
Yukon's Code of Ordinances, Chapter 204, Article II, Sec. 204-27 ("Adoption of building code") adopts "the International Building Code, 2015 edition including appendix H, as published by the International Code Council ... as the Building Code of the City of Yukon, in the State of Oklahoma."
Drip edge
Required — Drip edge is required at eaves and rake edges of shingle roofs (IRC R905.2.8.5). The jurisdiction adopted the 2015 International Residential Code via Ordinance No. 1414 (8-18-2020; Ch. 9 amendments limited to R902.1, R905.2.1 and R908.3.1.1); that instrument, read in full, does not amend R905.2.8.5, so the code's drip-edge requirement stands as enacted local law. About drip edge
Ice & water shield
Required — City of Yukon Ordinance No. 1414 (adopted Aug. 18, 2020), Sec. 204-138, amends the adopted 2015 International Residential Code Table R301.2(1) "Climatic and Geographic Design Criteria" for the City of Yukon to read "Ice barrier underlayment required - Yes," alongside the table's Ground Snow Load, Wind Speed, and other city-specific design criteria entries. About ice & water barrier
Mid-roof inspection
Required — Required - Yukon takes a distinct roof tear-off inspection. The City of Yukon Development Services "Request an Inspection" page sets out the City's own enumerated "Category of Inspections," and "Roof Tear-Off" appears in it under the Miscellaneous grouping, alongside Fence, Storm Water, Swimming Pool, Accessory Building, Demolition, Boring, Fire Line and Mobile Home Placement. It is the only roof-specific inspection category the City offers - the list contains no roof final and no roof covering category - so the inspection carried on a Yukon roof permit is the one taken at the tear-off stage, after the existing covering is off and necessarily before the new covering is applied, which is what a mid-roof inspection is. A permit is required for all roofing work in Yukon, so this is not an optional or courtesy inspection: Ordinance No. 1414 (adopted Aug. 18, 2020) deletes IRC R105.2 exemptions 1 through 5 and provides that "Permits shall be required for all work referenced in subparagraphs 1, 2, 3, 4 and 5," and the City's Roof Permit Application requires that "All permits must be posted on the garage/front of building where it can be viewed from the street before you start work on any roof." Inspections are requested by telephone at 405-354-6676, by fax, or through the online request form, and the request must identify the person requesting, the company, the location, the homeowner or business name, whether it is a new inspection or a re-inspection, and the type of inspection. SCOPE LIMITS, stated rather than glossed: this requirement is established by the City's own inspection-request system rather than by codified text. Ordinance No. 1414's only amendment to IRC Section R109 is at R109.1.3 Floodplain inspections. The City's "Updated Residential Roofing Guidelines" (updated 02/1/2021), which do address submittal requirements, compliance with R904, R905, R806 and R908, flashing and vent flues, and mechanical, electrical, plumbing and gas disconnects, do not name the tear-off inspection or state at what point it must be called, and they carry their own disclaimer: "This document is not all-inclusive, other requirements not cited in this document is also required to be addressed." No document read states a deadline or notice period for requesting the tear-off inspection.
Impact-resistant roofing
Not required — City of Yukon Ordinance No. 1414 (passed and approved August 18, 2020, 65 pages), which amends Code of Ordinances Sec. 204-136 "Adoption of International Residential Code for One- and Two-Family Dwellings" to adopt the 2015 International Residential Code -- the city's dedicated residential-code instrument, distinct from Sec. 204-27's separate adoption of the International Building Code -- along with Secs. 204-137, 204-138 and 204-140, was read in full. Chapter 9 (Roof Assemblies) is amended in exactly three places: Section R902.1 Roofing covering materials ("All roof coverings shall be required to be a minimum Class A, B or C" -- a fire-classification requirement under ASTM E108/UL 790, not an impact-resistance standard), Section R905.2.1 Sheathing requirements, and Section R908.3.1.1 Roof re-cover (barring a second layer of asphalt shingles). No other Chapter 9 section is touched. The ordinance also adopts by reference all Oklahoma Uniform Building Code Commission amendments to the 2015 IRC not separately amended by the city; the OUBCC's 2015 IRC Permanent Rule (OAC Title 748, Ch. 20, Subch. 5, Sec. 748:20-5-11.1, "IRC 2015 Chapter 9 Roof Assemblies," 3 modification items) contains no such provision either. No UL 2218, Class 4, or impact-resistance provision appears in either document.
Repair permit threshold
City of Yukon Ordinance No. 1414 (adopted Aug. 18, 2020), Sec. 204-138, states: "Section R105.2 Work exempt from permit is amended as follows: R105.2 Work exempt from permit. Subparagraphs 1, 2, 3, 4 and 5 are hereby deleted from the list of exemptions. Permits shall be required for all work referenced in subparagraphs 1, 2, 3, 4 and 5."
Wind design criteria
Table 301.2(1) Climatic and Geographic Design Criteria, as amended by City of Yukon Ordinance No. 1414 (Sec. 204-138, Chapter 3 Building Planning, adopted Aug. 18, 2020): "Ground Snow Load - 10 PSF; Wind Speed - 90 mph; Seismic Design Category - B; Weathering - moderate; Frost line depth - 18 inches; Termite - Yes; Winter design temp. - 13 degree Fahrenheit; Ice barrier underlayment required - Yes; Flood hazards - See Chapter 207 of the City of Yukon Code of Ordinances; Air freezing index - 332; Mean annual temp. - 60 degrees Fahrenheit." The table as printed in the ordinance does not include separate topographic-effects, special-wind-region, or windborne-debris-zone entries -- only the eleven fields quoted above.
Roof layer limit / recover
City of Yukon Ordinance No. 1414 (Sec. 204-138, Chapter 9 Roof Assemblies, adopted Aug. 18, 2020) amends R908.3.1.1 Roof re-cover to read: "A roof re-cover shall not be permitted where any of the following conditions occur: 1. Where the existing roof or roof covering is water soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing. 2. Where the existing roof covering is slate, clay, cement or asbestos-cement tile. 3. Where the existing roof has two or more applications of any type of roof covering. 4. Where the existing roof has one or more application of asphalt shingles additional applications of asphalt shingles shall not be permitted."
Deck & sheathing requirements
City of Yukon Ordinance No. 1414 (Sec. 204-138, Chapter 9 Roof Assemblies, adopted Aug. 18, 2020) amends R905.2.1 Sheathing requirements to read: "Asphalt shingles shall be fastened to solidly sheathed decks in accordance with Section R803 and to the asphalt shingles manufacturer's installation instructions."
Sales & use tax
Combined rate 8.85% inside Yukon city limits (state 4.5% + City of Yukon 4% + Canadian County 0.35%). The OTC rate chart lists only one jurisdiction code for Yukon (COPO 0955, Canadian County), so the combined rate does not vary by address within the city. Oklahoma taxes roofing contractors as consumers/users: they pay sales tax on materials, supplies, and equipment at the point of purchase from the vendor, and do not separately charge the homeowner sales tax on labor or the finished job (Oklahoma Tax Commission Rule OAC 710:65-7-13(a): "Contractors are defined by statute as consumer/users and must pay sales tax on all taxable services and tangible personal property, including materials, supplies, and equipment purchased to develop, repair, alter, remodel, and improve real property."). No construction use tax collected at building-permit issuance was found in OTC or city sources -- Oklahoma's local sales tax is OTC-administered and collected by material vendors at the point of sale, not assessed by the permitting authority at permit issuance.

The permitting authority for the City of Yukon, Oklahoma. Development Services issues building, electrical, plumbing, and mechanical permits, including residential and commercial re-roof permits, and states that roofing contractors must hold City of Yukon contractor registration and State of Oklahoma Construction Industries Board licensing.

Working an insurance claim in Yukon, OK? Everything on this page — drip edge, ice & water shield, inspections, Class 4 rules — formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF) — one page, free.

Buy this jurisdiction's pack — $12 Delivered by email within minutes.

Questions about the Yukon, OK pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Roofing questions — Yukon, OK

Do you need a permit to replace a roof in Yukon, OK?

Required. City of Yukon Ordinance No. 1414 (adopted Aug. 18, 2020), Sec. 204-138, states: "Section R105.2 Work exempt from permit is amended as follows: R105.2 Work exempt from permit. Subparagraphs 1, 2, 3, 4 and 5 are hereby deleted from the list of exemptions. Permits shall be required for all work referenced in subparagraphs 1, 2, 3, 4 and 5."

Is ice & water shield required in Yukon, OK?

Required — City of Yukon Ordinance No. 1414 (adopted Aug. 18, 2020), Sec. 204-138, amends the adopted 2015 International Residential Code Table R301.2(1) "Climatic and Geographic Design Criteria" for the City of Yukon to read "Ice barrier underlayment required - Yes," alongside the table's Ground Snow Load, Wind Speed, and other city-specific design criteria entries..

Is drip edge required?

Required — Drip edge is required at eaves and rake edges of shingle roofs (IRC R905.2.8.5). The jurisdiction adopted the 2015 International Residential Code via Ordinance No. 1414 (8-18-2020; Ch. 9 amendments limited to R902.1, R905.2.1 and R908.3.1.1); that instrument, read in full, does not amend R905.2.8.5, so the code's drip-edge requirement stands as enacted local law..

Is a mid-roof inspection required?

Required — Required - Yukon takes a distinct roof tear-off inspection. The City of Yukon Development Services "Request an Inspection" page sets out the City's own enumerated "Category of Inspections," and "Roof Tear-Off" appears in it under the Miscellaneous grouping, alongside Fence, Storm Water, Swimming Pool, Accessory Building, Demolition, Boring, Fire Line and Mobile Home Placement. It is the only roof-specific inspection category the City offers - the list contains no roof final and no roof covering category - so the inspection carried on a Yukon roof permit is the one taken at the tear-off stage, after the existing covering is off and necessarily before the new covering is applied, which is what a mid-roof inspection is. A permit is required for all roofing work in Yukon, so this is not an optional or courtesy inspection: Ordinance No. 1414 (adopted Aug. 18, 2020) deletes IRC R105.2 exemptions 1 through 5 and provides that "Permits shall be required for all work referenced in subparagraphs 1, 2, 3, 4 and 5," and the City's Roof Permit Application requires that "All permits must be posted on the garage/front of building where it can be viewed from the street before you start work on any roof." Inspections are requested by telephone at 405-354-6676, by fax, or through the online request form, and the request must identify the person requesting, the company, the location, the homeowner or business name, whether it is a new inspection or a re-inspection, and the type of inspection. SCOPE LIMITS, stated rather than glossed: this requirement is established by the City's own inspection-request system rather than by codified text. Ordinance No. 1414's only amendment to IRC Section R109 is at R109.1.3 Floodplain inspections. The City's "Updated Residential Roofing Guidelines" (updated 02/1/2021), which do address submittal requirements, compliance with R904, R905, R806 and R908, flashing and vent flues, and mechanical, electrical, plumbing and gas disconnects, do not name the tear-off inspection or state at what point it must be called, and they carry their own disclaimer: "This document is not all-inclusive, other requirements not cited in this document is also required to be addressed." No document read states a deadline or notice period for requesting the tear-off inspection..

Do roofing contractors need a license or registration in Yukon, OK?

Required. The City of Yukon's "How to Hire a Roofing Contractor" page states "Any person hired to perform work must have the required City of Yukon contractor registration (Building Contractor License) to do work within the City limits," and that roofing contractors "must be licensed by the State of Oklahoma Construction Industry Board.".

What building code does Yukon, OK use?

Yukon's Code of Ordinances, Chapter 204, Article II, Sec. 204-27 ("Adoption of building code") adopts "the International Building Code, 2015 edition including appendix H, as published by the International Code Council ... as the Building Code of the City of Yukon, in the State of Oklahoma."