Permitting Authorities / Town of Silver Plume - Building Permits
Do you need a permit to replace a roof in Silver Plume, CO?
Adopted code
Town of Silver Plume - Building Permits
Yes — a permit is required to replace a roof in Silver Plume, CO, issued by Town of Silver Plume - Building Permits. The Town publishes a form titled "Town of Silver Plume Building Permit Application FOR ROOF REPLACEMENT PROJECTS ONLY!!" which requires the contractor's name, license number, materials to be removed and installed, ice/snow shield specification, and requires the applicant to "include... Construction plans (Land Use Code Section 4.2.B)" and "Documentation of compliance with other permit and approval requirements of these Regulations (Land Use Code Section 4.2.C)." The form states: "The Town or its agents are authorized to order the immediate cessation of construction at any time a violation of the Building Permit approval or Town codes or regulations appears to have occurred, and such violation may result in the revocation of the Building Permit pursuant to Division 12 of the Town of Silver Plume Land Use Code." A roof-replacement permit is void if construction is not commenced within 180 days of issuance, or if work ceases for 180 continuous days, and requires sign-off from both the Building Inspector and the Planning and Zoning Board.
Jurisdiction
Town of Silver Plume, Colorado
Address
710 Main Street, Silver Plume, CO 80476
Contact
- url: https://silverplumetown.com/licenses-and-permits/
- phone: 303-569-2363
- email: [email protected]
Roofing permit required
Required
Permit process note
The Town publishes a form titled "Town of Silver Plume Building Permit Application FOR ROOF REPLACEMENT PROJECTS ONLY!!" which requires the contractor's name, license number, materials to be removed and installed, ice/snow shield specification, and requires the applicant to "include... Construction plans (Land Use Code Section 4.2.B)" and "Documentation of compliance with other permit and approval requirements of these Regulations (Land Use Code Section 4.2.C)." The form states: "The Town or its agents are authorized to order the immediate cessation of construction at any time a violation of the Building Permit approval or Town codes or regulations appears to have occurred, and such violation may result in the revocation of the Building Permit pursuant to Division 12 of the Town of Silver Plume Land Use Code." A roof-replacement permit is void if construction is not commenced within 180 days of issuance, or if work ceases for 180 continuous days, and requires sign-off from both the Building Inspector and the Planning and Zoning Board.
Inspection requirements
The reroof permit application lists three required inspection stages: "Tear off," "Mid Roof," and "Date of FINAL INSPECTION," in addition to final approval sign-off from the Building Inspector.
Adopted code
The 2018 editions of the International Building, Residential, Mechanical, Fuel Gas, Plumbing, Existing Building and Fire Codes, adopted by reference by Ordinance No. 345, which repealed the Town's prior adoptions under Ordinance 302 and carries local amendments to each adopted code.
Ice & water shield
Required — Required town-wide. The Town of Silver Plume completes International Residential Code Table R301.2(1) at Section 5(G) of Ordinance No. 345, and the completed table answers "Ice Shield Underlayment Required" with "YES". The Town also inspects for it specifically: its roofing inspection list requires a "Mid-roof inspection of ice and snow shield required 4 feet up from exterior walls."
About ice & water barrier
Mid-roof inspection
Required — Required on every roofing permit, and specifically to check the ice and snow shield. Section 8 of Ordinance No. 345 provides that "The Town of Silver Plume has established additional roofing inspections within the Town. For roofing permits within the Town of Silver Plume, the following inspections shall be required: 1. Tear off inspections (sheathing). 2. Mid-roof inspection of ice and snow shield required 4 feet up from exterior walls. 3. Final inspection prior to issuance of Certificate of Occupancy." A roofing job in Silver Plume is therefore inspected three times, not once.
Impact-resistant roofing
Not required — The Town of Silver Plume adopted the 2018 editions of the International Building, Residential, Mechanical, Fuel Gas, Plumbing, Existing Building and Fire Codes by reference through Ordinance No. 345. That ordinance was reviewed in full, including its amendments to the International Residential Code at Sections R101.1, R104.10.1, R105.1, R108.5, R112.1, R301.2, R401.2 and R405.1; none addresses impact resistance or requires UL 2218 Class 4 roof coverings. The ordinance does establish Town-specific roofing inspections at Section 8 - a tear-off inspection of the sheathing, a mid-roof inspection of the ice and snow shield required four feet up from exterior walls, and a final inspection - which govern inspection sequence rather than the impact rating of the roof covering.
Wind design criteria
A design wind speed of 100 mph in Seismic Design Category B. The Town of Silver Plume completes International Residential Code Table R301.2(1) at Section 5(G) of Ordinance No. 345, and the completed table sets a ground snow load of 100 pounds per square foot, severe weathering, a frost line depth of 40 inches, a slight to moderate termite hazard, an air freezing index of 2,500 and flood hazards per Town Ordinance No. 340. At roughly 9,100 feet the 100 pound ground snow load is among the highest in the corpus and is a structural figure, separate from the wind speed.
Sales & use tax
8.55 percent combined: 2.9 percent state, 2.65 percent Clear Creek County and 3 percent Town of Silver Plume. The Town is state-collected and levies no use tax at all, so a roofing job carries no materials use tax deposit at permit issuance. Rates read from the Colorado Department of Revenue publication DR 1002, January 2026 edition.
Local roofing hub
Roof permits nearby — Clear Creek County
Related guides
The building permit authority for the Town of Silver Plume, a Home Rule town of about 200 residents in Clear Creek County, part of the Georgetown-Silver Plume National Historic District. The Town issues its own building permits, including a dedicated permit application specifically for roof-replacement projects, under its Land Use Code.
Working an insurance claim in Silver Plume, CO? Everything on this page — drip edge, ice & water shield, inspections, Class 4 rules — formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF) — one page, free.
Buy this jurisdiction's pack — $12 Delivered by email within minutes.
Questions about the Silver Plume, CO pack?
Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.