Permitting Authorities / City of Santa Fe, New Mexico - Building Division (Land Use Department)

City of Santa Fe, New Mexico - Building Division (Land Use Department)

Adopted code

The permitting authority for the City of Santa Fe, New Mexico (Santa Fe County), the state capital. The City states plainly on its own building-permit page: "The City of Santa Fe Land Use Department is the authority having jurisdiction over building permits within the city limits of Santa Fe, New Mexico." Santa Fe is therefore a self-administering jurisdiction under Section 60-13-41(D) NMSA 1978, which permits a municipality to inspect work under its own permits where it employs a certified building official and has adopted the current minimum code standards; New Mexico's default, under Section 60-13-41(E), is that the state Construction Industries Division (CID) inspects where a jurisdiction has no certified building official in its employ. The Building Division sits inside the Land Use Department at City Hall, 200 Lincoln Avenue, and issues building, electrical, mechanical and plumbing/gas permits, including stand-alone re-roof permits for both residential and commercial work. Roofing and re-roofing are named expressly on the City's list of work requiring a permit, and the City publishes a dedicated re-roof permit application and submittal checklist. Santa Fe layers a City-specific Residential Green Building Code and City amendments to the Uniform Plumbing Code and International Fire Code on top of the statewide New Mexico codes; New Mexico's residential rule is a floor a municipality may build on, never subtract from.

Jurisdiction
City of Santa Fe, New Mexico
Jurisdiction type
city
Address
200 Lincoln Avenue, Santa Fe, NM 87501
Contact
  • url: https://www.santafenm.gov/land-use/building-permits
  • phone: 505-955-6585
Permit portal
Roofing permit required
Required
Contractor registration required
Required
Registration details
  • license: STATE LICENCE, administered by the New Mexico Regulation and Licensing Department's Construction Industries Division (CID) under the Construction Industries Licensing Act, Chapter 60, Article 13 NMSA 1978. It applies in Santa Fe exactly as everywhere else in New Mexico. Roofing has its own dedicated specialty classification, GS-21, at 14.6.6.9 NMAC, verbatim: "(12) GS-21. Roofing. Requires two years of foreman level practical or related trade experience. Install, alter or repair roof systems on new or existing roof decks to create a weatherproof and waterproof protective membrane, with or without insulation, using asphalt, pitch, tar, sealants, felt, shakes, shingles, roof tile, slate, urethane or any other approved materials including the preparatory work necessary to bring a roof deck or an existing roof to a condition where roofing can be installed, and sealed or repaired; includes cutting, shaping, fabricating, and installing of sheet metal such as cornices, flashing, skylights (excluding alterations to structural framing), roof coatings, gutters, leaders, rainwater downspouts, pans, prefabricated chimneys, at or near roof lines, metal flues, or doing any part of any combination thereof, which relate to and are incidental to roofing projects." Roofing is also subsumed by the general building classifications at 14.6.6.9.B NMAC, verbatim: "(1) GB-2. Residential. Requires two years of foreman level practical or related trade experience. Erect, alter, repair or demolish residences and apartment houses accommodating not more than four family units... includes all work described by the GS specialty classifications, provided the work is limited to residential construction as defined under this provision. (2) GB-98. General building. Requires four years of foreman level practical or related trade experience of which at two years must be commercial experience. Erect, alter, repair or demolish residential and commercial buildings, and certain structures; includes all work authorized by the GB-2, GF-5, GF-7 and GS classifications..." So a standalone roofing subcontractor holds GS-21, while a general contractor re-roofing as part of building or remodelling the whole structure holds GB-2 or GB-98 and needs no separate GS-21 for that work. BOND: Section 60-13-49(B) NMSA 1978 applies to every classification including GS-21 with no roofing-specific variance, verbatim: "B. Proof of responsibility shall be a bond of ten thousand dollars ($10,000) acceptable to the director and underwritten by a corporate surety authorized to transact business in New Mexico." Section 60-13-51 NMSA 1978 bars a municipality from stacking an additional local bond on a CID licensee, verbatim: "No municipality shall require any person or corporation licensed under the provisions of the Construction Industries Licensing Act to file or obtain as a condition of doing business as a licensed contractor within the municipality any additional license bond as proof of responsibility if the person or corporation has met the responsibility requirements of the commission." INSURANCE: workers' compensation coverage is required under the Workers' Compensation Act, and Section 60-13-23(I) NMSA 1978 makes "failure to maintain workers' compensation insurance as required by the Workers' Compensation Act" a ground for revocation or suspension of the licence. THRESHOLD: there is no roofing-specific dollar threshold. The only no-licence path is the general casual-work exemption at Section 60-13-3(D)(14) NMSA 1978, covering "an individual who works on one undertaking or project at a time that, in the aggregate or singly, does not exceed seven thousand two hundred dollars ($7,200) compensation a year, the work being casual, minor or inconsequential, such as handyman repairs..." - conditioned on the work not being held out as a contracting business and on an annual declaration filed with CID. That is not a "small roofing jobs are exempt" rule. Owner-builder exemptions at Section 60-13-3(D)(10)-(11) cover an individual working on their own owner-occupied dwelling, who must still comply with all codes and permits. CITY LAYER: Santa Fe does not license roofing contractors separately, and Section 60-13-51 NMSA 1978 would bar it from adding a local bond on top of the CID bond in any event. It does require a general business registration. Section 18-2.3 SFCC 1987 imposes "on each place of business conducted in the city and not licensed pursuant to Section 3-38-1, NMSA 1978, and Section 18-1, Business Licenses, an annual business registration fee in the amount of thirty-five dollars ($35.00)," and Section 18-2.4 requires any person proposing to engage in business to "apply to the city for a certificate of occupancy and pay a business registration fee of thirty-five dollars ($35.00), for each outlet, branch, location, or person doing business in the municipal limits of the city, prior to engaging in business." Contracting is not among the trades enumerated for a Section 18-1 SFCC 1987 business licence, so a roofing contractor falls under the Section 18-2 registration. Consistently with that, the City's Re-Roof Permit Application collects both a "State License #" and a "City License #" from the contractor.
Permit process note
The Building Division is part of the City of Santa Fe Land Use Department, on the 1st floor of Santa Fe City Hall, 200 Lincoln Avenue (southwest entrance facing Marcy Street nearest the Convention Center); mailing address City of Santa Fe, Building Permit Division, P.O. Box 909, Santa Fe, NM 87504-0909. Building Division Director is Richard Trujillo ([email protected]); the permit counter is [email protected]. Land Use office hours are Monday-Friday 8:00 a.m.-noon and 1:00-5:00 p.m.; the Building Division itself is by appointment only, Monday, Tuesday and Thursday 9:00-11:00 a.m. and 1:00-3:00 p.m. Re-roof permits - residential and commercial - are handled as "Express" permits through the City's Citizen Self-Service (CSS) portal, with online payment; the City states that "Submittal of building permit applications by email is currently not available (except for use under special circumstances and as pre-arranged with the Building Division Manager)." The re-roof submittal package is two sets of a roof plan showing "Type of roof system, the roof slope, and roof drainage" plus "Manufacturer's specifications and installation instructions"; the application also records construction valuation, roofing square footage, roof pitch, number of existing layers and roof classification. All commercial re-roof projects additionally require professional seals attesting that "The structure is sufficient to sustain the weight of the additional dead load for the new roof system", "The roof deck is structurally sound", "Roof drains and drainage are sufficient to prevent extensive accumulation of water", "The existing roof system is securely attached to the deck", "The existing roof assembly above the deck line is dry or otherwise not deteriorated" and "Fire retardant requirements are maintained" - those six are a commercial-only sealed-professional attestation, not a residential prescriptive standard. Properties in the Historic Preservation Districts or the Escarpment Overlay District need pre-approval before the re-roof permit issues, and the City publishes a separate Re-Roof Escarpment Acknowledgment Letter. Two corrected plan sets are required per re-roof revision. Permit fees are set by the governing body under Section 7-1.3 SFCC 1987 and, per that section, "The schedule of fees adopted by the governing body replaces fees adopted by the state of New Mexico construction industries division as set forth in the New Mexico Administrative Code." Statewide, two Chapter 9 amendments in 14.7.3.17 NMAC are on point for Santa Fe roofing work: added IRC Section R903.2.1 Locations requires, verbatim, that "Approved reglets or an approved flashing shall be installed at wall and roof intersections, wherever there is a change in roof slope or direction and around roof openings"; and the canale and scupper provisions added at R905.9.4/R905.9.5, R905.11.4, R905.12.4 and R905.13.4 require taper board at roof-deck transitions to crickets, valleys and canales and state that "All canales and scuppers must have a metal pan lining extending six inches minimum... All canales or scuppers must have positive drainage." Pumice and other granular fill are barred from roof assemblies.
Inspection requirements
A re-roof in Santa Fe takes at least two inspections: a decking inspection after the existing roof covering comes off, and a final inspection when the new roof system or coating is complete. This is local law in Santa Fe because the City adopts the state permitting and inspection rules by ordinance rather than leaving them to the state. Section 7-1.1(A) SFCC 1987 (Adoption of codes) provides that "the following provisions and codes are adopted by reference and incorporated as fully as if set out herein unless otherwise amended by the city" and lists at (1)-(3) "Section 14.5.1 New Mexico Administrative Code (NMAC) General Provisions", "Section 14.5.2 New Mexico Administrative Code (NMAC) Permits" and "Section 14.5.3 New Mexico Administrative Code (NMAC) Inspections"; the City's own adopted-construction-codes page repeats the same three, as "New Mexico Administrative Code (NMAC): 14.5.1 General Provisions; 14.5.2 Permits; 14.5.3 Inspections". 14.5.2.8(E) NMAC (Roofing) then provides, verbatim: "(1) All new roof installations and re-roofs require building permits and inspections. (2) All applications of roof coating systems require building permits and inspections. (3) Inspections must include, at a minimum, decking inspection upon removal of existing roof and the roof system or application of roof coating systems as a final inspection upon completion of roofing project." 14.5.3.9(B) NMAC lists the inspections required for work subject to the New Mexico Residential Building Code and includes, at (4), verbatim: "New and re-roofs, roof assembly inspection including decking, application of roof systems and application of roof coatings." 14.5.3.8(F) NMAC makes the sequencing binding, verbatim: "Work must be visible to be inspected and shall not be covered or used before approval is given by the inspector. Work that is covered before it is inspected, tested if applicable, and approved may be ordered uncovered by the inspector or AHJ. No work shall be performed beyond what is required for the next inspection without approval of the inspector." Notification must be given not less than 24 hours before the work is to be inspected (14.5.3.8(D) NMAC), and no inspection is performed until the required fees are paid (14.5.3.8(B) NMAC).
Adopted code
Two instruments stack, and they do not print the same edition year. STATE LAYER: New Mexico adopts a statewide residential code at 14.7.3 NMAC (2021 New Mexico Residential Building Code). 14.7.3.8 NMAC ADOPTION states, verbatim: "This rule adopts by reference the 2021 International Residential Code, as amended by this rule." 14.7.3.6 NMAC OBJECTIVE frames it as a floor, verbatim: "The purpose of this rule is to establish minimum standards for the general construction of residential buildings in New Mexico." 14.7.3.5 NMAC makes the rule effective July 14, 2023, and provides that after December 14, 2023 permits may be issued only under it. CITY LAYER: the City of Santa Fe publishes its own adopted-codes list, which prints, verbatim: "The City of Santa Fe has adopted the following set of international and State of New Mexico construction codes, including Santa Fe-specific amendments to the Uniform Plumbing Code and International Fire Code. The City of Santa Fe has also adopted a Green Building Code that applies to the construction of new single-family residential dwellings and accessory dwellings (guest houses)." The residential line on that list reads, verbatim: "2021 NM Residential Building Code (2021 IRC as amended by the state of New Mexico) and City of Santa Fe Green Building Code." The same list adopts NMAC 14.5.1 General Provisions, 14.5.2 Permits and 14.5.3 Inspections, and "2017 ICC A117.1-2017 Accessible and Usable Buildings and Facilities." The codified adopting ordinance is Section 7-1.1 SFCC 1987 (Adoption of codes), which adopts by reference "Section 14.5.1 New Mexico Administrative Code (NMAC) General Provisions", "Section 14.5.2 New Mexico Administrative Code (NMAC) Permits", "Section 14.5.3 New Mexico Administrative Code (NMAC) Inspections" and, at subparagraph (5), "2015 New Mexico Residential Building Code adopted by the state of New Mexico construction industries division (NMAC 14.7.3), as may be amended from time to time, which adopts and amends the International Residential Code (IRC)". The codified text still names the 2015 edition, but its own "as may be amended from time to time" clause carries the adoption forward to the current 14.7.3 NMAC rule, which is the 2021 edition the City's adopted-codes page publishes and the edition the state rule requires permits to be issued under. Santa Fe's genuinely local additions are Section 7-4 SFCC 1987 (Green Building Codes) - a Residential Green Building Code and a Residential Addition and Remodel Green Building Code - and City amendments at Sections 7-1.8 and 7-1.9 to the Uniform Plumbing Code, plus a Section 7-16.4 amendment to IBC Section 2902.2. None of those amend the IRC's roofing chapters.
Mid-roof inspection
Required — Required by Santa Fe's own adopting ordinance, not merely by state practice. Section 7-1.1(A) SFCC 1987 (Adoption of codes) provides that "the following provisions and codes are adopted by reference and incorporated as fully as if set out herein unless otherwise amended by the city", and its first three paragraphs are "(1) Section 14.5.1 New Mexico Administrative Code (NMAC) General Provisions; and (2) Section 14.5.2 New Mexico Administrative Code (NMAC) Permits; and (3) Section 14.5.3 New Mexico Administrative Code (NMAC) Inspections". The City's own adopted-construction-codes page repeats the same three, as "New Mexico Administrative Code (NMAC): 14.5.1 General Provisions; 14.5.2 Permits; 14.5.3 Inspections". Chapter VII SFCC 1987 was read in full and Santa Fe amends none of those three: its only code amendments are Sections 7-1.8 and 7-1.9 to the Uniform Plumbing Code, Section 7-1.10 on when the International Existing Building Code applies, Section 7-16.4 to IBC Section 2902.2, and Section 7-1.3 substituting the City's fee schedule for the Construction Industries Division's. 14.5.2 and 14.5.3 NMAC are therefore Santa Fe law unamended. 14.5.2.8(E) NMAC, Roofing, provides, verbatim: "(1) All new roof installations and re-roofs require building permits and inspections. (2) All applications of roof coating systems require building permits and inspections. (3) Inspections must include, at a minimum, decking inspection upon removal of existing roof and the roof system or application of roof coating systems as a final inspection upon completion of roofing project." 14.5.3.9(B) NMAC lists the inspections required for work subject to the New Mexico Residential Building Code and includes, at (4), verbatim: "New and re-roofs, roof assembly inspection including decking, application of roof systems and application of roof coatings." The decking inspection is taken after the existing covering is stripped and before the new roof system is laid, which is what makes it a mid-roof rather than a final; 14.5.3.8(F) NMAC makes that sequencing binding, verbatim: "Work must be visible to be inspected and shall not be covered or used before approval is given by the inspector."
Impact-resistant roofing
Not required — Checked at both layers Santa Fe residential roofing runs through. CITY LAYER: Chapter VII SFCC 1987 (Building and Housing), Sections 7-1 through 7-16 - the complete local building-code adoption and administration chapter, including Section 7-1.1 Adoption of codes, Section 7-1.5 Building permits, Section 7-1.11 Permit Fees and the whole of Section 7-4 Green Building Codes (the Residential Green Building Code at 7-4.2 and the Residential Addition and Remodel Green Building Code at 7-4.3) - was read in full; no provision anywhere in the chapter addresses impact resistance, UL 2218 or Class 4 roofing. The only roof-covering-classification language the City uses is the fire classification, which its Re-Roof Permit Application collects as "Roof Classification (A, B, or C)" - that is the ASTM E108/UL 790 fire class, not an impact class. The Residential Green Building Code's roofing provisions likewise concern solar reflectance (a minimum initial SRI of 78 for low-sloped and 29 for steep-sloped roofs, calculated per ASTM E1980), roof overhangs and drip edge, and are point-scoring options rather than impact-resistance mandates. STATE LAYER: the 2021 New Mexico Residential Building Code, 14.7.3 NMAC, contains no UL 2218, Class 4 or impact-resistance provision; the state's Chapter 9 amendments at 14.7.3.17 NMAC concern tear-off, reglets and flashing, canales and scuppers, and taper board, and impose no impact-resistance requirement. Neither layer imposes an impact-resistance requirement on Santa Fe residential roofing as adopted.
Repair permit threshold
No dollar, area or layer threshold - the City of Santa Fe requires a permit for roofing work as such. The City's building-permit page states, verbatim, "Building permits are required for most types of construction work within the city," and then enumerates the work that needs one under the heading "Permits are required for the following", a list whose second item is "roofing and re-roofing". The same page enumerates the work that does not need one; under "Permits are not required for the following: Residential" it lists only "Interior and exterior painting of residential structures", "minor landscaping", "carpeting", "tiling", "cabinetry", "countertops" and "exterior decks under 120 square feet if not attached to a structure". Roofing appears on the required list without qualification and does not appear on the exempt list, and no square-footage or valuation cut-off is attached to it. The City's codified permit-fee table, Table 7-1.11-1 at Section 7-1.11 SFCC 1987, likewise contains no roofing-specific fee line and no minimum-value trigger for roofing work; fees for a re-roof are assessed under the general building-permit fee structure the governing body adopts under Section 7-1.3 SFCC 1987, which expressly "replaces fees adopted by the state of New Mexico construction industries division as set forth in the New Mexico Administrative Code." A residential building permit in Santa Fe expires one year from the date of issuance (Section 7-1.6 SFCC 1987).
Roof layer limit / recover
Two existing layers maximum, plus four mandatory tear-off triggers - a statewide New Mexico rule that applies in Santa Fe. 14.7.3.17 NMAC ("CHAPTER 9 ROOF ASSEMBLIES: See this chapter of the IRC except as provided below") deletes IRC Section R908.3 and substitutes, verbatim: "New roof coverings shall not be installed without first removing existing roof coverings where any of the following conditions occur: (1) The existing roof or roof covering is water soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing. (2) The existing roof covering is wood shake, slate, clay, cement, or asbestos-cement tile. (3) The existing roof has two or more applications of any type of roof covering. (4) Where pumice or other granular fill are present, the material must be removed prior to installing a new roof." The pumice/granular-fill trigger at (4) is distinctively New Mexican and matters in Santa Fe, where older flat and low-slope roofs were commonly built up over granular fill. The City of Santa Fe adds nothing on top of this limit: Chapter VII SFCC 1987 (Building and Housing), Sections 7-1 through 7-16, contains no IRC Chapter 9 amendment and no layer restriction of its own. The City does track the count administratively - its own Re-Roof Permit Application requires the applicant to state "No. of Existing Layers" and the "Roof Classification (A, B, or C)" on the face of the application.
Sales & use tax
8.1875% total gross receipts tax rate, GRT Location Code 01-123 (Santa Fe city, Santa Fe County), for the current semiannual edition effective July 1, 2026 through June 30, 2027. New Mexico levies no sales tax. The New Mexico Taxation and Revenue Department states, verbatim, that "Gross receipts tax (GRT) is imposed on businesses, but it is common for a business to pass the GRT on to the purchaser," so a roofing contractor in Santa Fe owes GRT on its own receipts from the job rather than collecting a sales tax from the homeowner. The Department also states, verbatim, that the "GRT rate varies throughout the state because the total rate combines the rates imposed by the state, counties, and municipality for each location," and that "businesses will use the location code and tax rate corresponding to the location where their goods or the product of their service are delivered" - for roofing, that means the rate keys to where the roof is, not to where the contractor's office is. Rates are keyed to a GRT Location Code rather than to a city name and are reissued semiannually. The Department cautions, verbatim, "Identify the appropriate GRT Location Code and tax rate by clicking on the map at the location of interest" and "Please consult local authorities where appropriate to confirm GRT Location Codes and tax rates," so an address near the city limit should be checked against the Department's map rather than assumed - unincorporated Santa Fe County outside the city carries a different location code and a lower rate.

Working an insurance claim in City of Santa Fe, New Mexico - Building Division (Land Use Department)? Everything on this page — drip edge, ice & water shield, inspections, Class 4 rules — formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF) — one page, free.

Buy this jurisdiction's pack — $12 Delivered by email within minutes.

Questions about the City of Santa Fe, New Mexico - Building Division (Land Use Department) pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources