Permitting Authorities / New Mexico / City of Farmington, New Mexico - Building Inspection Division (Community Development)
Do you need a permit to replace a roof in Farmington, NM?
Adopted codeCity of Farmington, New Mexico - Building Inspection Division (Community Development)
Yes, a permit is required to replace a roof in Farmington, NM, issued by City of Farmington, New Mexico - Building Inspection Division (Community Development). The Building Inspection Division is part of Community Development; the Division's own handouts give its address as 800 Municipal Drive, Farmington, NM 87401, phone (505) 599-1304, fax (505) 599-1298. The counter itself is in the Annex Building at 805 Municipal Drive, 2nd floor, across from City Hall. THERE IS NO ONLINE PERMITTING. The City states, verbatim, "We do not have permits online at this time" and "We currently do not accept online payments for permits"; an applicant must come into the office and may pay by check, money order, cashier's check or credit card (American Express, MasterCard and Visa, but not Discover), with credit cards accepted over the phone where necessary. Zoning and setback questions go to the Planning and Zoning Division on (505) 599-1317. Inspections are scheduled by calling (505) 599-1304 with the permit (application) number, at least a day in advance. The City publishes its own design loads: "Minimum roof live load - 20 psf" and "Frost Depth - 24 inches". Farmington also keeps a set of lobby bulletin handouts covering recurring details, among them "FLAT TO PITCHED ROOF", "CID DUPONT TYVEK-STUCCO WRAP" and "BEDROOM OR BASEMENT ESCAPE WINDOWS". A Farmington building permit is valid for two years from issuance and a copy "shall be posted by the permittee at a conspicuous place on or near the construction site at all times from the time work commences until completion of the same" (Section 7-2-1(b) of the City Code); the building official may renew it once, and only on a showing that circumstances beyond the permittee's control prevented completion. Statewide, two Chapter 9 amendments in 14.7.3.17 NMAC are on point for Farmington roofing work: added IRC Section R903.2.1 Locations requires, verbatim, that "Approved reglets or an approved flashing shall be installed at wall and roof intersections, wherever there is a change in roof slope or direction and around roof openings"; and the canale and scupper provisions added at R905.9.4/R905.9.5, R905.11.4, R905.12.4 and R905.13.4 require taper board at roof-deck transitions to crickets, valleys and canales and state that "All canales and scuppers must have a metal pan lining extending six inches minimum... All canales or scuppers must have positive drainage." Pumice and other granular fill are barred from roof assemblies - directly relevant where an older Farmington flat roof is being torn off.
Roof code checklist: Farmington, NM
| Item | Answer | Code cite | Source | Verified |
|---|---|---|---|---|
| Permit to replace a roof | Yes | farmingtonnm.gov | 2026-08-04 | |
| Repair permit threshold | Published | farmingtonnm.gov | 2026-08-04 | |
| Layer limit / roof-over | Published | R908.3 | srca.nm.gov | 2026-08-04 |
| Deck & sheathing | Published | farmingtonnm.gov | 2026-08-04 | |
| Drip edge | Not published | |||
| Ice & water shield | Not published | |||
| Mid-roof inspection | Yes | Sec. 7-2-1 | library.municode.com | 2026-08-04 |
| Impact-resistant (Class 4) roofing | No | library.municode.com | 2026-08-04 | |
| Wind design criteria | Not published | |||
| Adopted code | Published | Sec. 7-2-1 | library.municode.com | 2026-08-04 |
| Contractor license / registration | Yes | srca.nm.gov | 2026-08-04 | |
| Sales & use tax | Published | tax.newmexico.gov | 2026-08-04 |
Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.
- url: https://www.farmingtonnm.gov/905/Residential-Building-Requirements
- phone: 505-599-1304
- license: STATE LICENCE, administered by the New Mexico Regulation and Licensing Department's Construction Industries Division (CID) under the Construction Industries Licensing Act, Chapter 60, Article 13 NMSA 1978. It applies in Farmington exactly as everywhere else in New Mexico, and the City's Building Inspection Division publishes a "Contractor State License Look Up" link on its own permit pages for checking it. Roofing has its own dedicated specialty classification, GS-21, at 14.6.6.9 NMAC, verbatim: "(12) GS-21. Roofing. Requires two years of foreman level practical or related trade experience. Install, alter or repair roof systems on new or existing roof decks to create a weatherproof and waterproof protective membrane, with or without insulation, using asphalt, pitch, tar, sealants, felt, shakes, shingles, roof tile, slate, urethane or any other approved materials including the preparatory work necessary to bring a roof deck or an existing roof to a condition where roofing can be installed, and sealed or repaired; includes cutting, shaping, fabricating, and installing of sheet metal such as cornices, flashing, skylights (excluding alterations to structural framing), roof coatings, gutters, leaders, rainwater downspouts, pans, prefabricated chimneys, at or near roof lines, metal flues, or doing any part of any combination thereof, which relate to and are incidental to roofing projects." Roofing is also subsumed by the general building classifications at 14.6.6.9.B NMAC, verbatim: "(1) GB-2. Residential. Requires two years of foreman level practical or related trade experience. Erect, alter, repair or demolish residences and apartment houses accommodating not more than four family units... includes all work described by the GS specialty classifications, provided the work is limited to residential construction as defined under this provision. (2) GB-98. General building. Requires four years of foreman level practical or related trade experience of which at two years must be commercial experience. Erect, alter, repair or demolish residential and commercial buildings, and certain structures; includes all work authorized by the GB-2, GF-5, GF-7 and GS classifications..." So a standalone roofing subcontractor holds GS-21, while a general contractor re-roofing as part of building or remodelling the whole structure holds GB-2 or GB-98 and needs no separate GS-21 for that work. BOND: Section 60-13-49(B) NMSA 1978 applies to every classification including GS-21 with no roofing-specific variance, verbatim: "B. Proof of responsibility shall be a bond of ten thousand dollars ($10,000) acceptable to the director and underwritten by a corporate surety authorized to transact business in New Mexico." Section 60-13-51 NMSA 1978 bars a municipality from stacking an additional local bond on a CID licensee, verbatim: "No municipality shall require any person or corporation licensed under the provisions of the Construction Industries Licensing Act to file or obtain as a condition of doing business as a licensed contractor within the municipality any additional license bond as proof of responsibility if the person or corporation has met the responsibility requirements of the commission." INSURANCE: workers' compensation coverage is required under the Workers' Compensation Act, and Section 60-13-23(I) NMSA 1978 makes "failure to maintain workers' compensation insurance as required by the Workers' Compensation Act" a ground for revocation or suspension of the licence. THRESHOLD: there is no roofing-specific dollar threshold. The only no-licence path is the general casual-work exemption at Section 60-13-3(D)(14) NMSA 1978, covering "an individual who works on one undertaking or project at a time that, in the aggregate or singly, does not exceed seven thousand two hundred dollars ($7,200) compensation a year, the work being casual, minor or inconsequential, such as handyman repairs..." - conditioned on the work not being held out as a contracting business and on an annual declaration filed with CID. That is not a "small roofing jobs are exempt" rule. Owner-builder exemptions at Section 60-13-3(D)(10)-(11) cover an individual working on their own owner-occupied dwelling, who must still comply with all codes and permits; Farmington's residential page confirms that "The homeowner or a contractor representing the owner may take out a building permit." CITY LAYER: Farmington requires a City business registration of every contractor and subcontractor working inside the city limits, and says so directly on its permit page, verbatim: "CITY OF FARMINGTON BUSINESS LICENSE IS NEEDED WITHIN THE CITY LIMITS **Any person, business or company (including subcontractors) conducting business within the city limits of Farmington, New Mexico must have a City of Farmington Business License." The underlying ordinance is Chapter 8, Article 2 of the Farmington City Code; Section 8-2-1(a) provides, verbatim: "It shall be unlawful for any person to engage in, conduct or carry on any business or occupation within the city without first registering the business or occupation or obtaining a license therefor and without first paying the fees, in compliance with this chapter." The City Clerk administers it - the annual fee is payable per outlet, branch or location before engaging in business, and the Business Registration office is reachable on (505) 599-1170.
Local roofing hub
More roof permit pages in New Mexico
Related guides
The permitting authority for the City of Farmington, New Mexico (San Juan County), the largest city in the state's northwest corner. The Building Inspection Division sits inside Community Development and issues building, plumbing, mechanical and electrical permits for work inside the city limits; roofing is named on the City's own permit-required list as "Roof, Overlay, Re-roof, Structural Roof Renovations". Farmington is a self-administering jurisdiction under Section 60-13-41(D) NMSA 1978, which lets a municipality inspect work under its own permits where it employs a certified building official and has adopted the current minimum code standards; New Mexico's default under Section 60-13-41(E) is that the state Construction Industries Division (CID) inspects where a jurisdiction has no certified building official in its employ. Farmington's adopting ordinance is unusually broad and unusually current: rather than naming edition years that go stale, City Code Section 7-2-1 adopts by reference whatever building standards the Construction Industries Division has adopted in NMAC Title 14, Chapters 5 through 10, subject to five named local exceptions - so the state permitting, inspection and residential-code rules are Farmington's own law, and the City then layers its own permit-exemption threshold, permit-life, investigation-fee and inspection amendments on top. The City also publishes its own design loads and its own lobby bulletin handouts, one of which prescribes the sheathing and underlayment for putting a pitched roof on a flat-roofed house - a common re-roof in Farmington. Permits are not available online; applications are taken in person at the Community Development annex at 805 Municipal Drive.
Hail reports near Farmington, NM
- Reports, last 24 months
- 3
- Largest, last 24 months
- 1.00 in Sep 18, 2026
- Most recent
- Sep 18, 2026 1.00 in
- Reports, last 5 years
- 4
| Date | Hail size | Distance |
|---|---|---|
| Sep 18, 2026 | 1.00 in | 2 mi NW |
| Sep 18, 2026 | 1.00 in | 2 mi NE |
| Jun 3, 2025 | 1.00 in | 2 mi NE |
| Jun 21, 2024 | 1.75 in | 9 mi SE |
Source: NOAA Storm Prediction Center severe weather database and daily storm reports (reports since the start of the current year are preliminary), within 10 miles of Farmington, NM (Census point). Data through Oct 7, 2026, not updated since. A report is an observation, not a damage record.
Working an insurance claim in Farmington, NM? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).
Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.
Questions about the Farmington, NM pack?
Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.
Sources
- farmingtonnm.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- srca.nm.gov verified 2026-08-04
- rld.nm.gov verified 2026-08-04
- library.municode.com verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- library.municode.com verified 2026-08-04
- srca.nm.gov verified 2026-08-04
- srca.nm.gov verified 2026-08-04
- srca.nm.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04
- tax.newmexico.gov verified 2026-08-04
- tax.newmexico.gov verified 2026-08-04
- farmingtonnm.gov verified 2026-08-04