Permitting Authorities / Missouri / City of Raymore - Building Inspection Division

Do you need a permit to replace a roof in Raymore, MO?

Adopted code

City of Raymore - Building Inspection Division

Yes, a permit is required to replace a roof in Raymore, MO, issued by City of Raymore - Building Inspection Division. The City lists a Roofing Permit among its building permit applications. The Building Inspection Division's "Residential Roofing Application / Permit" form asks whether the job is a complete tear-off and "How many layers are present?", and states: "Ice and Water Shield is required per IRC Table R301.2(1) & Ch. 9". Where wood is used, the applicant must "provide documentation verifying the product is a minimum Class C roof covering". The owner's affidavit certifies that the work "will conform to the regulations in the Codes adopted by the City of Raymore, specifically IRC Section R907 and all applicable ordinances.".

Roof code checklist: Raymore, MO

ItemAnswerCode citeSourceVerified
Permit to replace a roofYesraymore.com2026-10-22
Repair permit thresholdNot published
Layer limit / roof-overPublishedR908.3.1.1amending code copy 2019088 Adopti...2026-10-22
Deck & sheathingNot published
Drip edgeNot published
Ice & water shieldYesamending code copy 2019088 Adopti...2026-10-22
Mid-roof inspectionYesRoofing Permit Application.pdf2026-10-22
Impact-resistant (Class 4) roofingNot published
Wind design criteriaPublishedamending code copy 2019088 Adopti...2026-10-22
Adopted codePublishedraymore.com2026-10-22
Contractor license / registrationYescontractor licensing code_2015072...2026-10-22
Sales & use taxPublisheddor.mo.gov2026-10-22

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
City of Raymore, Missouri
Jurisdiction type
city
Address
100 Municipal Circle, Raymore, MO 64083
Contact
  • url: https://www.raymore.com/government/city_departments/development_services/building_inspections.php
  • phone: 816-331-7916
Permit portal
Roofing permit required
Required
Contractor registration required
Required
Registration details
  • city_level: Raymore City Code Section 605.025, Contractor Licensing, as posted on the City's Building Inspection Division page, sets five licence classes and provides that "A Class E contractor may obtain a building permit for any work that does not require a Class A, Class B, Class C or Class D contractor to obtain a permit, such as a fence permit, deck permit, sign permit, roof permit, swimming pool permit". Owner-occupants of single-family homes may work on their own residence without first obtaining a contractor's licence.
Permit process note
The City lists a Roofing Permit among its building permit applications. The Building Inspection Division's "Residential Roofing Application / Permit" form asks whether the job is a complete tear-off and "How many layers are present?", and states: "Ice and Water Shield is required per IRC Table R301.2(1) & Ch. 9". Where wood is used, the applicant must "provide documentation verifying the product is a minimum Class C roof covering". The owner's affidavit certifies that the work "will conform to the regulations in the Codes adopted by the City of Raymore, specifically IRC Section R907 and all applicable ordinances."
Adopted code
The Building Inspection Division's page states: "City Council adopted a reorganized Chapter 500: Building Code and the most recent editions of the building codes utilized by the City to regulate the construction of residential and non-residential buildings. The current Raymore Building Code became effective Jan. 1, 2020, with local amendments." Its list of adopted codes includes "2018 International One and Two-Family Code (IRC)" and "2018 International Existing Building Code (IEBC)."
Ice & water shield
Required — Raymore City Code Section 500.175, adopting the 2018 International Residential Code with local amendments (Ordinance 2019-088, adopting a new Chapter 500), sets out Table R301.2(1), Climatic and Geographic Design Criteria, with YES under Ice Barrier Underlayment Required. About ice & water barrier
Mid-roof inspection
Required — The City's Residential Roofing Application / Permit form records two inspections under "Office Use Only": "Tear Off / Felt or Ice and Water Shield / Metal Flashings" and "Final Inspection / Job Completion". The first is taken at tear-off, before the new covering is complete.
Wind design criteria
115 mph wind speed; seismic design category A; ground snow load 20 psf; winter design temperature 6 degrees F. (Table R301.2(1) in Raymore City Code Section 500.175, Ordinance 2019-088; the table lists no topographic, special wind region or windborne debris entries.)
Roof layer limit / recover
Raymore City Code Section 500.175 (Ordinance 2019-088), amending the 2018 International Residential Code, enacts: "Roof replacement shall include the removal of all existing layers of roof coverings down to the roof deck." The same section deletes R908.3.1 Roof recover, R908.3.1.1 Roof recover not allowed, and R908.4 Roof recovering. Its exceptions allow an adhered ice barrier membrane to stay in place under a new layer of ice barrier membrane, allow complete and separate roofing systems such as standing-seam metal panels that do not rely on the existing roof for support, and allow a new protective roof coating over listed existing coverings. An asphalt shingle roof is torn off to the deck before re-roofing.
Sales & use tax
Raymore's combined sales tax rate is 9.1% (use tax 5.85%), jurisdiction code 60752-037-000, per the Missouri Department of Revenue's Jurisdiction and Total Rate Database for the fourth quarter of 2026. The same table lists 9 smaller rate areas inside the city where special taxing districts (community improvement, fire protection and transportation development districts among them) add tax, at a combined sales rate of 9.35% to 10.1%. Missouri's own state rate is 4.225%; the rest is local. For a re-roof, 12 CSR 10-112.010(1) provides that "a contractor is the final user and consumer of the materials and supplies used and consumed in fulfilling a construction contract and which become part of a completed real property improvement," so the roofer pays tax when it buys the materials. Under 12 CSR 10-112.010(2)(A), "In general, title passes after installation is complete," and where title passes after attachment the contractor "does not collect tax on its transfer of ownership or title of the item."

The Building Inspection Division issues building permits in the City of Raymore, Missouri (Cass County), from 100 Municipal Circle. The City lists the 2018 International One and Two-Family Code (IRC) among its adopted codes, under a Raymore Building Code effective January 1, 2020. This listing covers the office's contact details and the local sales tax rate, the city's contractor licence rule, and the code facts quoted below; it does not cover every local permit rule.

Working an insurance claim in Raymore, MO? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like ice & water shield are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Raymore, MO pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Roofing questions: Raymore, MO

Do you need a permit to replace a roof in Raymore, MO?

Yes, a permit is required to replace a roof in Raymore, MO.

Is ice & water shield required in Raymore, MO?

Yes. Raymore City Code Section 500.175, adopting the 2018 International Residential Code with local amendments (Ordinance 2019-088, adopting a new Chapter 500), sets out Table R301.2(1), Climatic and Geographic Design Criteria, with YES under Ice Barrier Underlayment Required.

Can you roof over an existing roof in Raymore, MO?

Raymore City Code Section 500.175 (Ordinance 2019-088), amending the 2018 International Residential Code, enacts: "Roof replacement shall include the removal of all existing layers of roof coverings down to the roof deck." The same section deletes R908.3.1 Roof recover, R908.3.1.1 Roof recover not allowed, and R908.4 Roof recovering. Its exceptions allow an adhered ice barrier membrane to stay in place under a new layer of ice barrier membrane, allow complete and separate roofing systems such as standing-seam metal panels that do not rely on the existing roof for support, and allow a new protective roof coating over listed existing coverings. An asphalt shingle roof is torn off to the deck before re-roofing.

Do roofing contractors need a license or registration in Raymore, MO?

Yes.

What building code does Raymore, MO use?

The Building Inspection Division's page states: "City Council adopted a reorganized Chapter 500: Building Code and the most recent editions of the building codes utilized by the City to regulate the construction of residential and non-residential buildings. The current Raymore Building Code became effective Jan. 1, 2020, with local amendments." Its list of adopted codes includes "2018 International One and Two-Family Code (IRC)" and "2018 International Existing Building Code (IEBC)."

Is a mid-roof inspection required in Raymore, MO?

Yes. The City's Residential Roofing Application / Permit form records two inspections under "Office Use Only": "Tear Off / Felt or Ice and Water Shield / Metal Flashings" and "Final Inspection / Job Completion". The first is taken at tear-off, before the new covering is complete.