Permitting Authorities / Tennessee / City of Murfreesboro Building and Codes Department

Do you need a permit to replace a roof in Murfreesboro, TN?

Adopted code

City of Murfreesboro Building and Codes Department

No, Murfreesboro, TN does not require a permit for like-for-like roof replacement (City of Murfreesboro Building and Codes Department). NO PERMIT FOR A REROOF THAT LEAVES THE DECK AND FRAMING ALONE. City Code Section 7-12(D) exempts "Roof covering replacement that does not involve the replacement of the roof deck or framing." If the tear-off turns up decking or framing that has to be replaced, the job needs a permit, so stop and apply before replacing it. The cost of guessing wrong: Section 7-12(L) amends Section R108.6, work commencing before permit issuance, so that a person who starts without the permit is "required to pay two times the established fee for the required permit", which the Chief Building Official may waive for good cause. Murfreesboro building permits are administered by the Building and Codes Department at City Hall, 111 W. Vine Street. The city's Residential Permits page states residential permit applications may be submitted by email or in person, with roughly 2 weeks allowed for processing; once approved, the applicant is notified of fees and payment options. Building permit and inspection services are also available through the city's online Permit Center. Where a permit is required, homeowners may pull their own residential permit for their primary residence, but a Tennessee-licensed contractor is required if the property is a rental.

Roof code checklist: Murfreesboro, TN

ItemAnswerCode citeSourceVerified
Permit to replace a roofNolibrary.municode.com2026-08-08
Repair permit thresholdPublishedR105.2library.municode.com2026-09-23
Layer limit / roof-overPublishedR908.3.1.1murfreesborotn.gov2026-08-08
Deck & sheathingPublishedR803murfreesborotn.gov2026-08-08
Drip edgeYesR905.2.8.5murfreesborotn.gov2026-08-08
Ice & water shieldNomurfreesborotn.gov2026-08-08
Mid-roof inspectionNomurfreesborotn.gov2026-08-08
Impact-resistant (Class 4) roofingNomurfreesborotn.gov2026-08-08
Wind design criteriaPublishedmurfreesborotn.gov2026-08-08
Adopted codePublishedmurfreesborotn.gov2026-08-08
Contractor license / registrationYestn.gov2026-08-08
Sales & use taxPublishedrutherfordcountytn.gov2026-08-08

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
City of Murfreesboro, Tennessee
Jurisdiction type
city
Address
Murfreesboro, TN
Contact
  • url: https://www.murfreesborotn.gov/2002/Residential-Permits
  • phone: 615-893-3750
Permit portal
Roofing permit required
Not required
Contractor registration required
Required
Registration details
  • license: STATE-LICENSED, TWO TIERS, PLUS A NARROWER CITY LICENSE FOR ELECTRICAL WORK ONLY. Roofing in Murfreesboro is licensed by the State of Tennessee, not by the city, and Rutherford County is one of the nine counties where the state's lower licensing tier applies. (1) STATE, upper tier -- the Tennessee Board for Licensing Contractors requires a Contractor's License (T.C.A. tit. 62, ch. 6) for "projects of $25,000 or more when acting as a prime contractor, certain subcontractor, or construction manager/consultant," and the Board's own page states subcontractors performing roofing work must be licensed "when contracting directly with a contractor, not the owner... when that portion of the project is $25,000 or more." This applies statewide, including Murfreesboro. (2) STATE, lower tier -- a separate Home Improvement License is required for "residential remodeling projects from $3,000 to $24,999" in nine named counties: "Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford, and Shelby." RUTHERFORD COUNTY, WHICH CONTAINS MURFREESBORO, IS ON THAT LIST, and the Board's own page names "roofing, painting, and other improvements" among the covered work types. So a Murfreesboro roofing job of $3,000 or more triggers a state licence even below the $25,000 general-contractor threshold. Below $3,000 neither state tier is triggered. (3) CITY -- the City of Murfreesboro's own Building and Codes Department licensing page describes only an Electrical license (issued under City Code Section 11-50, administered by the city's Board of Electrical Examiners); it names no separate city roofing-contractor or general-contractor credential. The city's Residential Permits page notes that for rental properties a Tennessee-licensed contractor must obtain the permit.
Permit process note
NO PERMIT FOR A REROOF THAT LEAVES THE DECK AND FRAMING ALONE. City Code Section 7-12(D) exempts "Roof covering replacement that does not involve the replacement of the roof deck or framing." If the tear-off turns up decking or framing that has to be replaced, the job needs a permit, so stop and apply before replacing it. The cost of guessing wrong: Section 7-12(L) amends Section R108.6, work commencing before permit issuance, so that a person who starts without the permit is "required to pay two times the established fee for the required permit", which the Chief Building Official may waive for good cause. Murfreesboro building permits are administered by the Building and Codes Department at City Hall, 111 W. Vine Street. The city's Residential Permits page states residential permit applications may be submitted by email or in person, with roughly 2 weeks allowed for processing; once approved, the applicant is notified of fees and payment options. Building permit and inspection services are also available through the city's online Permit Center. Where a permit is required, homeowners may pull their own residential permit for their primary residence, but a Tennessee-licensed contractor is required if the property is a rental.
Inspection requirements
For permitted new residential construction, the Building and Codes Department's Inspection Checklist sets out four inspection stages in order: (1) Foundation -- including erosion-control measures, plumbing-in-slab testing, and footing/steel placement; (2) Framing/Rough-In -- the structure must be "dried-in" (roof covering applied, housewrap on sheathing, exterior doors/windows sealed) with electrical, plumbing, and gas rough-ins complete; (3) Energy Efficiency/Insulation; and (4) Final -- all trade finals complete, grading and erosion protection in place, site clear of debris. Electrical work has its own three-stage sequence (Underground/Slab, Rough-In, Final) scheduled alongside the building inspections. Inspections are requested by phone at 615-893-3750 (8:00 am-4:30 pm) with the permit number and inspection type. For roofing work that does require a permit (deck or framing replacement), the roof-covering step is verified as part of the Framing/Rough-In inspection rather than as a separate roof-only inspection -- see midroof_inspection_required.
Adopted code
The City of Murfreesboro adopts the 2018 International Residential Code, including Appendix Chapters D, G, H, J, K and T, by Ordinance 18-O-71, codified at Murfreesboro City Code Sections 7-11 (International Residential Code -- Adopted) and 7-12 (International Residential Code -- Amended). Ordinance 18-O-71 (read in full, all 15 sections and its lettered amendment lists) passed second and final reading January 17, 2019, and by its own Section 15 took effect February 1, 2019 (or 15 days after passage, whichever last occurred). The same ordinance also adopted, in the same instrument, the 2018 International Building Code, 2018 International Existing Building Code, 2018 International Mechanical Code, 2018 International Energy Conservation Code, 2017 National Electrical Code, 2018 International Fire Code, 2018 International Fuel Gas Code, 2018 International Property Maintenance Code, 2018 International Plumbing Code, and 2018 International Swimming Pool and Spa Code, each in its own numbered City Code chapter/section.
Drip edge
Required — Ordinance 18-O-71's complete list of local 2018 IRC amendments (items A through RR of Section 4), read in full, does not touch Chapter 9, Roof Assemblies, so the base 2018 IRC drip-edge provision, IRC Section R905.2.8.5, applies unmodified in Murfreesboro. About drip edge
Ice & water shield
Not required — Ordinance 18-O-71, Section 4(N), amends Table R301.2(1), Climatic and Geographic Design Criteria, by inserting the city's specific values into the table, including the row "Ice Barrier Underlayment Required" set to "No." No separate ice-barrier provision appears elsewhere among the ordinance's local amendments. About ice & water barrier
Mid-roof inspection
Not required — The City of Murfreesboro's own two-page Inspection Checklist (Building and Codes Department, read in full) lists the required inspection sequence for residential construction -- Foundation, Framing/Rough-In, Energy Efficiency/Insulation, Final, and Electrical (Underground/Slab, Rough-In, Final) -- and names no separate, standalone roofing, mid-roof, or dry-in inspection. The only roof-related item is that the structure must be "dried-in," i.e. roof covering applied, before the Framing/Rough-In inspection is called for new construction; that is a precondition for an existing inspection stage, not a distinct roofing inspection. The city's Residential Permits page and Permit Center page, also read, likewise describe no roofing-specific or mid-progress inspection step.
Impact-resistant roofing
Not required — Ordinance 18-O-71's complete list of local 2018 IRC amendments (items A through RR of Section 4), read in full, amends only administrative/permit-exemption sections, Table R301.2(1), exterior-wall setbacks, egress, fire-sprinkler and accessibility provisions, energy-code Chapter 11, and various plumbing/gas sections; no provision in Chapter 9, Roof Assemblies, is touched. No UL 2218 or Class 4 impact-rating requirement appears among the city's local amendments.
Repair permit threshold
Murfreesboro City Code Section 7-12(D) (Ord. No. 18-O-71, Section 4) amends IRC Section R105.2, building work exempt from permit, by substituting as exemption 2: "Roof covering replacement that does not involve the replacement of the roof deck or framing." CITY-SPECIFIC EXEMPTION. An ordinary roof-covering replacement, tear-off and reroof or overlay, that does not touch the roof deck or structural framing does not require a City of Murfreesboro building permit, whatever its size or cost. Roofing work that does involve replacing the roof deck or framing falls outside this exemption and requires a permit.
Wind design criteria
Per Table R301.2(1), Climatic and Geographic Design Criteria, as amended by Ordinance 18-O-71 Section 4(N) with values specific to Murfreesboro: Ground Snow Load 10 lbs.; Wind Design Speed 115 mph; Topographic Effects No; Special Wind Region No; Windborne Debris Zone No; Seismic Design Category B; Weathering Severe; Frost Line Depth 12 inches; Termite damage risk Moderate to Heavy; Winter Design Temperature 14 degrees F; Ice Barrier Underlayment Required No; Air Freezing Index 366; Mean Annual Temp 59 degrees F. The same amendment adds a Manual J design-criteria supplement (elevation 615 ft, latitude 35 degrees North, winter/summer indoor and outdoor design temperatures and humidity notes) referencing a footnote requiring those values to be determined using Manual J Design Criteria.
Roof layer limit / recover
The City of Murfreesboro adopts the 2018 IRC by Ordinance 18-O-71. The ordinance's complete, self-contained list of local IRC amendments (items A through RR of Section 4, read in full), together with the rest of the 15-section ordinance, does not touch Chapter 9 (Roof Assemblies) or any roof-covering provision -- its IRC amendments instead reach only administrative/permit-exemption sections, Table R301.2(1) (climatic and geographic design criteria), exterior wall setbacks, opening protection, means of egress from bedrooms, fire sprinkler and accessibility provisions, energy-code Chapter 11 and its tables, and various plumbing/gas sections. Because Chapter 9 is untouched, the base 2018 IRC's own roof-recover/roof-replacement layer provision, IRC Section R908.3, applies unmodified in Murfreesboro. Base-code rule, read at 2018 IRC Section R908.3.1.1 (Roof recover not allowed) and quoted here rather than left behind the ICC paywall: a roof recover "shall not be permitted" where "the existing roof has two or more applications of any type of roof covering" (nor where the existing covering is water soaked or deteriorated, or is slate, clay, cement or asbestos-cement tile). One existing layer may therefore be recovered; a second existing layer forces tear-off to the deck.
Deck & sheathing requirements
The City of Murfreesboro adopts the 2018 IRC by Ordinance 18-O-71. The ordinance's complete list of local IRC amendments (items A through RR of Section 4), read in full, does not touch Chapter 8 (Roof-Ceiling Construction, where the base IRC's roof sheathing provisions live) or Chapter 9 (Roof Assemblies). So the base 2018 IRC provision on roof deck sheathing, IRC Section R803, applies unmodified in Murfreesboro.
Fastening requirements
Murfreesboro adopts the 2018 IRC by Ordinance No. 18-O-71, and the city's own local amendments to it (Code of Ordinances Sec. 7-12(A) through (RR), read in full) contain no nailing-pattern or fastener-specific provision for roof coverings -- the amendment list does not touch Section R905 at all. The base 2018 IRC's own fastening requirements apply unmodified within the city; this record does not restate that unread base-code text. About roofing nails
Sales & use tax
Murfreesboro's combined general sales and use tax rate is 9.75%: the Tennessee state rate of 7.00% plus the Rutherford County local option rate of 2.75%. No separate City of Murfreesboro municipal sales tax or special-district add-on applies on top of the county's local option rate. The Tennessee Department of Revenue's own Local Sales Tax Rates Map (the state's authoritative published source for the local-option component) is delivered as a JS/Tableau-embedded interactive tool that does not expose extractable text directly. Rutherford County's own government website publishes an official Sales Tax Calculator whose underlying code sets the combined rate at 9.75% for purchases under $3,200, split as a 7.00% state rate plus the county's local option rate applied on top, consistent with the DOR's published statewide 7.00% base rate.

The permitting authority for the City of Murfreesboro, Tennessee (Rutherford County). Murfreesboro administers its own residential building permitting and code enforcement through its Building and Codes Department, issuing permits for alterations, renovations, additions and new construction of single family dwellings, zero-lot-line homes and duplexes within the city limits.

Hail reports near Murfreesboro, TN

Reports, last 24 months
3
Largest, last 24 months
1.75 in May 20, 2025
Most recent
May 20, 2025 1.75 in
Reports, last 5 years
16
5 most recent reports, last 5 years
DateHail sizeDistance
May 20, 20251.75 in9 mi SW
May 20, 20251.50 in9 mi S
May 20, 20251.50 in8 mi SE
May 26, 20241.75 in1 mi WSW
May 26, 20241.50 in2 mi SSE

Source: NOAA Storm Prediction Center severe weather database and daily storm reports (reports since the start of the current year are preliminary), within 10 miles of Murfreesboro, TN (Census point). Data through Oct 7, 2026, not updated since. A report is an observation, not a damage record.

Working an insurance claim in Murfreesboro, TN? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like drip edge and ice & water shield are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Murfreesboro, TN pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

The cheat sheet is free; the box above is optional. How we use your address: Privacy Policy.

Sources

Roofing questions: Murfreesboro, TN

Do you need a permit to replace a roof in Murfreesboro, TN?

No, Murfreesboro, TN does not require a permit to replace a roof. Murfreesboro City Code Section 7-12(D) (Ord. No. 18-O-71, Section 4) amends IRC Section R105.2, building work exempt from permit, by substituting as exemption 2: "Roof covering replacement that does not involve the replacement of the roof deck or framing." CITY-SPECIFIC EXEMPTION. An ordinary roof-covering replacement, tear-off and reroof or overlay, that does not touch the roof deck or structural framing does not require a City of Murfreesboro building permit, whatever its size or cost. Roofing work that does involve replacing the roof deck or framing falls outside this exemption and requires a permit.

Is ice & water shield required in Murfreesboro, TN?

No. Ordinance 18-O-71, Section 4(N), amends Table R301.2(1), Climatic and Geographic Design Criteria, by inserting the city's specific values into the table, including the row "Ice Barrier Underlayment Required" set to "No." No separate ice-barrier provision appears elsewhere among the ordinance's local amendments.

Is drip edge required in Murfreesboro, TN?

Yes. Ordinance 18-O-71's complete list of local 2018 IRC amendments (items A through RR of Section 4), read in full, does not touch Chapter 9, Roof Assemblies, so the base 2018 IRC drip-edge provision, IRC Section R905.2.8.5, applies unmodified in Murfreesboro.

Can you roof over an existing roof in Murfreesboro, TN?

The City of Murfreesboro adopts the 2018 IRC by Ordinance 18-O-71. The ordinance's complete, self-contained list of local IRC amendments (items A through RR of Section 4, read in full), together with the rest of the 15-section ordinance, does not touch Chapter 9 (Roof Assemblies) or any roof-covering provision -- its IRC amendments instead reach only administrative/permit-exemption sections, Table R301.2(1) (climatic and geographic design criteria), exterior wall setbacks, opening protection, means of egress from bedrooms, fire sprinkler and accessibility provisions, energy-code Chapter 11 and its tables, and various plumbing/gas sections. Because Chapter 9 is untouched, the base 2018 IRC's own roof-recover/roof-replacement layer provision, IRC Section R908.3, applies unmodified in Murfreesboro. Base-code rule, read at 2018 IRC Section R908.3.1.1 (Roof recover not allowed) and quoted here rather than left behind the ICC paywall: a roof recover "shall not be permitted" where "the existing roof has two or more applications of any type of roof covering" (nor where the existing covering is water soaked or deteriorated, or is slate, clay, cement or asbestos-cement tile). One existing layer may therefore be recovered; a second existing layer forces tear-off to the deck.

Do roofing contractors need a license or registration in Murfreesboro, TN?

Yes. STATE-LICENSED, TWO TIERS, PLUS A NARROWER CITY LICENSE FOR ELECTRICAL WORK ONLY. Roofing in Murfreesboro is licensed by the State of Tennessee, not by the city, and Rutherford County is one of the nine counties where the state's lower licensing tier applies. (1) STATE, upper tier -- the Tennessee Board for Licensing Contractors requires a Contractor's License (T.C.A. tit. 62, ch. 6) for "projects of $25,000 or more when acting as a prime contractor, certain subcontractor, or construction manager/consultant," and the Board's own page states subcontractors performing roofing work must be licensed "when contracting directly with a contractor, not the owner... when that portion of the project is $25,000 or more." This applies statewide, including Murfreesboro. (2) STATE, lower tier -- a separate Home Improvement License is required for "residential remodeling projects from $3,000 to $24,999" in nine named counties: "Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford, and Shelby." RUTHERFORD COUNTY, WHICH CONTAINS MURFREESBORO, IS ON THAT LIST, and the Board's own page names "roofing, painting, and other improvements" among the covered work types. So a Murfreesboro roofing job of $3,000 or more triggers a state licence even below the $25,000 general-contractor threshold. Below $3,000 neither state tier is triggered. (3) CITY -- the City of Murfreesboro's own Building and Codes Department licensing page describes only an Electrical license (issued under City Code Section 11-50, administered by the city's Board of Electrical Examiners); it names no separate city roofing-contractor or general-contractor credential. The city's Residential Permits page notes that for rental properties a Tennessee-licensed contractor must obtain the permit.

What building code does Murfreesboro, TN use?

The City of Murfreesboro adopts the 2018 International Residential Code, including Appendix Chapters D, G, H, J, K and T, by Ordinance 18-O-71, codified at Murfreesboro City Code Sections 7-11 (International Residential Code -- Adopted) and 7-12 (International Residential Code -- Amended). Ordinance 18-O-71 (read in full, all 15 sections and its lettered amendment lists) passed second and final reading January 17, 2019, and by its own Section 15 took effect February 1, 2019 (or 15 days after passage, whichever last occurred). The same ordinance also adopted, in the same instrument, the 2018 International Building Code, 2018 International Existing Building Code, 2018 International Mechanical Code, 2018 International Energy Conservation Code, 2017 National Electrical Code, 2018 International Fire Code, 2018 International Fuel Gas Code, 2018 International Property Maintenance Code, 2018 International Plumbing Code, and 2018 International Swimming Pool and Spa Code, each in its own numbered City Code chapter/section.