Permitting Authorities / Town of Monument (permits via Pikes Peak Regional Building Department)

Do you need a permit to replace a roof in Monument, CO?

Adopted code

Town of Monument (permits via Pikes Peak Regional Building Department)

Yes — a permit is required to replace a roof in Monument, CO, issued by Town of Monument (permits via Pikes Peak Regional Building Department). Town permit applications are submitted, tracked, and paid through the Community Connect portal, with town review taking 3-5 business days from acceptance. Some projects also require a submittal with the Pikes Peak Regional Building Department, which issues building permits for the town.

Jurisdiction
Town of Monument, Colorado
Jurisdiction type
city
Address
Monument, CO
Contact
  • url: https://www.townofmonument.org/433/Permits
  • phone: 719-481-2954
Roofing permit required
Required
Contractor registration required
Required
Registration details
  • license: All businesses operating within the Town of Monument, including contractors, subcontractors, and out-of-town contractors, are required to first obtain a business license through the Town Clerk before a permit application can be submitted.
Permit process note
Town permit applications are submitted, tracked, and paid through the Community Connect portal, with town review taking 3-5 business days from acceptance. Some projects also require a submittal with the Pikes Peak Regional Building Department, which issues building permits for the town.
Adopted code
The Town of Monument adopts the Pikes Peak Regional Building Code (International Codes with regional amendments administered by the Pikes Peak Regional Building Department).
Drip edge
Ice & water shield
Required — PPRBD reroof guidelines: "Elevations of the property is listed on the permit receipt. Properties that are above 7,000 ft. elevation require an ice barrier to be installed. This barrier shall consist of not fewer than two layers of underlayment cemented together, or a self-adhering, polymer-modified bitumen sheet, and shall extend from the eave's edge to a point of at least 24 inches inside the exterior wall line of the building." Confirmed by PPRBD homeowner FAQ: "If the elevation on the property is more than 7,000 feet, ice and water shield is required. If it is below 7,000 feet in elevation, it is not required." Trigger is per-property elevation (shown on the permit receipt), not a town-wide rule. About ice & water barrier
Mid-roof inspection
Required — PPRBD reroof guidelines: "Typical asphalt roofing materials and Direct-To-Deck metal shingles on residential homes do not require a mid-roof inspection." Tile roofs DO require one: PPRBD homeowner FAQ states "A tile roof requires a mid-roof inspection as well as a final inspection," and the guidelines describe a dedicated "roof dry-in inspection... (Tile Roof) (BTR)" performed after underlayment/battens/ flashing are in place and before tile is stocked or installed. So: not required for standard asphalt or direct-to-deck metal reroofs; required for tile roofs only.
Impact-resistant roofing
Not required — The Town adopts the Pikes Peak Regional Building Code, 2023 Edition, by reference (Ordinance No. 05-2023, April 17, 2023, codified at Monument Municipal Code ch. 15.04), and the Pikes Peak Regional Building Department administers it. Both instruments were reviewed in full: the Town's ordinance makes a single amendment, to the permit fee schedule, and the Regional Code's residential roofing amendments (2nd Printing, in force since June 30, 2026) cover roof drainage, underlayment, face nailing, roof dead load, roof replacement and roof-recover. Neither contains an impact-resistance or UL 2218 Class 4 requirement, and IRC Section R905.2.4 is not amended.
Repair permit threshold
"It is violation of Code for any person to contract or perform reroofs (for repairs more than 100 square feet) without a license unless you own the residential property AND it is your primary residence. Any repair or replacement work done over 100 sq. ft requires a permit whether a licensed contractor or homeowner is performing the work." (2023 PPRBC Section 105.2.1, Item 14)
Wind design criteria
130 mph ultimate design wind speed (Vult), minimum Exposure Category C, topographic effects No, special wind region Yes, windborne debris zone No, Seismic Design Category B (Table R301.2(1) as amended by Section RBC303.4.2 of the 2023 Pikes Peak Regional Building Code, which adopts the 2021 IRC by reference for the Residential Building Code governing the Town of Monument).
Roof layer limit / recover
"Section R908.3.1 Roof-recover. Delete." (RBC303.4.73) -- the IRC's roof-recover allowance is removed from the adopted code, so full tear-off of existing roof coverings is required for asphalt shingle re-roofs. Two exceptions added to R908.3 Roof Replacement (RBC303.4.72): complete/separate roofing systems such as standing-seam metal that transmit roof loads directly to the structure without relying on the existing roof for support do not require removal of existing coverings; and metal panel, metal shingle, or concrete/clay tile coverings may be installed over existing wood shake roofs per Section 908.4.
Deck & sheathing requirements
"Asphalt shingles shall be fastened to solidly sheathed decks" (IRC Section R905.2.1 / IBC Section 1507.2.1). Per PPRBD's official interpretation, "solidly sheathed" is defined as a maximum joint width not to exceed 1/4 inch (0.25 inch) between wood structural panels -- since the code text itself does not set a maximum joint width, PPRBD adopted the 1/4" cap to account for shrinkage and construction tolerances. Interpretation effective 12/16/2011, updated 5/31/2023 for the 2023 PPRBC and 4/12/2024.
Sales & use tax
7.63% combined (state 2.9% + El Paso County 1.23% + town 3.5%); Monument is excluded from the 1% Pikes Peak RTA district that applies elsewhere in El Paso County. Home-rule, self-collected. The town's construction-materials use tax is 2%, paid as a deposit at building/right-of-way permit issuance (on 100% of declared material cost, or a 50%-of-valuation estimate), and reconciled against actual costs afterward.

The Town of Monument adopts the Pikes Peak Regional Building Code and relies on the Pikes Peak Regional Building Department for building permits and inspections. The town itself requires every business operating in town, including contractors and subcontractors, to obtain a Town of Monument business license before a permit application can be submitted.

Working an insurance claim in Monument, CO? Everything on this page — drip edge, ice & water shield, inspections, Class 4 rules — formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF) — one page, free.

Buy this jurisdiction's pack — $12 Delivered by email within minutes.

Questions about the Monument, CO pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Free instant roof estimate — Monument, CO

Ballpark your replacement in 20 seconds. No phone call required to see the number.

Roofing questions — Monument, CO

Do you need a permit to replace a roof in Monument, CO?

Required. "It is violation of Code for any person to contract or perform reroofs (for repairs more than 100 square feet) without a license unless you own the residential property AND it is your primary residence. Any repair or replacement work done over 100 sq. ft requires a permit whether a licensed contractor or homeowner is performing the work." (2023 PPRBC Section 105.2.1, Item 14)

Is ice & water shield required in Monument, CO?

Required — PPRBD reroof guidelines: "Elevations of the property is listed on the permit receipt. Properties that are above 7,000 ft. elevation require an ice barrier to be installed. This barrier shall consist of not fewer than two layers of underlayment cemented together, or a self-adhering, polymer-modified bitumen sheet, and shall extend from the eave's edge to a point of at least 24 inches inside the exterior wall line of the building." Confirmed by PPRBD homeowner FAQ: "If the elevation on the property is more than 7,000 feet, ice and water shield is required. If it is below 7,000 feet in elevation, it is not required." Trigger is per-property elevation (shown on the permit receipt), not a town-wide rule..

Is drip edge required?

Required.

Is a mid-roof inspection required?

Required — PPRBD reroof guidelines: "Typical asphalt roofing materials and Direct-To-Deck metal shingles on residential homes do not require a mid-roof inspection." Tile roofs DO require one: PPRBD homeowner FAQ states "A tile roof requires a mid-roof inspection as well as a final inspection," and the guidelines describe a dedicated "roof dry-in inspection... (Tile Roof) (BTR)" performed after underlayment/battens/ flashing are in place and before tile is stocked or installed. So: not required for standard asphalt or direct-to-deck metal reroofs; required for tile roofs only..

Do roofing contractors need a license or registration in Monument, CO?

Required. All businesses operating within the Town of Monument, including contractors, subcontractors, and out-of-town contractors, are required to first obtain a business license through the Town Clerk before a permit application can be submitted..

What building code does Monument, CO use?

The Town of Monument adopts the Pikes Peak Regional Building Code (International Codes with regional amendments administered by the Pikes Peak Regional Building Department).