Permitting Authorities / City of Greenville - Building Department (Imperial Municipal Services)
Do you need a permit to replace a roof in Greenville, MI?
Adopted code
City of Greenville - Building Department (Imperial Municipal Services)
No, Greenville, MI does not require a permit for like-for-like roof replacement (City of Greenville - Building Department (Imperial Municipal Services)). In Greenville the permit line for a reroof is whether the boards underneath the roofing are structurally changed. IMS says "You do not need a building permit for re-roofs or re-siding; HOWEVER, you will need a permit if you intend to make structural changes to the boards underneath the siding or roofing." That no-permit line is the department's stated practice: no enacted text names roof work either way, state law requires a permit before construction of a building or structure and relieves "ordinary repairs" without defining them, and this record does not decide whether the line is the department's reading of that relief. Where a permit is needed, the City of Greenville Building Permit Application is submitted through IMS, 263 Northland Drive, Rockford, MI 49341, 616-863-9294, with the city's zoning approval first; its fee schedule starts at $75.00 for a project valued from $1.00 up to $3,500, additional inspections are charged at $50.00, and checks are payable to IMS. The application says "Work started without permit may be subject to double permit fees" and "Inspections are done on Tuesdays and Thursdays." The Building Department page says plumbing, mechanical and electrical permits come from the Montcalm County Building Department, 989-831-7394. Montcalm County's building department, for the units it serves, lists roof systems as permit work and prices a roof permit, and it issues only electrical, plumbing and mechanical permits inside Greenville. City Hall is at 411 S. Lafayette Street, Greenville, MI 48838, 616-754-5645.
Roof code checklist: Greenville, MI
Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.
Jurisdiction
City of Greenville, Michigan
Address
411 S. Lafayette Street, Greenville, MI 48838
Contact
- url: https://www.greenvillemi.org/government/departments/building_planning___zoning/index.php
- phone: 616-863-9294
Roofing permit required
Not required
Contractor registration required
Required
Registration details
- state_level: Michigan licenses residential maintenance and alteration contractors under the Occupational Code, and that licence "includes the following crafts and trades" among which it names roofing (MCL 339.2404(3)); "A person shall not engage in or attempt to engage in the practice of an occupation regulated under this act" without the licence (MCL 339.601(1)). MCL 339.2403 lists who may work without one, including a project whose "aggregate contract price for the labor, material, and any other items for the undertaking or project is less than $600.00". This record does not decide whether a given roofer falls inside an exemption.
- city_level: The city's building permit application asks the contractor for a builder's licence number, a federal employer ID number, a workers comp insurance carrier and a MESC employer number, each "OR REASON FOR EXEMPTION". The Building Department page and the application state no city contractor registration, licence class, bond or examination in the pages read; Chapter 8 of the Greenville Code of Ordinances (read in full) has none. This record does not decide whether a given roofer falls inside a state exemption.
Permit process note
In Greenville the permit line for a reroof is whether the boards underneath the roofing are structurally changed. IMS says "You do not need a building permit for re-roofs or re-siding; HOWEVER, you will need a permit if you intend to make structural changes to the boards underneath the siding or roofing." That no-permit line is the department's stated practice: no enacted text names roof work either way, state law requires a permit before construction of a building or structure and relieves "ordinary repairs" without defining them, and this record does not decide whether the line is the department's reading of that relief. Where a permit is needed, the City of Greenville Building Permit Application is submitted through IMS, 263 Northland Drive, Rockford, MI 49341, 616-863-9294, with the city's zoning approval first; its fee schedule starts at $75.00 for a project valued from $1.00 up to $3,500, additional inspections are charged at $50.00, and checks are payable to IMS. The application says "Work started without permit may be subject to double permit fees" and "Inspections are done on Tuesdays and Thursdays." The Building Department page says plumbing, mechanical and electrical permits come from the Montcalm County Building Department, 989-831-7394. Montcalm County's building department, for the units it serves, lists roof systems as permit work and prices a roof permit, and it issues only electrical, plumbing and mechanical permits inside Greenville. City Hall is at 411 S. Lafayette Street, Greenville, MI 48838, 616-754-5645.
Adopted code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the City of Greenville as its own building code enforcer. Section 8-81 of the city's Code of Ordinances (Ord. No. 24-12, 8-6-2024) provides that "the city hereby adopts by reference the construction code," defined as "the state construction code promulgated from time to time by the director of the department of consumer and industry services," and names no edition. The Building Department page says the department "is responsible for administering and enforcing all Building Officials and Code Association (BOCA) and city building codes" and names no BOCA edition; this directory has not read any BOCA code text, and whether that reference has any effect today is not decided here. This record states the 2015 Michigan Residential Code, which the state construction code act applies throughout the state ("This act and the code apply throughout the state," MCL 125.1508a) and which LARA says remains in effect while the Court of Claims order of July 7, 2025 stands. The city's building permit application (dated 1/18/18) says "All work shall be in conformance with the Michigan Building Code" and calls for energy calculations under "the 2015 residential energy code".
Drip edge
Required — Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). Chapter 8 of the Greenville Code of Ordinances, the city's building permit application and the Building Department page were read for a local rule and state nothing further on drip edge. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
About drip edge
Ice & water shield
Required — Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). Chapter 8 of the Greenville Code of Ordinances, the city's building permit application and the Building Department page were read for a local rule and state nothing further on ice barrier. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
About ice & water barrier
Impact-resistant roofing
Not required — No impact-resistance requirement under state law. The 2015 Michigan Residential Code was searched in full and has no hail or impact rating rule for roof coverings: the words hail, impact and UL 2218 do not appear in it, and none of them appears in the roof assemblies chapter of the base 2015 International Residential Code either. Michigan applies one code statewide ("This act and the code apply throughout the state."), and the act gives the power to amend it to the state director, who adopts the model codes "with amendments, additions, or deletions as the director determines appropriate." Chapter 8 of the Greenville Code of Ordinances, the city's building permit application and the Building Department page were read for a local rule and state nothing further on impact resistance. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
Repair permit threshold
Imperial Municipal Services (IMS), the office the City of Greenville names for its building permits and inspections, answers in its FAQ, read October 11, 2026: "Do I need a building permit for a re-roof or exterior re-siding?" "You do not need a building permit for re-roofs or re-siding; HOWEVER, you will need a permit if you intend to make structural changes to the boards underneath the siding or roofing." The city's enacted text names no roof work either way: Section 8-81 of its Code of Ordinances (Ord. No. 24-12, 8-6-2024) adopts the state construction code by reference and makes the city the enforcing agency, Chapter 8 (read in full) amends no permit section or relief, and the city's building permit application and fee schedule list no roofing permit or fee. State law requires a building permit before construction of a building or structure, defines construction to include repair, and also says "A building permit is not required for ordinary repairs of a building or structure" (MCL 125.1510) without defining ordinary repairs or capping them by size or cost; Michigan's list of work exempt from permit (Section R105.2 of the residential code, as Michigan amends it) names no roof work. The no-permit line is the department's stated practice, and this record does not decide whether it is the department's reading of that relief. The city's application warns "Work started without permit may be subject to double permit fees." To learn whether your job is a structural change to the boards underneath, call IMS at 616-863-9294 before starting.
Roof layer limit / recover
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." Locally, the city's own building ordinance, Chapter 8 of the Greenville Code of Ordinances (Buildings and Building Regulations, Secs. 8-1 through 8-83), was read in full: it adopts the International Property Maintenance Code, 2024 edition, regulates demolition, private swimming pools and dangerous buildings, and adopts the state construction code by reference; it has no reroofing provision and amends nothing in Section R908. The Building Department page and the building permit application state no layer rule. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
Deck & sheathing requirements
State law, from the base code. Michigan makes no amendment to the roof sheathing section of the 2015 International Residential Code, Section R803, which does not appear in the Michigan rule set, so it applies as published. Lumber roof sheathing follows Table R803.1: over rafters or beams 24 inches apart it must be at least 5/8 inch net thick. Wood structural panels must be identified "for grade, bond classification and performance category by a grade mark or certificate of inspection issued by an approved agency," and their spans may not exceed "the values set forth in Table R503.2.1.1(1), or APA E30." For a shingle roof the base code adds that "Asphalt shingles shall be fastened to solidly sheathed decks" (R905.2.1), and on any reroof "The structural roof components shall be capable of supporting the roof covering system" (R908.2). Chapter 8 of the Greenville Code of Ordinances, the city's building permit application and the Building Department page were read for a local rule and state nothing further on roof sheathing. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
Sales & use tax
6%, statewide, with no local add-on. This is state law: the General Sales Tax Act sets the tax "equal to 6% of the gross proceeds of the business," the Use Tax Act sets "a total combined rate equal to 6%," and the Michigan Department of Treasury says "Michigan does not allow city or local units to impose sales tax." On a roofing job the roofer is the taxpayer on materials, because the Use Tax Act counts as a consumer "A person acquiring tangible personal property if engaged in the business of constructing, altering, repairing, or improving the real estate of others." Nothing in Chapter 8 of the Greenville Code of Ordinances or on the Building Department page changes this.
Local roofing hub
More roof permit pages in Michigan
Related guides
The City of Greenville is its own building code enforcing agency under Section 8-81 of its Code of Ordinances, and its Building Department page says "All building applications, fees and inspections are handled by Imperial Municipal Services" (IMS), whose office is at 263 Northland Drive in Rockford; City Hall is at 411 S. Lafayette Street. IMS issues only building permits for the city, and electrical, mechanical and plumbing permits come from Montcalm County. Michigan's single state construction code applies, and for houses that is the 2015 Michigan Residential Code.
Working an insurance claim in Greenville, MI? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).
Code items like drip edge and ice & water shield are what adjusters ask you to document.
Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.
Questions about the Greenville, MI pack?
Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.
Roofing questions: Greenville, MI
Do you need a permit to replace a roof in Greenville, MI?
No, Greenville, MI does not require a permit to replace a roof. Imperial Municipal Services (IMS), the office the City of Greenville names for its building permits and inspections, answers in its FAQ, read October 11, 2026: "Do I need a building permit for a re-roof or exterior re-siding?" "You do not need a building permit for re-roofs or re-siding; HOWEVER, you will need a permit if you intend to make structural changes to the boards underneath the siding or roofing." The city's enacted text names no roof work either way: Section 8-81 of its Code of Ordinances (Ord. No. 24-12, 8-6-2024) adopts the state construction code by reference and makes the city the enforcing agency, Chapter 8 (read in full) amends no permit section or relief, and the city's building permit application and fee schedule list no roofing permit or fee. State law requires a building permit before construction of a building or structure, defines construction to include repair, and also says "A building permit is not required for ordinary repairs of a building or structure" (MCL 125.1510) without defining ordinary repairs or capping them by size or cost; Michigan's list of work exempt from permit (Section R105.2 of the residential code, as Michigan amends it) names no roof work. The no-permit line is the department's stated practice, and this record does not decide whether it is the department's reading of that relief. The city's application warns "Work started without permit may be subject to double permit fees." To learn whether your job is a structural change to the boards underneath, call IMS at 616-863-9294 before starting.
Is ice & water shield required in Greenville, MI?
Yes. Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). Chapter 8 of the Greenville Code of Ordinances, the city's building permit application and the Building Department page were read for a local rule and state nothing further on ice barrier. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
Is drip edge required in Greenville, MI?
Yes. Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). Chapter 8 of the Greenville Code of Ordinances, the city's building permit application and the Building Department page were read for a local rule and state nothing further on drip edge. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
Can you roof over an existing roof in Greenville, MI?
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." Locally, the city's own building ordinance, Chapter 8 of the Greenville Code of Ordinances (Buildings and Building Regulations, Secs. 8-1 through 8-83), was read in full: it adopts the International Property Maintenance Code, 2024 edition, regulates demolition, private swimming pools and dangerous buildings, and adopts the state construction code by reference; it has no reroofing provision and amends nothing in Section R908. The Building Department page and the building permit application state no layer rule. The City of Greenville's Building Department page refers to "Building Officials and Code Association (BOCA)" codes without an edition; this field states the 2015 Michigan Residential Code, which the state act applies throughout the state, and the BOCA reference was not read (see adopted_code).
Do roofing contractors need a license or registration in Greenville, MI?
Yes.
What building code does Greenville, MI use?
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the City of Greenville as its own building code enforcer. Section 8-81 of the city's Code of Ordinances (Ord. No. 24-12, 8-6-2024) provides that "the city hereby adopts by reference the construction code," defined as "the state construction code promulgated from time to time by the director of the department of consumer and industry services," and names no edition. The Building Department page says the department "is responsible for administering and enforcing all Building Officials and Code Association (BOCA) and city building codes" and names no BOCA edition; this directory has not read any BOCA code text, and whether that reference has any effect today is not decided here. This record states the 2015 Michigan Residential Code, which the state construction code act applies throughout the state ("This act and the code apply throughout the state," MCL 125.1508a) and which LARA says remains in effect while the Court of Claims order of July 7, 2025 stands. The city's building permit application (dated 1/18/18) says "All work shall be in conformance with the Michigan Building Code" and calls for energy calculations under "the 2015 residential energy code".