Permitting Authorities / Colorado / Town of Berthoud - Planning and Building Department

Do you need a permit to replace a roof in Berthoud, CO?

Adopted code

Town of Berthoud - Planning and Building Department

Yes, a permit is required to replace a roof in Berthoud, CO, issued by Town of Berthoud - Planning and Building Department. A permit is required for roof replacement; repair or replacement of less than one square of shingles does not require a permit. All commercial work requires a licensed contractor.

Roof code checklist: Berthoud, CO

ItemAnswerCode citeSourceVerified
Permit to replace a roofYesberthoud.org2026-10-06
Repair permit thresholdPublishedberthoud.org2026-10-06
Layer limit / roof-overPublishedR908.3.1.1berthoud.org2026-10-06
Deck & sheathingPublishedberthoud.org2026-10-06
Drip edgeYesberthoud.org2026-10-06
Ice & water shieldYesR905.1.2berthoud.org2026-10-06
Mid-roof inspectionYesberthoud.org2026-10-06
Impact-resistant (Class 4) roofingYesberthoud.org2026-10-06
Wind design criteriaPublishedberthoud.org2026-10-06
Adopted codePublishedberthoud.org2026-10-06
Contractor license / registrationYesberthoud.org2026-10-06
Sales & use taxPublishedtax.colorado.gov2026-07-18

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
Town of Berthoud, Colorado
Jurisdiction type
city
Address
Berthoud, CO
Contact
  • url: https://www.berthoud.org/169/Building-Department
  • phone: 970-532-2643
Permit portal
Roofing permit required
Required
Contractor registration required
Required
Registration details
  • license: Contractors performing roofing work must be licensed with the Town of Berthoud under a G14 or G15 designation or provide a state license equivalent, and must carry a 100,000 dollar combined single limit liability insurance certificate submitted at application.
Permit process note
A permit is required for roof replacement; repair or replacement of less than one square of shingles does not require a permit. All commercial work requires a licensed contractor.
Adopted code
The Town of Berthoud has adopted the 2024 International Building Code and International Residential Code, the 2024 International Energy Conservation Code, and the 2023 National Electrical Code.
Drip edge
Ice & water shield
Required — "Ice Barrier IS REQUIRED per section R905.1.2" — the Design Criteria table in the same document also lists "Ice Barrier Underlayment Required: Yes." About ice & water barrier
Mid-roof inspection
Required — Trigger is tile and commercial only, not standard asphalt-shingle re-roofs: "A mid-roof inspection is required for commercial flat roof assemblies and for roof tile" / "Mid-Roof Inspection required for Tile Roof Assemblies."
Impact-resistant roofing
Required — "*Impact Resistance Asphalt Shingles required per R905.2.4 (Amended): Asphalt shingles shall be Class 4 impact resistant, tested in accordance with UL2218, and installed in accordance with the manufacturer's installation instructions."
Repair permit threshold
The Town states the exemption as an area test measured in squares, not as a dollar value and not as a percentage of roof area. Its Roofing Regulations handout, published under the Town Planning and Building Department letterhead, reads: "***Repair or replacement of less than 1 square of shingles does not require a permit." Anything at or above one square of shingles is permit work, and the same handout requires the building permit to be posted on the house before work starts. The handout states no separate threshold for repairs to any other roof covering, and no dollar-value threshold appears in it.
Wind design criteria
Table R301.2(1) as printed in the Town's Roofing Regulations lists Wind Design Speed "115-140" (mph) with "Special Wind Region" and Topographic Effects "Yes" in the same cell grouping (the source table does not separate speed from the special-wind-region flag into distinct columns; quoted as printed -- treat the range as the document's own formatting, not a transcription error). Same document: "IBC Section 1609.3 (Basic Design Wind Speed) is amended to read as follows[:] The basic design wind speed, V, in mph, for the determination of site wind loads shall comply with the Colorado Front Range Gust Map - ASCE 7-10 Compatible, published by the Structural Engineers Association of Colorado (dated November 18, 2013) or the Larimer County Basic Design Wind Speed Map." The document's separate Fasteners clause is recorded under the fastening requirements.
Roof layer limit / recover
Per the Town's 2026 Roofing Regulations: "Roof recover not allowed where the existing roof has two or more applications of any type of roof covering. (R908.3.1.1)" Tear-off clause: "All roofing material shall be removed prior to new application (except one (1) layer of asphalt shingles is allowed to have an additional layer of asphalt shingles applied)" -- i.e., a maximum of two total layers (one existing plus one new) before full tear-off is required.
Deck & sheathing requirements
Per the Town's 2026 Roofing Regulations: "Plank deck underlayment is allowed if spacing does not exceed 3/8". Replace damaged or questionable roof sheathing." Underlayment layer count also varies by slope: minimum 1-layer for 4:12 and greater slopes, 2-layer for 2:12 to 4:12, modified bitumen required below 2:12.
Fastening requirements
The Town's 2026 Roofing Regulations Fasteners clause specifies "ASTM F 1667 to meet 140 Ultimate Wind Exposure C". No fastener count is stated, so the IRC R905.2.6 floor of four per strip shingle applies, with the shingle manufacturer's installation instructions governing above it. About roofing nails
Sales & use tax
Combined rate varies by county: ~8.95% in the Larimer County portion (state 2.9% + Larimer Co 1.05% + Berthoud Fire Protection District 1% + town 4%) vs ~7.90% in the Weld County portion (no county sales tax). State-collected; DOR lists a 4% use tax applying to motor vehicles and building materials.

The building permit authority for the Town of Berthoud, spanning Larimer and Weld counties. Requires a permit for roofing over one square, requires a licensed contractor for the work, and has adopted the 2024 I-Codes.

Hail reports near Berthoud, CO

Reports, last 24 months
16
Largest, last 24 months
2.75 in Jun 17, 2025
Most recent
Jul 2, 2026 1.25 in
Reports, last 5 years
31
5 most recent reports, last 5 years
DateHail sizeDistance
Jul 2, 20261.25 in5 mi NE
Jul 2, 20261.00 in7 mi NE
Jun 24, 20261.75 in6 mi W
Jun 24, 20261.75 in6 mi W
Jun 24, 20261.50 in7 mi WNW

Source: NOAA Storm Prediction Center severe weather database and daily storm reports (reports since the start of the current year are preliminary), within 10 miles of Berthoud, CO (Census point). Data through Oct 7, 2026, not updated since. A report is an observation, not a damage record.

Working an insurance claim in Berthoud, CO? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like drip edge and ice & water shield are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Berthoud, CO pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Free instant roof estimate — Berthoud, CO

Ballpark your replacement in 20 seconds. No phone call required to see the number.

Roofing questions: Berthoud, CO

Do you need a permit to replace a roof in Berthoud, CO?

Yes, a permit is required to replace a roof in Berthoud, CO. The Town states the exemption as an area test measured in squares, not as a dollar value and not as a percentage of roof area. Its Roofing Regulations handout, published under the Town Planning and Building Department letterhead, reads: "***Repair or replacement of less than 1 square of shingles does not require a permit." Anything at or above one square of shingles is permit work, and the same handout requires the building permit to be posted on the house before work starts. The handout states no separate threshold for repairs to any other roof covering, and no dollar-value threshold appears in it.

Is ice & water shield required in Berthoud, CO?

Yes. "Ice Barrier IS REQUIRED per section R905.1.2" — the Design Criteria table in the same document also lists "Ice Barrier Underlayment Required: Yes."

Is drip edge required in Berthoud, CO?

Yes.

Can you roof over an existing roof in Berthoud, CO?

Per the Town's 2026 Roofing Regulations: "Roof recover not allowed where the existing roof has two or more applications of any type of roof covering. (R908.3.1.1)" Tear-off clause: "All roofing material shall be removed prior to new application (except one (1) layer of asphalt shingles is allowed to have an additional layer of asphalt shingles applied)" -- i.e., a maximum of two total layers (one existing plus one new) before full tear-off is required.

Do roofing contractors need a license or registration in Berthoud, CO?

Yes. Contractors performing roofing work must be licensed with the Town of Berthoud under a G14 or G15 designation or provide a state license equivalent, and must carry a 100,000 dollar combined single limit liability insurance certificate submitted at application.

What building code does Berthoud, CO use?

The Town of Berthoud has adopted the 2024 International Building Code and International Residential Code, the 2024 International Energy Conservation Code, and the 2023 National Electrical Code.