Roofing in Holland, Michigan

Yes, a permit is required to replace a roof in Holland, MI, issued by City of Holland - Community & Neighborhood Services. In the City of Holland a reroof is permit work: the Community & Neighborhood Services page lists "Re-roof: New and replacement" under the work that requires a permit, and the department's "Do I Need a Permit?" brochure lists the same item. The department has its own "Building Application for Roofing and Siding Only", which asks for the construction value, whether the work is a "Second layer" or "Tear off", the roof pitch and covering, and the contractor's state license number, and carries the state ice barrier requirement: "Ice & water shield must extend from the eaves edge to a point at least 24 inches inside the exterior wall." The application is returned by email or dropped off at City Hall, and the form says permits can be applied for online through BS&A "excluding applications that require plan review". The form also says the permit will "become null and void if the work is not started within 180 days" or if work is suspended or abandoned for 180 days. Fees are set by value: "$0 to $1,000 = $70", increasing "by $7 for each additional $1,000 up to $50,000" under the department's fee schedule effective January 1, 2026. To schedule an inspection, call 616-355-1330; the department says "No work shall be concealed until it has been inspected." Contractors new to the city fill out a Contractor Registration Form. The office is on the third floor of City Hall, 270 S River Avenue, Holland, MI 49423. This hub aggregates roofing permit and contractor-registration requirements for Holland, Michigan, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Holland

Roofing permit and contractor-licensing rules in Holland are set locally by City of Holland - Community & Neighborhood Services. Michigan licenses residential roofers at the state level — the Occupational Code’s residential maintenance and alteration contractor licence names roofing among its trades, with exemptions that include a job whose whole contract price is under $600 — and some cities add a local contractor registration on top, while the Michigan Residential Code applies throughout the state, so a city, village, township or county enforces the state code rather than writing its own roofing rules — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." The State of Michigan's Statewide Jurisdiction List names the City of Holland as its own building code enforcer. Section 6-1 of the Holland Code of Ordinances designates the Department of Community and Neighborhood Services as the enforcing agency and provides that "Appendix G of the Michigan Building Code shall be enforced by the enforcing agency", which names no edition and no residential code. The department's State Construction Codes page, read October 10, 2026, lists "2015 Michigan Residential Code (Effective February 2016)".
Registration details
  • state_level: Michigan licenses residential maintenance and alteration contractors under the Occupational Code, and that licence "includes the following crafts and trades" among which it names roofing (MCL 339.2404(3)); "A person shall not engage in or attempt to engage in the practice of an occupation regulated under this act" without the licence (MCL 339.601(1)). MCL 339.2403 lists who may work without one, including a project whose "aggregate contract price for the labor, material, and any other items for the undertaking or project is less than $600.00". This record does not decide whether a given roofer falls inside an exemption.
  • city_level: Section 6-3.1 of the Holland Code of Ordinances provides: "No person shall engage in the work of a residential builder or residential maintenance and alteration contractor, as defined in MCLA § 339.2401, unless such person first obtains a license to perform such work or unless the work is exempt from the licensing requirements." The department's Contractor Registration Form says it "shall be used by all contractors doing work in the City of Holland", asks for the contractor's licence type and number, federal employer ID and workers compensation carrier (or exemption), and lists a "Non-Licensed Contr." line; new contractors submit it to receive a PIN for the online account.
Permit process
In the City of Holland a reroof is permit work: the Community & Neighborhood Services page lists "Re-roof: New and replacement" under the work that requires a permit, and the department's "Do I Need a Permit?" brochure lists the same item. The department has its own "Building Application for Roofing and Siding Only", which asks for the construction value, whether the work is a "Second layer" or "Tear off", the roof pitch and covering, and the contractor's state license number, and carries the state ice barrier requirement: "Ice & water shield must extend from the eaves edge to a point at least 24 inches inside the exterior wall." The application is returned by email or dropped off at City Hall, and the form says permits can be applied for online through BS&A "excluding applications that require plan review". The form also says the permit will "become null and void if the work is not started within 180 days" or if work is suspended or abandoned for 180 days. Fees are set by value: "$0 to $1,000 = $70", increasing "by $7 for each additional $1,000 up to $50,000" under the department's fee schedule effective January 1, 2026. To schedule an inspection, call 616-355-1330; the department says "No work shall be concealed until it has been inspected." Contractors new to the city fill out a Contractor Registration Form. The office is on the third floor of City Hall, 270 S River Avenue, Holland, MI 49423.

View the full Holland permitting authority record →

Roofing suppliers in Holland

3 roofing distributor branches serving Holland are cataloged in the directory:

All roofing suppliers in Holland →

Roofing materials for Holland

Compare roofing material families — service life, weight, cost band, and durability — for a Holland reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources