Permitting Authorities / Township of Sheridan - Building and Zoning

Do you need a permit to replace a roof in Township of Sheridan, MI?

Adopted code

Township of Sheridan - Building and Zoning

Yes, a permit is required to replace a roof in Township of Sheridan, MI, issued by Township of Sheridan - Building and Zoning. In Sheridan Township a reroof is applied for with the township's Application for Building Permit, filed at the township hall at 13355 29 Mile Road, Albion, MI 49224, telephone 517-629-2604, open Monday to Thursday from 9:00 AM to 4:00 PM. The township's Building and Zoning page says its Permit Coordinator and Zoning Administrator reviews "all applications for Zoning, Building Permits, Conditional Use Permits, Appeals and Variances" and lists separate building, plumbing, mechanical and electrical inspectors. The fee schedule charges a $10.00 application fee for all permits, $65.00 per inspection and "ROOF & ICE GUARD" at $130.00, says "Construction work shall not start until the application has been approved and the necessary permit issued", and adds $100.00 if work starts before the permit. When the work is ready, the applicant calls the building inspector to set an inspection, with the address and permit number.

Roof code checklist: Township of Sheridan, MI

ItemAnswerCode citeSourceVerified
Permit to replace a roofYessheridantwp.com2026-10-15
Repair permit thresholdPublishedsheridantwp.com2026-10-15
Layer limit / roof-overPublishedR908.3.1.1codes.iccsafe.org2026-10-15
Deck & sheathingPublishedR905.2.1codes.iccsafe.org2026-10-15
Drip edgeYesR905.2.8.5codes.iccsafe.org2026-10-15
Ice & water shieldYesR905.1.2ars.apps.lara.state.mi.us2026-10-15
Mid-roof inspectionNot published
Impact-resistant (Class 4) roofingNoars.apps.lara.state.mi.us2026-10-15
Wind design criteriaNot published
Adopted codePublishedSec. 26.05ars.apps.lara.state.mi.us2026-10-15
Contractor license / registrationYeslegislature.mi.gov2026-10-15
Sales & use taxPublishedlegislature.mi.gov2026-10-15

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
Township of Sheridan, Calhoun County, Michigan
Jurisdiction type
city
Address
13355 29 Mile Road, Albion, MI 49224
Contact
  • url: https://www.sheridantwp.com/building-zoning
  • phone: 517-629-2604
Permit portal
Roofing permit required
Required
Contractor registration required
Required
Permit process note
In Sheridan Township a reroof is applied for with the township's Application for Building Permit, filed at the township hall at 13355 29 Mile Road, Albion, MI 49224, telephone 517-629-2604, open Monday to Thursday from 9:00 AM to 4:00 PM. The township's Building and Zoning page says its Permit Coordinator and Zoning Administrator reviews "all applications for Zoning, Building Permits, Conditional Use Permits, Appeals and Variances" and lists separate building, plumbing, mechanical and electrical inspectors. The fee schedule charges a $10.00 application fee for all permits, $65.00 per inspection and "ROOF & ICE GUARD" at $130.00, says "Construction work shall not start until the application has been approved and the necessary permit issued", and adds $100.00 if work starts before the permit. When the work is ready, the applicant calls the building inspector to set an inspection, with the address and permit number.
Adopted code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Township of Sheridan as its own building code enforcer. The township's Zoning Ordinance, as amended through August 2025, Section 26.05, says the Building Inspector is appointed "pursuant to the provisions of Act 230 of the Public Acts of 1972, as amended, named the "State Construction Code"", and the township's permit forms and fee schedules, read October 15, 2026, name no edition of any residential code.
Drip edge
Required — Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). The Building and Zoning page, the Building Permit application and fee schedules, and the Zoning Ordinance were read for a local rule and state nothing further on drip edge. About drip edge
Ice & water shield
Required — Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). The Building and Zoning page, the Building Permit application and fee schedules, and the Zoning Ordinance were read for a local rule and state nothing further on ice barrier. About ice & water barrier
Impact-resistant roofing
Not required — No impact-resistance requirement under state law. The 2015 Michigan Residential Code was searched in full and has no hail or impact rating rule for roof coverings: the words hail, impact and UL 2218 do not appear in it, and none of them appears in the roof assemblies chapter of the base 2015 International Residential Code either. Michigan applies one code statewide ("This act and the code apply throughout the state."), and the act gives the power to amend it to the state director, who adopts the model codes "with amendments, additions, or deletions as the director determines appropriate." The Building and Zoning page, the Building Permit application and fee schedules, and the Zoning Ordinance were read for a local rule and state nothing further on impact resistance.
Repair permit threshold
Sheridan Township's Building Fee Schedule (Rev1.2025) prices roof work as permit work: it lists "ROOF & ICE GUARD" at $130.00 and says "ZONING PERMIT (Required For All Building Permits, Except for Roofs)", and the township's permit fee schedule lists "New Roof" (ice guard and deck vapor barrier inspection, then final) and "Re-roof" (final inspection) as separate permit types. The township's Zoning Ordinance, Section 26.06, says "A building permit is required for and shall be obtained from the Building Inspector prior to the construction, enlargement, alteration, and conversion or moving of any building or structure or any part thereof", with exceptions for portable agricultural structures and similar items that do not name roofing. The township publishes no exemption for reroofing and no dollar threshold below which a roof job needs no permit. State law also says "A building permit is not required for ordinary repairs of a building or structure." (MCL 125.1510), without defining ordinary repairs; the township's own fee lines treat roofing as permit work.
Roof layer limit / recover
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." Locally, the township's Zoning Ordinance (as amended through August 2025), Building Permit application and Building Fee Schedule were read and state no layer rule and no reroofing provision, and amend nothing in Section R908. The township's Ordinances page was not reachable in the saved pages, so no building ordinance list was read and the layer limit is left unclassified here.
Deck & sheathing requirements
State law, from the base code. Michigan makes no amendment to the roof sheathing section of the 2015 International Residential Code, Section R803, which does not appear in the Michigan rule set, so it applies as published. Lumber roof sheathing follows Table R803.1: over rafters or beams 24 inches apart it must be at least 5/8 inch net thick. Wood structural panels must be identified "for grade, bond classification and performance category by a grade mark or certificate of inspection issued by an approved agency," and their spans may not exceed "the values set forth in Table R503.2.1.1(1), or APA E30." For a shingle roof the base code adds that "Asphalt shingles shall be fastened to solidly sheathed decks" (R905.2.1), and on any reroof "The structural roof components shall be capable of supporting the roof covering system" (R908.2). The Building and Zoning page, the Building Permit application and fee schedules, and the Zoning Ordinance were read for a local rule and state nothing further on roof sheathing.
Sales & use tax
6%, statewide, with no local add-on. This is state law: the General Sales Tax Act sets the tax "equal to 6% of the gross proceeds of the business," the Use Tax Act sets "a total combined rate equal to 6%," and the Michigan Department of Treasury says "Michigan does not allow city or local units to impose sales tax." On a roofing job the roofer is the taxpayer on materials, because the Use Tax Act counts as a consumer "A person acquiring tangible personal property if engaged in the business of constructing, altering, repairing, or improving the real estate of others." Nothing on the Sheridan Township Building and Zoning page and fee schedules changes this.

Sheridan Township in Calhoun County issues its own building permits through a permit coordinator and zoning administrator and a township building inspector, publishes a Building Permit application and fee schedule that prices roof work, and keeps its hall at 13355 29 Mile Road in Albion. LARA's Statewide Jurisdiction List names the Township of Sheridan as its own building code enforcer. Michigan applies one residential code statewide, and for houses that is the 2015 Michigan Residential Code.

Working an insurance claim in Township of Sheridan, MI? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like drip edge and ice & water shield are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Township of Sheridan, MI pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Roofing questions: Township of Sheridan, MI

Do you need a permit to replace a roof in Township of Sheridan, MI?

Yes, a permit is required to replace a roof in Township of Sheridan, MI. Sheridan Township's Building Fee Schedule (Rev1.2025) prices roof work as permit work: it lists "ROOF & ICE GUARD" at $130.00 and says "ZONING PERMIT (Required For All Building Permits, Except for Roofs)", and the township's permit fee schedule lists "New Roof" (ice guard and deck vapor barrier inspection, then final) and "Re-roof" (final inspection) as separate permit types. The township's Zoning Ordinance, Section 26.06, says "A building permit is required for and shall be obtained from the Building Inspector prior to the construction, enlargement, alteration, and conversion or moving of any building or structure or any part thereof", with exceptions for portable agricultural structures and similar items that do not name roofing. The township publishes no exemption for reroofing and no dollar threshold below which a roof job needs no permit. State law also says "A building permit is not required for ordinary repairs of a building or structure." (MCL 125.1510), without defining ordinary repairs; the township's own fee lines treat roofing as permit work.

Is ice & water shield required in Township of Sheridan, MI?

Yes. Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). The Building and Zoning page, the Building Permit application and fee schedules, and the Zoning Ordinance were read for a local rule and state nothing further on ice barrier.

Is drip edge required in Township of Sheridan, MI?

Yes. Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). The Building and Zoning page, the Building Permit application and fee schedules, and the Zoning Ordinance were read for a local rule and state nothing further on drip edge.

Can you roof over an existing roof in Township of Sheridan, MI?

Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." Locally, the township's Zoning Ordinance (as amended through August 2025), Building Permit application and Building Fee Schedule were read and state no layer rule and no reroofing provision, and amend nothing in Section R908. The township's Ordinances page was not reachable in the saved pages, so no building ordinance list was read and the layer limit is left unclassified here.

Do roofing contractors need a license or registration in Township of Sheridan, MI?

Yes.

What building code does Township of Sheridan, MI use?

2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Township of Sheridan as its own building code enforcer. The township's Zoning Ordinance, as amended through August 2025, Section 26.05, says the Building Inspector is appointed "pursuant to the provisions of Act 230 of the Public Acts of 1972, as amended, named the "State Construction Code"", and the township's permit forms and fee schedules, read October 15, 2026, name no edition of any residential code.