Permitting Authorities / Texas / City of Poteet - City Hall Building Permits

Do you need a permit to replace a roof in Poteet, TX?

Adopted code

City of Poteet - City Hall Building Permits

Yes, a permit is required to replace a roof in Poteet, TX, issued by City of Poteet - City Hall Building Permits. Poteet Ordinance No. 07032018-02 (July 2018) lists "Permits are required for the following:" and includes "Roofing: replacing shingles (except patching); Installing shingles over existing shingles; changing the slope of the roof; removing and replacing roof decking; changing the roof material.".

Roof code checklist: Poteet, TX

ItemAnswerCode citeSourceVerified
Permit to replace a roofYespoteettx.org2026-10-29
Repair permit thresholdNot published
Layer limit / roof-overPublishedR908.3.1.1poteettx.org2026-10-29
Deck & sheathingNot published
Drip edgeYesR905.2.8.5poteettx.org2026-10-29
Ice & water shieldNot published
Mid-roof inspectionNot published
Impact-resistant (Class 4) roofingNopoteettx.org2026-10-29
Wind design criteriaNot published
Adopted codePublishedpoteettx.org2026-10-29
Contractor license / registrationNot published
Sales & use taxPublishedcomptroller.texas.gov2026-10-17

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
City of Poteet, Texas
Jurisdiction type
city
Address
491 Avenue H, Poteet, TX 78065
Contact
  • url: https://poteettx.org/2164/Obtain-a-Permit
  • phone: 830-742-3574
Roofing permit required
Required
Permit process note
Poteet Ordinance No. 07032018-02 (July 2018) lists "Permits are required for the following:" and includes "Roofing: replacing shingles (except patching); Installing shingles over existing shingles; changing the slope of the roof; removing and replacing roof decking; changing the roof material."
Adopted code
Poteet Ordinance No. 07032018-02 (July 2018) adopts the International Building Code, the International Residential Code and related International Codes, "2015 editions," and its International Residential Code section adopts "such International Residential Code, 2015 edition, published by the International Code Council." Its adopting clause also reads "or the appropriate subsequent editions"; the ordinance does not name a later edition.
Drip edge
Required — Drip edge is required at eaves and rake edges of shingle roofs (IRC R905.2.8.5). The City adopted the 2015 International Residential Code, "or the appropriate subsequent editions," by Ordinance No. 07032018-02 (July 2018); that instrument, read in full, does not amend R905.2.8.5, so the code's drip-edge requirement stands as enacted local law. About drip edge
Impact-resistant roofing
Not required — Poteet Ordinance No. 07032018-02 (July 2018), read in full, contains no UL 2218, Class 4 or impact-resistance provision for roofing.
Roof layer limit / recover
Poteet adopted the 2015 International Residential Code, or later editions, by Ordinance No. 07032018-02 (July 2018). The ordinance, read in full, does not amend the reroofing section, so the adopted IRC's own rule applies: a roof recover is barred "Where the existing roof has two or more applications of any type of roof covering." (R908.3.1.1 in the 2015 edition; later editions through 2024 keep the same condition). One existing layer may be recovered; a second forces tear-off.
Sales & use tax
8.25% combined (6.25% state + 1.5% City of Poteet + 0.5% Atascosa County), per the Comptroller's local sales tax rate file. Comptroller Publication 94-116, Real Property Repair and Remodeling, states that "Labor to repair, remodel, or restore residential real property is not taxable" and that under a lump-sum contract "you pay tax on all your supplies, materials, equipment, and taxable services when you buy them. You don't charge your customer tax." On a lump-sum residential re-roof the rate therefore falls on the roofer's material purchases, not on the homeowner's contract price.

The City of Poteet takes building permit applications at City Hall for houses in Poteet, and the city's website lists 491 Avenue H as its contact address. Poteet sits in Atascosa County, and the codes the city has adopted are cited below from the city's own pages. This listing covers the office's contact details, the city's adopted codes and the items cited below; it does not cover every local permit rule in Poteet.

Working an insurance claim in Poteet, TX? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like drip edge are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Poteet, TX pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

The cheat sheet is free; the box above is optional. How we use your address: Privacy Policy.

Sources

Roofing questions: Poteet, TX

Do you need a permit to replace a roof in Poteet, TX?

Yes, a permit is required to replace a roof in Poteet, TX.

Is drip edge required in Poteet, TX?

Yes. Drip edge is required at eaves and rake edges of shingle roofs (IRC R905.2.8.5). The City adopted the 2015 International Residential Code, "or the appropriate subsequent editions," by Ordinance No. 07032018-02 (July 2018); that instrument, read in full, does not amend R905.2.8.5, so the code's drip-edge requirement stands as enacted local law.

Can you roof over an existing roof in Poteet, TX?

Poteet adopted the 2015 International Residential Code, or later editions, by Ordinance No. 07032018-02 (July 2018). The ordinance, read in full, does not amend the reroofing section, so the adopted IRC's own rule applies: a roof recover is barred "Where the existing roof has two or more applications of any type of roof covering." (R908.3.1.1 in the 2015 edition; later editions through 2024 keep the same condition). One existing layer may be recovered; a second forces tear-off.

What building code does Poteet, TX use?

Poteet Ordinance No. 07032018-02 (July 2018) adopts the International Building Code, the International Residential Code and related International Codes, "2015 editions," and its International Residential Code section adopts "such International Residential Code, 2015 edition, published by the International Code Council." Its adopting clause also reads "or the appropriate subsequent editions"; the ordinance does not name a later edition.