Permitting Authorities / Illinois / City of Peoria Building Safety Division

Do you need a permit to replace a roof in Peoria, IL?

Adopted code

City of Peoria Building Safety Division

No, Peoria, IL does not require a permit for like-for-like roof replacement (City of Peoria Building Safety Division). NO PERMIT ONLY WHILE THE WOOD ROOF SHEATHING STAYS; HISTORIC SITES NEED A SEPARATE APPROVAL. The City's permit page, read live 2026-09-24, lists "Roofing (not including replacing roof sheathing lumber)" among work that needs no permit, and "Re-roofing if it involves replacement of wood roof sheathing (plywood or boards)" among work that does; stop and call Building Safety if the deck has to be replaced once the old roof is off. On a designated landmark or in a designated local historic district, Chapter 16 of the City Code separately requires a certificate of appropriateness for alterations and exterior construction (Sec. 16-61) and lists "roof replacement based on previous commission precedent" among the certificates the director of planning and growth management may grant administratively (Sec. 16-63(a)(2)), while Sec. 16-6(a) leaves outside that chapter "the ordinary maintenance or repair of any exterior architectural feature in a historic district or on a landmark site which does not involve a change in design, material, color or the outward appearance thereof"; this record does not decide which a given reroof is, and that approval is separate from the building permit. THE CODE. Sec. 5-91(a) makes it unlawful to "construct, enlarge, alter or demolish a structure" without a permit, "except that ordinary repairs which do not involve any violation of this Code shall be exempt from this section," and the adopted 2018 residential code provides that "Application or notice to the building official is not required for ordinary repairs to structures"; neither names roof work, the no-permit line is the City's stated practice, and this record does not decide whether it is the City's reading of either clause. COST OF GUESSING WRONG. Sec. 5-97(a): "All permit fees shall be tripled when work that requires a permit is started prior to obtaining the permit." A bona fide emergency is exempt from prior permit issuance, but a permit must be obtained within two business days. Sec. 5-27(a) sets fines of not less than $100.00 for a first offense, $300.00 for a second and $500.00 for a third or subsequent offense within any two-year period, and anyone found in violation "more than three times within a two-year period" will "not be allowed to pull permits in the City of Peoria for a 12-month period." Ordinance No. 18,386 (adopted July 28, 2026) amends Sec. 5-97(b) and (d) only. WHERE. Permits are issued from the Development Center on the second floor of City Hall, 419 Fulton Street, Peoria, IL 61602, 309-494-2273. MONEY. Residential permit fees are calculated as a percentage of the applicant's stated construction cost: Sec. 5-97 sets residential jobs valued at $5,000.00 or higher at a 0.008 multiplier of the job cost. WHO MUST PULL IT. Sec. 5-91(c) puts the duty on the general contractor where one is hired, and on the owner otherwise. LICENCE CHECK. Under state law the City may not issue a roofing permit without proof of the contractor's current Illinois roofing licence, as this record's registration details field describes.

Roof code checklist: Peoria, IL

ItemAnswerCode citeSourceVerified
Permit to replace a roofNopeoriagov.org2026-09-24
Repair permit thresholdPublishedR105.2peoriagov.org2026-09-24
Layer limit / roof-overPublishedR908.3.1.1codes.iccsafe.org2026-09-19
Deck & sheathingPublishedapi.municode.com2026-09-19
Drip edgeYesapi.municode.com2026-09-19
Ice & water shieldNot published
Mid-roof inspectionNot published
Impact-resistant (Class 4) roofingNoapi.municode.com2026-09-19
Wind design criteriaNot published
Adopted codePublishedapi.municode.com2026-09-23
Contractor license / registrationYesilga.gov2026-09-19
Sales & use taxPublishedpeoriagov.org2026-09-19

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
City of Peoria, Illinois
Jurisdiction type
city
Address
419 Fulton Street, Peoria, IL 61602
Contact
  • url: https://www.peoriagov.org/172/Do-I-Need-a-Permit
  • phone: 309-494-2273
Roofing permit required
Not required
Contractor registration required
Required
Registration details
  • state_level: A STATE ROOFING CONTRACTOR LICENCE, WITH NO DOLLAR THRESHOLD, AND NO LOCAL LAYER FOUND AT PEORIA. The Illinois Roofing Industry Licensing Act, 225 ILCS 335/9(2), reads: "No work involving the construction, reconstruction, alteration, maintenance, or repair of any kind of roofing or waterproofing may be done except by a roofing contractor or a qualifying party licensed or credentialed under this Act." There is no dollar-value or property-size exemption for an ordinary residential reroof. Section 5(a-3) reaches the permit counter directly: "A municipality or a county that requires a building permit may not issue a building permit to a roofing contractor unless that contractor has provided sufficient proof of current licensure as a roofing contractor by the State." Holders of a limited roofing licence, Section 2(h), are restricted to residential properties of 8 units or less; holders of an unlimited licence may take any roofing project. Licensure requires a continuous surety bond of $10,000 for a limited licence or $25,000 for an unlimited one, liability and workers' compensation insurance, and a passed examination (Section 3(2)). The Act's exemptions (Section 11) are limited to a seller of roofing materials who does not perform the work, an owner working on the owner's own property, an employee working on an employer's own property, and greenhouses and farm buildings; none of them lets an ordinary paid residential reroofer out of the licence. This record found no Peoria ordinance adding a separate city roofing contractor registration; Chapter 18 of the City's Code of Ordinances, Licenses and Miscellaneous Business Regulations, was screened by its own table of contents and carries no roofing or construction-contractor licensing article.
Permit process note
NO PERMIT ONLY WHILE THE WOOD ROOF SHEATHING STAYS; HISTORIC SITES NEED A SEPARATE APPROVAL. The City's permit page, read live 2026-09-24, lists "Roofing (not including replacing roof sheathing lumber)" among work that needs no permit, and "Re-roofing if it involves replacement of wood roof sheathing (plywood or boards)" among work that does; stop and call Building Safety if the deck has to be replaced once the old roof is off. On a designated landmark or in a designated local historic district, Chapter 16 of the City Code separately requires a certificate of appropriateness for alterations and exterior construction (Sec. 16-61) and lists "roof replacement based on previous commission precedent" among the certificates the director of planning and growth management may grant administratively (Sec. 16-63(a)(2)), while Sec. 16-6(a) leaves outside that chapter "the ordinary maintenance or repair of any exterior architectural feature in a historic district or on a landmark site which does not involve a change in design, material, color or the outward appearance thereof"; this record does not decide which a given reroof is, and that approval is separate from the building permit. THE CODE. Sec. 5-91(a) makes it unlawful to "construct, enlarge, alter or demolish a structure" without a permit, "except that ordinary repairs which do not involve any violation of this Code shall be exempt from this section," and the adopted 2018 residential code provides that "Application or notice to the building official is not required for ordinary repairs to structures"; neither names roof work, the no-permit line is the City's stated practice, and this record does not decide whether it is the City's reading of either clause. COST OF GUESSING WRONG. Sec. 5-97(a): "All permit fees shall be tripled when work that requires a permit is started prior to obtaining the permit." A bona fide emergency is exempt from prior permit issuance, but a permit must be obtained within two business days. Sec. 5-27(a) sets fines of not less than $100.00 for a first offense, $300.00 for a second and $500.00 for a third or subsequent offense within any two-year period, and anyone found in violation "more than three times within a two-year period" will "not be allowed to pull permits in the City of Peoria for a 12-month period." Ordinance No. 18,386 (adopted July 28, 2026) amends Sec. 5-97(b) and (d) only. WHERE. Permits are issued from the Development Center on the second floor of City Hall, 419 Fulton Street, Peoria, IL 61602, 309-494-2273. MONEY. Residential permit fees are calculated as a percentage of the applicant's stated construction cost: Sec. 5-97 sets residential jobs valued at $5,000.00 or higher at a 0.008 multiplier of the job cost. WHO MUST PULL IT. Sec. 5-91(c) puts the duty on the general contractor where one is hired, and on the owner otherwise. LICENCE CHECK. Under state law the City may not issue a roofing permit without proof of the contractor's current Illinois roofing licence, as this record's registration details field describes.
Adopted code
THE CITY'S OWN ADOPTION, READ IN FULL, AND ITS AMENDMENTS DO NOT REACH ROOFING. Code of Ordinances Sec. 5-121 adopts the International Building Code, 2018 edition, by reference, and Sec. 5-123 adopts the International Residential Code for One- and Two-Family Dwellings, 2018 edition, by reference, both last amended by Ordinance No. 17833, adopted March 23, 2021. The City's own amendments to the residential code, at Sec. 5-124, were read in full: they rewrite the code's title section, add the swimming pool appendix, redirect board-of-appeals references to the City's own construction commission, set stair riser and tread dimensions, delete Sections R313.1 and R313.2 (the automatic fire sprinkler requirement), and replace the plumbing chapters with the state plumbing code. None of these touches the roof-assembly provisions of IRC Chapter 9 or the roof-covering provisions of IBC Chapter 15; the amendment ordinance never mentions a roof, a shingle, or a section number in either chapter. It does not touch the residential code's permit section, R105, either. The City also adopts the 2018 International Existing Building Code by reference (Sec. 5-130); its amendments at Sec. 5-131, read in full, retitle that code, delete its Section 103, add one definition to Section 202 and rewrite change-of-occupancy provisions in Section 1012, and touch neither its permit section nor its reroofing section. The City's own Building Safety page states that the City "has adopted the 2018 International Building, Residential, Energy Conservation, Existing Building, Mechanical, Fuel Gas, and Property Maintenance Codes, as well as the 2017 National Electrical Code," effective May 1, 2021. Illinois itself supplies no statewide residential code for an existing house, so there is no state instrument to check behind the City's own amendments. This is the City of Peoria only; Peoria County adopts and enforces its own building code for unincorporated county land, a separate authority from this record. Codified through Ordinance No. 18385, adopted July 14, 2026 (Supp. No. 119). Municode's ordinance bank lists one later ordinance, No. 18,386 (adopted July 28, 2026), which amends only the permit fee section, Sec. 5-97, and City Council agendas from July 28 through September 22, 2026 carry no other building-code item.
Drip edge
Required — REQUIRED BY THE UNAMENDED BASE 2018 IRC, WITH NO LOCAL RULE EITHER WAY. The City adopts the 2018 International Residential Code by reference (Sec. 5-123) and its own amendment ordinance (Sec. 5-124, read in full) does not touch the roof-assembly chapter, so the base 2018 IRC's drip-edge provision applies unmodified: a drip edge is required at eaves and rake edges of shingle roofs. The City's own permit guidance says nothing about drip edge either way. About drip edge
Impact-resistant roofing
Not required
Repair permit threshold
NO PERMIT FOR A REROOF THAT LEAVES THE WOOD ROOF SHEATHING IN PLACE, ON THE CITY'S OWN STATED PRACTICE; A REROOF THAT REPLACES SHEATHING NEEDS ONE. The City's Do I Need a Permit? page (undated; read live 2026-09-24) lists, under work that does not need a permit, "Roofing (not including replacing roof sheathing lumber)," and, under work that needs a permit, "Re-roofing if it involves replacement of wood roof sheathing (plywood or boards)." The page states no dollar or area test and does not say which provision it applies. On a designated landmark or in a designated local historic district a separate certificate of appropriateness may also be needed (see the process note). The enacted text: the City's own permit section, Code of Ordinances Sec. 5-91(a), makes it unlawful to "construct, enlarge, alter or demolish a structure" without first applying for and obtaining a permit, "except that ordinary repairs which do not involve any violation of this Code shall be exempt from this section," and adds: "Building and associated permits are required for work done under housing code violation notices." The City adopts the 2018 International Residential Code by reference (Sec. 5-123), and its amendments at Sec. 5-124 do not touch the code's permit section. Section R105.1 of that code requires any owner or owner's authorized agent who intends to "construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure" to first apply for and obtain a permit, and its list of work exempt from permit, Section R105.2, names no roof work. Section R105.2.2 provides that "Application or notice to the building official is not required for ordinary repairs to structures," and then lists work such repairs do not include; roof work is not named on either list. The City also adopts the 2018 International Existing Building Code (Sec. 5-130), whose list of work exempt from permit, Section 105.2, likewise names no roof work. No definition of "ordinary repairs" was found in the City Code's general definitions (Sec. 1-2), in its building chapter, or in the definitions chapters of the adopted residential and existing building codes. The enacted text names no roof work either way: it neither lists a reroof as permit work nor exempts one by name. The no-permit line is the City's stated practice, and this record does not decide whether it is the City's reading of either ordinary repairs clause. The City Code uses the word "reroofing" once, in its flood damage prevention chapter, whose definitions apply "when used in this chapter": there, "Development," which needs a development permit in the flood hazard area, "does not include maintenance of existing buildings and facilities, such as reroofing" (Sec. 12-2); that definition is written for the flood chapter's own permit. Separately, Chapter 16 requires a certificate of appropriateness for alterations and exterior construction on a designated landmark or in a designated local historic district (Sec. 16-61) and lists "roof replacement based on previous commission precedent" among the certificates the director of planning and growth management may grant administratively (Sec. 16-63(a)(2)); that approval is separate from the building permit. The City's fee section, Sec. 5-97, as amended by Ordinance No. 18,386 (adopted July 28, 2026, which amends only subsections (b) and (d)), prices residential permits for jobs valued at $5,000.00 or higher by construction cost and has no roofing line, and its single-family alteration permit application (Rev. 04/13/2017) offers a "Repair" category and asks for the roofing contractor's licence number, which serves the state roofing licence law, with no roofing category of its own. Guessing wrong costs money: Sec. 5-97(a) provides that "All permit fees shall be tripled when work that requires a permit is started prior to obtaining the permit," and Sec. 5-27(a) fines anyone who starts permit work without one not less than $100.00 for a first offense, not less than $300.00 for a second, and not less than $500.00 for a third or subsequent offense within any two-year period. Call Building Safety, 309-494-2273, before starting, and stop and call if the deck has to be replaced once the old roof is off.
Roof layer limit / recover
THE UNAMENDED BASE 2018 IRC BARS A THIRD LAYER. The City adopts the 2018 International Residential Code by reference (Sec. 5-123) and its own amendment ordinance (Sec. 5-124, read in full) amends nothing in the reroofing section and does not except or delete it; Illinois supplies no state amendment to the IRC to check behind it. Section R908.3.1.1, Roof recover not allowed, of the 2018 IRC as published, bars a roof recover, among other conditions, "where the existing roof has two or more applications of any type of roof covering." One existing layer may be recovered; a second existing layer requires a full tear-off first.
Deck & sheathing requirements
NO LOCAL SHEATHING RULE; THE BASE 2018 IRC GOVERNS UNMODIFIED. The City adopts the 2018 International Residential Code by reference and its own amendment ordinance (Sec. 5-124, read in full) does not touch Chapter 8's roof sheathing provisions; Illinois supplies no state amendment to check behind it, since the State has adopted no residential building code reaching an existing house. So the unamended base 2018 IRC roof sheathing requirements apply. Separately, and only for the permitting question rather than the material requirement: the City's own permit guidance treats replacement of the wood roof sheathing as the dividing line between a permit-exempt reroof and one that needs a permit, as this record's repair permit threshold field describes.
Sales & use tax
THE RATE THAT MATTERS IS WHERE THE MATERIALS ARE BOUGHT, NOT THE JOB ADDRESS. Illinois treats a roofing contractor as the end user of the materials: 86 Ill. Adm. Code 130.1940(c) states that a construction contractor "does not incur Retailers' Occupation Tax liability as to receipts from labor furnished and tangible personal property ... incorporated into a structure," and instead "incurs Use Tax on the cost price of the tangible personal property that is incorporated into real estate," with "roofing materials" named among the examples. Repair and full replacement are taxed identically: 130.1940(a)(3) defines "construct" to include "repair." In practice the supply house charges the tax at its own counter, at the combined rate where the supplier or the contractor's own place of business sits, not at the homeowner's address (86 Ill. Adm. Code 130.2075). The State's own rate is 6.25%. The City of Peoria's own published combined general merchandise rate, for a purchase made inside the city, is 9.00% (6.25% State, 1.75% City, 1.00% County), rising to 10.00% inside the City's Hospitality Improvement Zone Business Development District. The authoritative current lookup for any specific address is the Illinois Department of Revenue's MyTax Illinois Tax Rate Finder.

The building permitting authority for the City of Peoria, Illinois, working out of the Development Center on the second floor of City Hall, 419 Fulton Street. This is the City of Peoria only; Peoria County issues separately for unincorporated county land and is a different authority. The City has adopted the 2018 International Building Code and the 2018 International Residential Code by ordinance, and its own amendment ordinance, read in full, touches stairs, a board-of-appeals cross-reference, two fire-sprinkler sections and the plumbing chapter, and does not touch the roof-assembly or roof-covering chapters of either code. The City's own permit page says roofing that leaves the wood roof sheathing in place needs no permit and a reroof that replaces the sheathing does; the City Code names no roof work either way, and this record reports the City's stated test. Illinois licenses roofing contractors statewide with no dollar threshold, and a Peoria building official may not issue a permit to an unlicensed roofing contractor.

Hail reports near Peoria, IL

Reports, last 24 months
10
Largest, last 24 months
1.50 in Sep 15, 2026
Most recent
Sep 15, 2026 1.50 in
Reports, last 5 years
48
5 most recent reports, last 5 years
DateHail sizeDistance
Sep 15, 20261.50 in4 mi NW
Sep 15, 20261.50 in5 mi NW
Aug 13, 20261.00 in5 mi N
Jun 17, 20261.00 in8 mi NNW
Jun 11, 20261.00 in10 mi SSW

Source: NOAA Storm Prediction Center severe weather database and daily storm reports (reports since the start of the current year are preliminary), within 10 miles of Peoria, IL (Census point). Data through Oct 7, 2026, not updated since. A report is an observation, not a damage record.

Working an insurance claim in Peoria, IL? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like drip edge are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Peoria, IL pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

The cheat sheet is free; the box above is optional. How we use your address: Privacy Policy.

Sources

Roofing questions: Peoria, IL

Do you need a permit to replace a roof in Peoria, IL?

No, Peoria, IL does not require a permit to replace a roof. NO PERMIT FOR A REROOF THAT LEAVES THE WOOD ROOF SHEATHING IN PLACE, ON THE CITY'S OWN STATED PRACTICE; A REROOF THAT REPLACES SHEATHING NEEDS ONE. The City's Do I Need a Permit? page (undated; read live 2026-09-24) lists, under work that does not need a permit, "Roofing (not including replacing roof sheathing lumber)," and, under work that needs a permit, "Re-roofing if it involves replacement of wood roof sheathing (plywood or boards)." The page states no dollar or area test and does not say which provision it applies. On a designated landmark or in a designated local historic district a separate certificate of appropriateness may also be needed (see the process note). The enacted text: the City's own permit section, Code of Ordinances Sec. 5-91(a), makes it unlawful to "construct, enlarge, alter or demolish a structure" without first applying for and obtaining a permit, "except that ordinary repairs which do not involve any violation of this Code shall be exempt from this section," and adds: "Building and associated permits are required for work done under housing code violation notices." The City adopts the 2018 International Residential Code by reference (Sec. 5-123), and its amendments at Sec. 5-124 do not touch the code's permit section. Section R105.1 of that code requires any owner or owner's authorized agent who intends to "construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure" to first apply for and obtain a permit, and its list of work exempt from permit, Section R105.2, names no roof work. Section R105.2.2 provides that "Application or notice to the building official is not required for ordinary repairs to structures," and then lists work such repairs do not include; roof work is not named on either list. The City also adopts the 2018 International Existing Building Code (Sec. 5-130), whose list of work exempt from permit, Section 105.2, likewise names no roof work. No definition of "ordinary repairs" was found in the City Code's general definitions (Sec. 1-2), in its building chapter, or in the definitions chapters of the adopted residential and existing building codes. The enacted text names no roof work either way: it neither lists a reroof as permit work nor exempts one by name. The no-permit line is the City's stated practice, and this record does not decide whether it is the City's reading of either ordinary repairs clause. The City Code uses the word "reroofing" once, in its flood damage prevention chapter, whose definitions apply "when used in this chapter": there, "Development," which needs a development permit in the flood hazard area, "does not include maintenance of existing buildings and facilities, such as reroofing" (Sec. 12-2); that definition is written for the flood chapter's own permit. Separately, Chapter 16 requires a certificate of appropriateness for alterations and exterior construction on a designated landmark or in a designated local historic district (Sec. 16-61) and lists "roof replacement based on previous commission precedent" among the certificates the director of planning and growth management may grant administratively (Sec. 16-63(a)(2)); that approval is separate from the building permit. The City's fee section, Sec. 5-97, as amended by Ordinance No. 18,386 (adopted July 28, 2026, which amends only subsections (b) and (d)), prices residential permits for jobs valued at $5,000.00 or higher by construction cost and has no roofing line, and its single-family alteration permit application (Rev. 04/13/2017) offers a "Repair" category and asks for the roofing contractor's licence number, which serves the state roofing licence law, with no roofing category of its own. Guessing wrong costs money: Sec. 5-97(a) provides that "All permit fees shall be tripled when work that requires a permit is started prior to obtaining the permit," and Sec. 5-27(a) fines anyone who starts permit work without one not less than $100.00 for a first offense, not less than $300.00 for a second, and not less than $500.00 for a third or subsequent offense within any two-year period. Call Building Safety, 309-494-2273, before starting, and stop and call if the deck has to be replaced once the old roof is off.

Is drip edge required in Peoria, IL?

Yes. REQUIRED BY THE UNAMENDED BASE 2018 IRC, WITH NO LOCAL RULE EITHER WAY. The City adopts the 2018 International Residential Code by reference (Sec. 5-123) and its own amendment ordinance (Sec. 5-124, read in full) does not touch the roof-assembly chapter, so the base 2018 IRC's drip-edge provision applies unmodified: a drip edge is required at eaves and rake edges of shingle roofs. The City's own permit guidance says nothing about drip edge either way.

Can you roof over an existing roof in Peoria, IL?

THE UNAMENDED BASE 2018 IRC BARS A THIRD LAYER. The City adopts the 2018 International Residential Code by reference (Sec. 5-123) and its own amendment ordinance (Sec. 5-124, read in full) amends nothing in the reroofing section and does not except or delete it; Illinois supplies no state amendment to the IRC to check behind it. Section R908.3.1.1, Roof recover not allowed, of the 2018 IRC as published, bars a roof recover, among other conditions, "where the existing roof has two or more applications of any type of roof covering." One existing layer may be recovered; a second existing layer requires a full tear-off first.

Do roofing contractors need a license or registration in Peoria, IL?

Yes.

What building code does Peoria, IL use?

THE CITY'S OWN ADOPTION, READ IN FULL, AND ITS AMENDMENTS DO NOT REACH ROOFING. Code of Ordinances Sec. 5-121 adopts the International Building Code, 2018 edition, by reference, and Sec. 5-123 adopts the International Residential Code for One- and Two-Family Dwellings, 2018 edition, by reference, both last amended by Ordinance No. 17833, adopted March 23, 2021. The City's own amendments to the residential code, at Sec. 5-124, were read in full: they rewrite the code's title section, add the swimming pool appendix, redirect board-of-appeals references to the City's own construction commission, set stair riser and tread dimensions, delete Sections R313.1 and R313.2 (the automatic fire sprinkler requirement), and replace the plumbing chapters with the state plumbing code. None of these touches the roof-assembly provisions of IRC Chapter 9 or the roof-covering provisions of IBC Chapter 15; the amendment ordinance never mentions a roof, a shingle, or a section number in either chapter. It does not touch the residential code's permit section, R105, either. The City also adopts the 2018 International Existing Building Code by reference (Sec. 5-130); its amendments at Sec. 5-131, read in full, retitle that code, delete its Section 103, add one definition to Section 202 and rewrite change-of-occupancy provisions in Section 1012, and touch neither its permit section nor its reroofing section. The City's own Building Safety page states that the City "has adopted the 2018 International Building, Residential, Energy Conservation, Existing Building, Mechanical, Fuel Gas, and Property Maintenance Codes, as well as the 2017 National Electrical Code," effective May 1, 2021. Illinois itself supplies no statewide residential code for an existing house, so there is no state instrument to check behind the City's own amendments. This is the City of Peoria only; Peoria County adopts and enforces its own building code for unincorporated county land, a separate authority from this record. Codified through Ordinance No. 18385, adopted July 14, 2026 (Supp. No. 119). Municode's ordinance bank lists one later ordinance, No. 18,386 (adopted July 28, 2026), which amends only the permit fee section, Sec. 5-97, and City Council agendas from July 28 through September 22, 2026 carry no other building-code item.