Permitting Authorities / Township of Mussey - Building Department
Do you need a permit to replace a roof in Township of Mussey, MI?
Adopted code
Township of Mussey - Building Department
Yes, a permit is required to replace a roof in Township of Mussey, MI, issued by Township of Mussey - Building Department. Mussey Township has published nothing that names roof work either way: its Buildings page, building permit application, building requirements sheet and building permit fee schedule have no roofing line, and the fee schedule prices new homes and additions, pole buildings and garages, decks and porches, ponds, solar panels, commercial work, signs, moving a building and demolition but not a reroof. With the department silent on reroofs, the state's general permit rule applies: "before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit". The same section says "A building permit is not required for ordinary repairs of a building or structure," without defining ordinary repairs, and the department has published nothing applying that relief to roof work, so ask the Building Department before you start. The township's fee schedule says the "Building official/Department has discretion to lower permit fees and Inspector Bond on smaller projects" and sets a fee for "Starting without a permit" of "$100.00 to $500.00 based on size of project." The Buildings page says "If licensed contractor is doing the work, must supply a copy of their current Michigan State License." Applications are mailed to Mussey Township, P.O. Box 118, Capac, MI 48014, or faxed to 810-395-7182; the office number is 810-395-4915 and the township office is open Monday through Thursday, 9:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m. The application form and fee schedule still print the township's former address, 135 N. Main Street, and the home page says the office is now at 4331 N. Capac Road.
Roof code checklist: Township of Mussey, MI
Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.
Jurisdiction
Township of Mussey, Michigan
Address
4331 N. Capac Road, Capac, MI 48014
Contact
- url: https://www.musseytownship.org/webapp/p/206/buildings
- phone: 810-395-4915
Roofing permit required
Required
Contractor registration required
Required
Permit process note
Mussey Township has published nothing that names roof work either way: its Buildings page, building permit application, building requirements sheet and building permit fee schedule have no roofing line, and the fee schedule prices new homes and additions, pole buildings and garages, decks and porches, ponds, solar panels, commercial work, signs, moving a building and demolition but not a reroof. With the department silent on reroofs, the state's general permit rule applies: "before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit". The same section says "A building permit is not required for ordinary repairs of a building or structure," without defining ordinary repairs, and the department has published nothing applying that relief to roof work, so ask the Building Department before you start. The township's fee schedule says the "Building official/Department has discretion to lower permit fees and Inspector Bond on smaller projects" and sets a fee for "Starting without a permit" of "$100.00 to $500.00 based on size of project." The Buildings page says "If licensed contractor is doing the work, must supply a copy of their current Michigan State License." Applications are mailed to Mussey Township, P.O. Box 118, Capac, MI 48014, or faxed to 810-395-7182; the office number is 810-395-4915 and the township office is open Monday through Thursday, 9:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m. The application form and fee schedule still print the township's former address, 135 N. Main Street, and the home page says the office is now at 4331 N. Capac Road.
Adopted code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Township of Mussey as its own building code enforcer. The township's Buildings page, building permit application, building requirements sheet and fee schedule were read and name no edition of the residential code; the fee schedule says only that building plans must comply with the current Michigan building codes. The township's codified ordinances are published on American Legal Publishing, and their text was not read for this record.
Drip edge
Required — Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). The Mussey Township Buildings page, building permit application, building requirements sheet and fee schedule were read for a local rule and state nothing on drip edge.
About drip edge
Ice & water shield
Required — Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). The Mussey Township Buildings page, building permit application, building requirements sheet and fee schedule were read for a local rule and state nothing on ice barrier.
About ice & water barrier
Impact-resistant roofing
Not required — No impact-resistance requirement under state law. The 2015 Michigan Residential Code was searched in full and has no hail or impact rating rule for roof coverings: the words hail, impact and UL 2218 do not appear in it, and none of them appears in the roof assemblies chapter of the base 2015 International Residential Code either. Michigan applies one code statewide ("This act and the code apply throughout the state."), and the act gives the power to amend it to the state director, who adopts the model codes "with amendments, additions, or deletions as the director determines appropriate." The Mussey Township Buildings page, building permit application, building requirements sheet and fee schedule were read for a local rule and state nothing on impact resistance.
Repair permit threshold
Mussey Township publishes no size or dollar line below which roof work needs no permit. State law requires that "before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit" and says "A building permit is not required for ordinary repairs of a building or structure." (MCL 125.1510) without defining ordinary repairs. The township's Buildings page, its building permit application, its building requirements sheet and its building permit fee schedule (adopted July 14, 2021) were read and do not apply that relief to roof work or name roof work either way. The application's only relief concerns plans: "Plans are not required for alterations and repair work determined by the building official to be of a minor nature." It lists "Repair" and "Alteration" among its types of improvement and does not mention roofing.
Roof layer limit / recover
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." The Mussey Township Buildings page, building permit application, building requirements sheet and fee schedule state no layer rule, and the township's codified ordinances were not read for this record.
Deck & sheathing requirements
State law, from the base code. Michigan makes no amendment to the roof sheathing section of the 2015 International Residential Code, Section R803, which does not appear in the Michigan rule set, so it applies as published. Lumber roof sheathing follows Table R803.1: over rafters or beams 24 inches apart it must be at least 5/8 inch net thick. Wood structural panels must be identified "for grade, bond classification and performance category by a grade mark or certificate of inspection issued by an approved agency," and their spans may not exceed "the values set forth in Table R503.2.1.1(1), or APA E30." For a shingle roof the base code adds that "Asphalt shingles shall be fastened to solidly sheathed decks" (R905.2.1), and on any reroof "The structural roof components shall be capable of supporting the roof covering system" (R908.2). The Mussey Township Buildings page, building permit application, building requirements sheet and fee schedule were read for a local rule and state nothing on roof sheathing.
Sales & use tax
6%, statewide, with no local add-on. This is state law: the General Sales Tax Act sets the tax "equal to 6% of the gross proceeds of the business," the Use Tax Act sets "a total combined rate equal to 6%," and the Michigan Department of Treasury says "Michigan does not allow city or local units to impose sales tax." On a roofing job the roofer is the taxpayer on materials, because the Use Tax Act counts as a consumer "A person acquiring tangible personal property if engaged in the business of constructing, altering, repairing, or improving the real estate of others." Nothing on the Mussey Township Buildings page or in its building permit fee schedule changes this.
Local roofing hub
More roof permit pages in Michigan
Related guides
Mussey Township in St. Clair County runs its own Building Department out of the township office at 4331 N. Capac Road in Capac. Its Buildings page says to mail permit applications to the township's P.O. Box 118 or fax them to 810-395-7182 and to "allow 5 to 7 business days for the processing of all permits", and the State of Michigan's jurisdiction list names the Township as its own building code enforcer. Michigan's single state construction code applies, and for houses that is the 2015 Michigan Residential Code.
Working an insurance claim in Township of Mussey, MI? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).
Code items like drip edge and ice & water shield are what adjusters ask you to document.
Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.