Yes, a permit is required to replace a roof in Marion, IN, issued by City of Marion Building Department. WHERE. The Building Department is at 301 South Branson St., Marion, IN 46952, on 765-662-9931, toll free 833-662-9935, with Justin Dickerson as Building Commissioner, Spencer Petty as Permit Compliance Officer and McKenna Cardona as Administrative Assistant. The Grant County Area Plan Department is a different office; the City's application asks first whether the job is inside the city limits. ORDER OF OPERATIONS. Register as a contractor first, since the City charges $250.00 for starting any project before registration is completed, then file the Residential Building Permit Application, ticking the ROOF box and stating the approximate cost of the job. The contractor section of the application reads: "ALL CONTRACTORS ARE REQUIRED TO BE REGISTERED PRIOR TO STARTING WORK." MONEY. On the residential fee schedule, read from the rendered page, the Int./Ext. Cosmetic Remodel line, which names roof, is $60.00. The application states that fines are separate from and in addition to the normal registration and permitting fees, and that all fines or fees must be paid in full before any permit will be issued. INSPECTIONS. A roof inspection after tear-off and a final, booked with twenty-four hours' notice, with someone on site. A dumpster placed in the City right of way, alley or sidewalk needs a separate Right-of-Way permit from the Engineering Department.

Roof code checklist: Marion, IN

ItemAnswerCode citeSourceVerified
Permit to replace a roofYesPermit-Checklist.pdf2026-09-11
Repair permit thresholdPublishedPermit-Checklist.pdf2026-09-12
Layer limit / roof-overPublishedR908.3.1.1iar.iga.in.gov2026-09-23
Deck & sheathingPublishedR803.2.1iar.iga.in.gov2026-09-23
Drip edgeYesR905.2.8.5Required-Inspections-for-Permits.pdf2026-09-23
Ice & water shieldYes Written reply from the City of Marion Building Department, Sep 22, 2026Required-Inspections-for-Permits.pdf2026-09-23
Mid-roof inspectionYesRequired-Inspections-for-Permits.pdf2026-09-11
Impact-resistant (Class 4) roofingNot published
Wind design criteriaPublishedR301.2.1Ice-and-Water-Shield-Update-2020-...2026-09-23
Adopted codePublished Written reply from the City of Marion Building Department, Sep 22, 2026Sec. 150.45codelibrary.amlegal.com2026-09-23
Contractor license / registrationYescityofmarion.in.gov2026-09-11
Sales & use taxPublishedin.gov2026-09-11

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
City of Marion, Grant County, Indiana
Jurisdiction type
city
Address
301 South Branson St., Marion, IN 46952
Contact
  • url: https://cityofmarion.in.gov/government/departments/building-department
  • phone: 765-662-9931
Roofing permit required
Required
Contractor registration required
Required
Registration details
  • license: A CITY REGISTRATION WITH INSURANCE ON FILE, RENEWED EVERY YEAR. The City's Contractor Registration page opens: "All contractors doing work in the city limits must be registered to do so." The requirement is Chapter 113 of the Marion Code, from Ordinance 9-2005, which the City publishes as a 2017 printout of the chapter. Section 113.01(A) reads: "Any person, partnership or corporation that enters into any contract (verbal or written) with another person, partnership or corporation to engage in any type of construction activity, including demolition work, in or upon real estate located within the city must be registered under this chapter." Subcontractors are included, and section 113.01(E) excludes only owners and tenants: "Property owners and tenants working on their own property are excluded from registration." WHAT IT TAKES. Section 113.04 requires bodily injury, property damage and worker's compensation insurance, the liability policy in minimum amounts of "$500,000.00 for any occurrence relative to which there is an injury or death to one or more persons" and "$100,000.00 for any occurrence relative to which there is damage to property". The Building Commissioner's cover letter on the current application asks for a certificate of insurance naming the City of Marion Building Department as certificate holder, proof of worker's compensation, and, for a sole proprietor or partnership, a Worker's Compensation Clearance Certificate from the State of Indiana Worker's Compensation Board. Section 113.05(C): "The contractor registration shall be for a one year period beginning on the date of issuance." FEES. Roofing has no category of its own; the published fee schedule lists General Contractor and Non-Categorized at $200.00 unrestricted or $150.00 residential, with HVAC, electrical and plumbing at $125.00 and $100.00, and $50.00 for a sole proprietor or partnership. THE PENALTY. The permit application lists "$250.00 Contractor Registration not completed prior to starting work on any project (General or Subcontractors)", and section 113.99 provides that "whosoever violates any provision of this chapter shall be subject to a fine of not less than $100 and not more than $1,000. Each day may be considered a separate violation." Section 113.08(A) lets the Building Inspector stop work being done by an unlisted contractor.
Permit process note
WHERE. The Building Department is at 301 South Branson St., Marion, IN 46952, on 765-662-9931, toll free 833-662-9935, with Justin Dickerson as Building Commissioner, Spencer Petty as Permit Compliance Officer and McKenna Cardona as Administrative Assistant. The Grant County Area Plan Department is a different office; the City's application asks first whether the job is inside the city limits. ORDER OF OPERATIONS. Register as a contractor first, since the City charges $250.00 for starting any project before registration is completed, then file the Residential Building Permit Application, ticking the ROOF box and stating the approximate cost of the job. The contractor section of the application reads: "ALL CONTRACTORS ARE REQUIRED TO BE REGISTERED PRIOR TO STARTING WORK." MONEY. On the residential fee schedule, read from the rendered page, the Int./Ext. Cosmetic Remodel line, which names roof, is $60.00. The application states that fines are separate from and in addition to the normal registration and permitting fees, and that all fines or fees must be paid in full before any permit will be issued. INSPECTIONS. A roof inspection after tear-off and a final, booked with twenty-four hours' notice, with someone on site. A dumpster placed in the City right of way, alley or sidewalk needs a separate Right-of-Way permit from the Engineering Department.
Adopted code
THE 2020 INDIANA RESIDENTIAL CODE, ADOPTED BY REFERENCE, WITH STRICTER CITY ROOFING RULES ON TOP. The City's Code of Ordinances on codelibrary.amlegal.com, section 150.45 (Ordinance 12-2019, passed October 15, 2019), incorporates by reference the Fire Prevention and Building Safety Commission's rules in Title 675 of the Indiana Administrative Code, including "Article 14 - Indiana Residential Code", and "shall include any later amendments to those rules". The current residential rule is 675 IAC 14-4.4, the 2020 Indiana Residential Code, which adopts and amends the first printing of the 2018 International Residential Code. Written reply from the City of Marion Building Department, Sep 22, 2026: "We have adopted 2020 IRC, though we do require ice and water shield as a separate jurisdiction from the county." The Building Commissioner's notice on roofing standards, dated August 25, 2026, says the City's roofing requirements mostly "refer to the 2020 Indiana Residential Code, with some stricter guidelines for buildings within city limits", and that "the City of Marion has its own codes and standards separate to Grant County." The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry. Written reply from the City of Marion Building Department, Sep 22, 2026
Drip edge
Required — REQUIRED BY CITY RULE AND BY THE STATE CODE, WITH GUTTER APRON ADDED BY THE CITY. The City's written local rule on asphalt shingle roofing, a written notice from the Office of the Building Commissioner headed "NOTICE OF LOCALE RULE", "RE: ROOFING STANDARDS", dated August 25, 2026 and signed by Building Commissioner Justin Dickerson, applies to new construction and to new roofing on existing structures, and item 2 reads: "The application of drip edge and gutter apron is required." The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry. The state side agrees on drip edge: the Indiana State Building Commissioner's memo reproduces section R905.2.8.5 of the 2020 Indiana Residential Code, whose first sentence reads: "A drip edge shall be provided at eaves and rake edges of shingle roofs." The rest of that section sets the overlap, extension and fastening of the drip edge and the order of underlayment at eaves and rakes, and 675 IAC 14-4.4 makes no change to it. The roof is inspected after tear-off and again at final, so expect the drip edge and gutter apron to be seen. About drip edge
Ice & water shield
Required — REQUIRED ON EVERY ROOF IN THE CITY, NEW OR REROOF, AND THE CITY HAS PUT THE RULE IN WRITING. The Building Department's sheet of required inspections, printed inside its residential permit application, reads: "ROOF: AFTER TEAR OFF AND A FINAL. ICE AND WATER SHIELD IS REQUIRED AND MUST BE INSPECTED." Asked in writing whether that sheet is current, the Department said it is (Written reply from the City of Marion Building Department, Sep 22, 2026): it is "given out with all of our permit applications", "our rules on this have not changed since 2020", and that "we do require ice and water shield as a separate jurisdiction from the county." WHERE IT GOES. The reply enclosed a written notice from the Office of the Building Commissioner headed "NOTICE OF LOCALE RULE", "RE: ROOFING STANDARDS", dated August 25, 2026 and signed by Building Commissioner Justin Dickerson. Its section on asphalt shingles and ice and water shield "shall serve as notice of local rule" and applies "to both new constructions as well as the application of new roofing to existing structures." Item 1 reads: "It shall be required that ice and water shield be applied along the gutter edges of all roofs and shall extend at least eighteen (18) inches past the interior wall." The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry. THE ORDINANCE. The Department also pointed to General Ordinance No. 7-2018, Neighborhood Preservation, effective January 1, 2019, which the notice names as the City's minimum standards (Marion City Code Chapter 150). Its section 150.1.1(c) reads: "Ice and water shield flashing and all roofing material shall be sound, tight and not have defects that admit rain." That is a maintenance standard; the installation extent comes from the notice. The Chapter 150 now published on codelibrary.amlegal.com, rewritten by Ordinance 12-2019, was read on September 23, 2026 and its text does not contain that sentence. THE STATE TABLE. The Indiana Residential Code's Table R301.2(1), as amended by 675 IAC 14-4.4-5, prints No for Grant County in the ice shield column; the City's notice states that its roofing rules follow the 2020 Indiana Residential Code "with some stricter guidelines for buildings within city limits", and this is one of them. Outside the city limits Grant County's own record in this directory applies. MANUFACTURER'S INSTRUCTIONS. The notice adds that the Indiana Residential Code repeatedly requires roofing to be installed per the manufacturer's instructions, and that "These instructions supersede Indiana Residential Code's minimum standards, as well as the City of Marion's minimum standards"; so where a shingle maker calls for more membrane than 18 inches past the interior wall, follow the maker. WHAT THE DOCUMENTS DO NOT SAY. None of them states what happens at the tear-off inspection if the membrane is missing; the sheet says only that it "MUST BE INSPECTED". Budget it at the eaves on every Marion reroof. About ice & water barrier Written reply from the City of Marion Building Department, Sep 22, 2026
Mid-roof inspection
Required — YES, A TEAR-OFF INSPECTION, AND IT IS WRITTEN DOWN. The Building Department's sheet of required inspections for all residential and commercial construction lists, as item 4, "ROOF: AFTER TEAR OFF AND A FINAL. ICE AND WATER SHIELD IS REQUIRED AND MUST BE INSPECTED." So the deck is seen with the old covering off, before the new one goes on, and the job is seen again at final. HOW TO BOOK IT. Call 765-662-9931 between 8:00 A.M. and 4:00 P.M., Monday to Friday, with the permit number and the job address; "TWENTY-FOUR (24) HOUR NOTICE IS REQUIRED WHEN REQUESTING AN INSPECTION." The contractor or the owner must be on site or the inspection will not be done. The sheet warns there "MAY BE A SIXTY-DOLLAR ($60.00) FEE FOR MISSED SCHEDULED INSPECTIONS", and the permit application adds that "IF REQUIRED INSPECTIONS ARE NOT PERFORMED, A $200.00 FINE WILL BE IMPOSED". Plan the tear-off so the deck can stay open, or dried in, until the inspector has been.
Repair permit threshold
THE CITY'S TWO PERMIT DOCUMENTS DRAW THE LINE IN DIFFERENT PLACES, AND BOTH ARE REPORTED HERE RATHER THAN ONE BEING CHOSEN. The Building Department's checklist, headed "DO YOU NEED A BUILDING PERMIT?", lists as its third item "All new roofing or roof requiring repairs." with no dollar or size floor attached. A separate item on the same sheet sets a cost test for other work: "Any cosmetic remodel (drywall, flooring, siding, etc.) when the cost of the project exceeds $1,500.00." The City's Residential Permits web page puts roofing on the other side of that line: "If the cost of the job exceeds $1,500.00 for interior or exterior cosmetic remodeling (siding, paint, roof, flooring dry wall, etc.), a residential permit is required." So on the checklist every new roof and every roof repair needs a permit, while on the web page roof work under $1,500.00 appears not to. The fee schedule prices roof work under a dedicated line, "Int./Ext. Cosmetic Remodel", described as "(Siding, roof, paint, flooring, drywall, etc.)", and the permit application carries a ROOF box of its own. The City's codified permit chapter, published on codelibrary.amlegal.com, was not opened for this record, so no enacted threshold is reported. A full reroof on a house clears $1,500.00 in any case, so the two documents agree on the ordinary replacement job; they part only on small repairs. THE COST OF GUESSING WRONG. The permit application lists, as of July 1st, 2024, "$200.00 Starting work without a permit" and "$150.00 Stop Work Order issued", each separate from and in addition to the normal permit fee. For a small repair, ask the Building Department on 765-662-9931 before starting.
Wind design criteria
115 MPH, AND THE CITY WARNS THAT THREE-TAB SHINGLES ARE NOT LIKELY TO MEET IT. Table R301.2(1) of the Indiana Residential Code, as amended by 675 IAC 14-4.4-5, gives the Grant County row as wind speed 115 mph, seismic design category A, ground snow load 20 psf, frost depth 30 inches, winter design temperature 2 degrees Fahrenheit, decay slight to moderate, termite moderate to heavy, weathering severe, ice shield underlayment required No, air freezing index 1500 or less, and mean annual temperature 50.3 degrees. The Building Commissioner's notice on roofing standards, dated August 25, 2026, confirms the City's "current wind speed design criteria is 115 miles per hour" and states: "This criteria determines that 3-tab shingles, which are typically rated 60-90 mph, are not likely to meet the standard." It cites R301.2.1: roof covering must meet the required design specifications. Check the wind rating on the shingle wrapper before quoting a three-tab roof. The No in the ice shield column does not govern inside the city: the City requires ice and water shield on every roof, as this record's ice and water shield entry explains. The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry.
Roof layer limit / recover
TWO LAYERS AT MOST, AND NO OVERLAY OF A WET, WORN, OR TILE ROOF. The Building Commissioner's notice on roofing standards, dated August 25, 2026, restates section R908 of the 2020 code as part of the City's local rule for asphalt shingles, applied to new construction and to reroofs. R908.3: "A Roof replacement shall include the removal of existing layers of roof coverings down to the roof deck." R908.3.1.1: a roof recover "shall not be permitted" where the existing roof or covering is water soaked or has deteriorated to the point that it is not adequate as a base for additional roofing, where the existing covering is slate, clay, cement, or asbestos-cement tile, or "Where the existing roof has two or more applications of any type of roof covering." Read together, one existing layer in sound condition may be recovered once; anything more is a tear-off to the deck. The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry.
Deck & sheathing requirements
SOLID SHEATHING UNDER ASPHALT SHINGLES, PER THE STATE CODE AS THE CITY RESTATES IT. The Building Commissioner's notice on roofing standards, dated August 25, 2026, says Marion follows sections R803 and R905.8.1 on spaced wood sheathing and R803.2.1 on wood structural panels (DOC PS 1, DOC PS 2, CSA O437 or CSA O325, grade-marked), and lists the decking rules of section R905: asphalt shingles, mineral-surfaced roll roofing and slate on solid sheathing; clay and concrete tile on solid sheathing or spaced structural sheathing boards; metal roof shingles on a solid or closely fitted deck unless the covering is designed for spaced sheathing; wood shingles on solid or spaced sheathing, spaced boards not less than 1 inch by 4 inch nominal, spaced on centers equal to the weather exposure. The deck is seen at the tear-off inspection. The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry.
Sales & use tax
7.00% in Marion, the Indiana state sales and use tax rate. The Department of Revenue's county tax information page states: "The sales tax for the entire State of Indiana is 7%." WHO PAYS IT ON A ROOF DEPENDS ON THE CONTRACT. The Department's Sales Tax Information Bulletin #60 explains that a contractor on a time and material contract "is a retail merchant that is selling the construction material that it incorporates into real property" and collects sales tax on the material portion, while a contractor on any other type of contract, such as a lump sum, "must pay sales or use tax on their construction material" and does not collect it from the customer. Read the bulletin, or ask an accountant, before pricing a job either way.

The building permitting authority for the City of Marion, Indiana, the seat of Grant County, working out of 301 South Branson Street. This is Marion in Grant County, not Marion County, which is Indianapolis. The City's department covers property inside the city limits only; the Grant County Area Plan Department is a separate office on a separate phone line, 765-668-4765, and the City's own permit application asks first whether the job is inside the city limits and sends anything outside them to the appropriate office. Three things a roofer should know before bidding here. Every contractor must be registered with the City, with insurance on file, before starting any job. The roof gets its own inspection after tear-off, and ice and water shield is required on every roof inside the city limits, new or reroof, and is checked at that inspection; the Building Commissioner's written local rule sets it at the gutter edges, at least 18 inches past the interior wall. And the City's two permit documents draw the reroof line in different places.

Hail reports near Marion, IN

Reports, last 24 months
9
Largest, last 24 months
1.75 in Apr 14, 2026
Most recent
Aug 11, 2026 1.00 in
Reports, last 5 years
15
5 most recent reports, last 5 years
DateHail sizeDistance
Aug 11, 20261.00 in2 mi NNW
Apr 14, 20261.75 in2 mi S
Apr 14, 20261.50 in2 mi N
Apr 14, 20261.00 in2 mi WNW
Mar 26, 20261.50 in5 mi SSE

Source: NOAA Storm Prediction Center severe weather database and daily storm reports (reports since the start of the current year are preliminary), within 10 miles of Marion, IN (Census point). Data through Oct 7, 2026, not updated since. A report is an observation, not a damage record.

Working an insurance claim in Marion, IN? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

The department confirmed some of these rules in writing (marked above). Code items like these are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Marion, IN pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

The cheat sheet is free; the box above is optional. How we use your address: Privacy Policy.

Sources

Roofing questions: Marion, IN

Do you need a permit to replace a roof in Marion, IN?

Yes, a permit is required to replace a roof in Marion, IN. THE CITY'S TWO PERMIT DOCUMENTS DRAW THE LINE IN DIFFERENT PLACES, AND BOTH ARE REPORTED HERE RATHER THAN ONE BEING CHOSEN. The Building Department's checklist, headed "DO YOU NEED A BUILDING PERMIT?", lists as its third item "All new roofing or roof requiring repairs." with no dollar or size floor attached. A separate item on the same sheet sets a cost test for other work: "Any cosmetic remodel (drywall, flooring, siding, etc.) when the cost of the project exceeds $1,500.00." The City's Residential Permits web page puts roofing on the other side of that line: "If the cost of the job exceeds $1,500.00 for interior or exterior cosmetic remodeling (siding, paint, roof, flooring dry wall, etc.), a residential permit is required." So on the checklist every new roof and every roof repair needs a permit, while on the web page roof work under $1,500.00 appears not to. The fee schedule prices roof work under a dedicated line, "Int./Ext. Cosmetic Remodel", described as "(Siding, roof, paint, flooring, drywall, etc.)", and the permit application carries a ROOF box of its own. The City's codified permit chapter, published on codelibrary.amlegal.com, was not opened for this record, so no enacted threshold is reported. A full reroof on a house clears $1,500.00 in any case, so the two documents agree on the ordinary replacement job; they part only on small repairs. THE COST OF GUESSING WRONG. The permit application lists, as of July 1st, 2024, "$200.00 Starting work without a permit" and "$150.00 Stop Work Order issued", each separate from and in addition to the normal permit fee. For a small repair, ask the Building Department on 765-662-9931 before starting.

Is ice & water shield required in Marion, IN?

Yes. REQUIRED ON EVERY ROOF IN THE CITY, NEW OR REROOF, AND THE CITY HAS PUT THE RULE IN WRITING. The Building Department's sheet of required inspections, printed inside its residential permit application, reads: "ROOF: AFTER TEAR OFF AND A FINAL. ICE AND WATER SHIELD IS REQUIRED AND MUST BE INSPECTED." Asked in writing whether that sheet is current, the Department said it is (Written reply from the City of Marion Building Department, Sep 22, 2026): it is "given out with all of our permit applications", "our rules on this have not changed since 2020", and that "we do require ice and water shield as a separate jurisdiction from the county." WHERE IT GOES. The reply enclosed a written notice from the Office of the Building Commissioner headed "NOTICE OF LOCALE RULE", "RE: ROOFING STANDARDS", dated August 25, 2026 and signed by Building Commissioner Justin Dickerson. Its section on asphalt shingles and ice and water shield "shall serve as notice of local rule" and applies "to both new constructions as well as the application of new roofing to existing structures." Item 1 reads: "It shall be required that ice and water shield be applied along the gutter edges of all roofs and shall extend at least eighteen (18) inches past the interior wall." The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry. THE ORDINANCE. The Department also pointed to General Ordinance No. 7-2018, Neighborhood Preservation, effective January 1, 2019, which the notice names as the City's minimum standards (Marion City Code Chapter 150). Its section 150.1.1(c) reads: "Ice and water shield flashing and all roofing material shall be sound, tight and not have defects that admit rain." That is a maintenance standard; the installation extent comes from the notice. The Chapter 150 now published on codelibrary.amlegal.com, rewritten by Ordinance 12-2019, was read on September 23, 2026 and its text does not contain that sentence. THE STATE TABLE. The Indiana Residential Code's Table R301.2(1), as amended by 675 IAC 14-4.4-5, prints No for Grant County in the ice shield column; the City's notice states that its roofing rules follow the 2020 Indiana Residential Code "with some stricter guidelines for buildings within city limits", and this is one of them. Outside the city limits Grant County's own record in this directory applies. MANUFACTURER'S INSTRUCTIONS. The notice adds that the Indiana Residential Code repeatedly requires roofing to be installed per the manufacturer's instructions, and that "These instructions supersede Indiana Residential Code's minimum standards, as well as the City of Marion's minimum standards"; so where a shingle maker calls for more membrane than 18 inches past the interior wall, follow the maker. WHAT THE DOCUMENTS DO NOT SAY. None of them states what happens at the tear-off inspection if the membrane is missing; the sheet says only that it "MUST BE INSPECTED". Budget it at the eaves on every Marion reroof.

Is drip edge required in Marion, IN?

Yes. REQUIRED BY CITY RULE AND BY THE STATE CODE, WITH GUTTER APRON ADDED BY THE CITY. The City's written local rule on asphalt shingle roofing, a written notice from the Office of the Building Commissioner headed "NOTICE OF LOCALE RULE", "RE: ROOFING STANDARDS", dated August 25, 2026 and signed by Building Commissioner Justin Dickerson, applies to new construction and to new roofing on existing structures, and item 2 reads: "The application of drip edge and gutter apron is required." The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry. The state side agrees on drip edge: the Indiana State Building Commissioner's memo reproduces section R905.2.8.5 of the 2020 Indiana Residential Code, whose first sentence reads: "A drip edge shall be provided at eaves and rake edges of shingle roofs." The rest of that section sets the overlap, extension and fastening of the drip edge and the order of underlayment at eaves and rakes, and 675 IAC 14-4.4 makes no change to it. The roof is inspected after tear-off and again at final, so expect the drip edge and gutter apron to be seen.

Can you roof over an existing roof in Marion, IN?

TWO LAYERS AT MOST, AND NO OVERLAY OF A WET, WORN, OR TILE ROOF. The Building Commissioner's notice on roofing standards, dated August 25, 2026, restates section R908 of the 2020 code as part of the City's local rule for asphalt shingles, applied to new construction and to reroofs. R908.3: "A Roof replacement shall include the removal of existing layers of roof coverings down to the roof deck." R908.3.1.1: a roof recover "shall not be permitted" where the existing roof or covering is water soaked or has deteriorated to the point that it is not adequate as a base for additional roofing, where the existing covering is slate, clay, cement, or asbestos-cement tile, or "Where the existing roof has two or more applications of any type of roof covering." Read together, one existing layer in sound condition may be recovered once; anything more is a tear-off to the deck. The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry.

Do roofing contractors need a license or registration in Marion, IN?

Yes. A CITY REGISTRATION WITH INSURANCE ON FILE, RENEWED EVERY YEAR. The City's Contractor Registration page opens: "All contractors doing work in the city limits must be registered to do so." The requirement is Chapter 113 of the Marion Code, from Ordinance 9-2005, which the City publishes as a 2017 printout of the chapter. Section 113.01(A) reads: "Any person, partnership or corporation that enters into any contract (verbal or written) with another person, partnership or corporation to engage in any type of construction activity, including demolition work, in or upon real estate located within the city must be registered under this chapter." Subcontractors are included, and section 113.01(E) excludes only owners and tenants: "Property owners and tenants working on their own property are excluded from registration." WHAT IT TAKES. Section 113.04 requires bodily injury, property damage and worker's compensation insurance, the liability policy in minimum amounts of "$500,000.00 for any occurrence relative to which there is an injury or death to one or more persons" and "$100,000.00 for any occurrence relative to which there is damage to property". The Building Commissioner's cover letter on the current application asks for a certificate of insurance naming the City of Marion Building Department as certificate holder, proof of worker's compensation, and, for a sole proprietor or partnership, a Worker's Compensation Clearance Certificate from the State of Indiana Worker's Compensation Board. Section 113.05(C): "The contractor registration shall be for a one year period beginning on the date of issuance." FEES. Roofing has no category of its own; the published fee schedule lists General Contractor and Non-Categorized at $200.00 unrestricted or $150.00 residential, with HVAC, electrical and plumbing at $125.00 and $100.00, and $50.00 for a sole proprietor or partnership. THE PENALTY. The permit application lists "$250.00 Contractor Registration not completed prior to starting work on any project (General or Subcontractors)", and section 113.99 provides that "whosoever violates any provision of this chapter shall be subject to a fine of not less than $100 and not more than $1,000. Each day may be considered a separate violation." Section 113.08(A) lets the Building Inspector stop work being done by an unlisted contractor.

What building code does Marion, IN use?

THE 2020 INDIANA RESIDENTIAL CODE, ADOPTED BY REFERENCE, WITH STRICTER CITY ROOFING RULES ON TOP. The City's Code of Ordinances on codelibrary.amlegal.com, section 150.45 (Ordinance 12-2019, passed October 15, 2019), incorporates by reference the Fire Prevention and Building Safety Commission's rules in Title 675 of the Indiana Administrative Code, including "Article 14 - Indiana Residential Code", and "shall include any later amendments to those rules". The current residential rule is 675 IAC 14-4.4, the 2020 Indiana Residential Code, which adopts and amends the first printing of the 2018 International Residential Code. Written reply from the City of Marion Building Department, Sep 22, 2026: "We have adopted 2020 IRC, though we do require ice and water shield as a separate jurisdiction from the county." The Building Commissioner's notice on roofing standards, dated August 25, 2026, says the City's roofing requirements mostly "refer to the 2020 Indiana Residential Code, with some stricter guidelines for buildings within city limits", and that "the City of Marion has its own codes and standards separate to Grant County." The notice is not posted online; the Department says it is available at its office, and it sent a copy by email on September 22, 2026 in reply to a written inquiry.