Permitting Authorities / Missouri / City of Marble Hill - Building Inspector
Do you need a permit to replace a roof in Marble Hill, MO?
Adopted codeCity of Marble Hill - Building Inspector
Section 515.020 of the City's code says the Building Inspector issues building permits in the City of Marble Hill, Missouri (Bollinger County), and Section 405.170, in its zoning chapter, says applications go to the Zoning Administrator; the City's site footer gives 305 1st Street as the City's address. The City's Permits and Applications section lists a construction permit application. This listing covers the office's contact details, the local sales tax rate, and the code facts quoted below; it does not cover every local permit rule.
Jurisdiction
City of Marble Hill, Missouri
Jurisdiction type
city
Address
305 1st Street, Marble Hill, MO 63764
Contact
- url: https://cityofmarblehill.org/
- phone: 573-238-3622
Permit process note
Section 515.020 of the City's code, as posted on the City's website, provides: "Except as hereinafter exempted in this Section, no wall, structure, building or part thereof shall hereafter be built, enlarged, or altered within the corporate limits until a plan of the proposed work, together with a statement of the materials to be used, shall have been submitted in writing in duplicate to the Building Inspector, who shall, in accordance with the provisions herein contained, issue a permit for the proposed construction." Section 505.005 provides that "The default Building Inspector for the City of Marble Hill shall be the City Administrator, but may be any person so designate by the Mayor with the advice and consent of the Board of Aldermen." Section 515.020 also provides: "Ordinary repairs and minor alterations not involving any change in major structural parts such as walls, beams, girders, chimneys and flues, or involving a cost of not more than five hundred dollars ($500.00), or erection of detached outbuildings outside the fire limits (such as sheds, chicken houses, and one-car private garages) costing not more than five hundred dollars ($500.00); or minor changes or repairs in electrical wiring or equipment, shall not require the issuance of a permit." Section 405.170 of the City's code provides: "Every application for a building permit shall be in writing and delivered to the Zoning Administrator" and "Any permits issued by the Zoning Administrator shall be on standard forms for such purpose and furnished by the City." It provides that a permit expires if no work has commenced "within six (6) months after the date of issue". The City's construction permit application ends with an office-use Administrator line. Section 505.010 provides that every building erected or enlarged within the fire limits "shall have the roof, also top, and sides of all roof structures, including dormer windows, covered with incombustible or fire retardant materials." Section 515.010 says the fire limits are on file in the Office of the City Clerk.
Adopted code
RSMo 67.280 lets a community with the power to do so adopt a technical code by reference: "Any community, if the community otherwise has the power under the law to adopt such an ordinance, may adopt or repeal an ordinance which incorporates by reference the provisions of any code or portions of any code". This record read Titles 4 and 5 of the City's code as posted on its website, which name no International Residential Code edition, and did not read any other ordinance or amendment.
Sales & use tax
Marble Hill's combined sales tax rate is 8.85% (use tax 6.85%), jurisdiction code 45848-017-000, per the Missouri Department of Revenue's Jurisdiction and Total Rate Database for the fourth quarter of 2026. Missouri's own state rate is 4.225%; the rest is local. Sales tax follows "the combined state and local rate at the location of the seller", so this rate applies to purchases from a seller in the town. For a re-roof, 12 CSR 10-112.010(1) provides that "a contractor is the final user and consumer of the materials and supplies used and consumed in fulfilling a construction contract and which become part of a completed real property improvement," so, in general, the roofer pays tax when it buys the materials. Under 12 CSR 10-112.010(3)(A), "In general, title passes after installation is complete, unless the contractor and purchaser expressly agree otherwise." Where title passes after attachment the contractor "is subject to tax on its purchase of the tangible personal property and does not collect tax on its transfer of ownership or title of the item." Where it passes before attachment the contractor "does not pay tax on its purchase, but must collect tax on the sale price of the item."
Local roofing hub
More roof permit pages in Missouri
Marceline, MORoof permit
Marshall, MORoof permit
Marshfield, MORoof permit
Maryland Heights, MORoof permit
Maysville, MORoof permit
Roofing in MissouriState hub
Related guides
Sources
- cityofmarblehill.org verified 2026-10-30
- img1.wsimg.com verified 2026-10-30
- img1.wsimg.com verified 2026-10-30
- img1.wsimg.com verified 2026-10-30
- revisor.mo.gov verified 2026-10-30
- img1.wsimg.com verified 2026-10-30
- dor.mo.gov verified 2026-10-30
- sos.mo.gov verified 2026-10-30
- dor.mo.gov verified 2026-10-30