Permitting Authorities / Colorado / City of Holyoke - Building Department

Do you need a permit to replace a roof in Holyoke, CO?

Adopted code

City of Holyoke - Building Department

Yes, a permit is required to replace a roof in Holyoke, CO, issued by City of Holyoke - Building Department. The City of Holyoke publishes a dedicated "Re-siding/Re-roof/Soffit Building Permit Application" and an accompanying roofing guide (in English and Spanish) among its Building Department forms and documents.

Roof code checklist: Holyoke, CO

ItemAnswerCode citeSourceVerified
Permit to replace a roofYescityofholyoke-co.gov2026-07-16
Repair permit thresholdNot published
Layer limit / roof-overPublishedR908.3.1.1api.municode.com2026-08-24
Deck & sheathingPublishedapi.municode.com2026-08-24
Drip edgeYesR905.2.8.5api.municode.com2026-08-24
Ice & water shieldNot published
Mid-roof inspectionNot published
Impact-resistant (Class 4) roofingNolibrary.municode.com2026-08-12
Wind design criteriaNot published
Adopted codePublishedapi.municode.com2026-08-24
Contractor license / registrationNot published
Sales & use taxPublishedtax.colorado.gov2026-08-24

Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.

Jurisdiction
City of Holyoke, Colorado
Jurisdiction type
city
Address
Holyoke, CO
Contact
  • url: https://www.cityofholyoke-co.gov/departments/forms_documents.php
  • phone: 970-854-2266
  • email: [email protected]
Permit portal
Roofing permit required
Required
Permit process note
The City of Holyoke publishes a dedicated "Re-siding/Re-roof/Soffit Building Permit Application" and an accompanying roofing guide (in English and Spanish) among its Building Department forms and documents.
Adopted code
The City of Holyoke has adopted the 2018 International Building Code and the 2018 International Residential Code by reference, codified at Municipal Code Sections 15.04.010 and 15.08.010, both certified by the mayor and city clerk. The code is codified through Ordinance No. 1-2024, enacted September 17, 2024.
Drip edge
Required — Holyoke has not amended Chapter 9 of the 2018 IRC, so the base code governs: Section R905.2.8.5 requires a drip edge at eaves and rake edges of shingle roofs, unconditionally, with adjacent segments overlapped not less than 2 inches and mechanically fastened to the roof deck at not more than 12 inches on center. About drip edge
Impact-resistant roofing
Not required — The City of Holyoke adopts the 2018 International Building Code and the 2018 International Residential Code, codified through Ordinance No. 1-2024 enacted September 17, 2024, and the Colorado Energy Office's statewide building code adoption record lists the same 2018 edition. The building chapter and its amendment lists were reviewed in full. The chapter contains no roof covering requirement, no impact resistance requirement and no reference to UL 2218 or Class 4 roof coverings.
Roof layer limit / recover
Holyoke has adopted the 2018 IRC by reference, Municipal Code Section 15.08.010, and its own Modifications section, Section 15.08.020, does not amend Chapter 9, Roof Assemblies, or Section R908, so the base 2018 IRC reroofing provision governs unamended: Section R908.3.1.1 bars a roof recover where the existing roof has two or more applications of any type of roof covering, so no more than two total layers may exist on a re-covered roof.
Deck & sheathing requirements
Holyoke has not amended Chapter 8 of the 2018 IRC, so the base code governs: Section R803.1 sets a minimum lumber roof sheathing thickness of 5/8 inch for 24-inch rafter or beam spacing, per Table R803.1, and wood structural panel roof sheathing must conform to DOC PS 1, DOC PS 2, CSA O437 or CSA O325 and the grades in Table R503.2.1.1(1).
Sales & use tax
Holyoke's combined sales tax rate is 5.4 percent: 2.9 percent state, 1 percent Phillips County, and 1.50 percent City of Holyoke. Holyoke is state-collected, not home-rule, and Phillips County lies outside the RTD and SCFD special-district boundaries, so no district add-on applies.

The building permit authority for the City of Holyoke in Phillips County. Maintains a dedicated re-siding/re-roof/soffit building permit application and an accompanying roofing guide, indicating roofing work requires a permit.

Hail reports near Holyoke, CO

Reports, last 24 months
3
Largest, last 24 months
1.75 in Sep 20, 2026
Most recent
Sep 20, 2026 1.75 in
Reports, last 5 years
11
5 most recent reports, last 5 years
DateHail sizeDistance
Sep 20, 20261.75 in8 mi SSW
Jun 20, 20261.00 in8 mi SE
May 30, 20261.00 in9 mi SSE
Apr 25, 20242.00 in2 mi E
Apr 25, 20241.25 in3 mi SW

Source: NOAA Storm Prediction Center severe weather database and daily storm reports (reports since the start of the current year are preliminary), within 10 miles of Holyoke, CO (Census point). Data through Oct 7, 2026, not updated since. A report is an observation, not a damage record.

Working an insurance claim in Holyoke, CO? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).

Code items like drip edge are what adjusters ask you to document.

Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.

Questions about the Holyoke, CO pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources

Free instant roof estimate — Holyoke, CO

Ballpark your replacement in 20 seconds. No phone call required to see the number.

Roofing questions: Holyoke, CO

Do you need a permit to replace a roof in Holyoke, CO?

Yes, a permit is required to replace a roof in Holyoke, CO.

Is drip edge required in Holyoke, CO?

Yes. Holyoke has not amended Chapter 9 of the 2018 IRC, so the base code governs: Section R905.2.8.5 requires a drip edge at eaves and rake edges of shingle roofs, unconditionally, with adjacent segments overlapped not less than 2 inches and mechanically fastened to the roof deck at not more than 12 inches on center.

Can you roof over an existing roof in Holyoke, CO?

Holyoke has adopted the 2018 IRC by reference, Municipal Code Section 15.08.010, and its own Modifications section, Section 15.08.020, does not amend Chapter 9, Roof Assemblies, or Section R908, so the base 2018 IRC reroofing provision governs unamended: Section R908.3.1.1 bars a roof recover where the existing roof has two or more applications of any type of roof covering, so no more than two total layers may exist on a re-covered roof.

What building code does Holyoke, CO use?

The City of Holyoke has adopted the 2018 International Building Code and the 2018 International Residential Code by reference, codified at Municipal Code Sections 15.04.010 and 15.08.010, both certified by the mayor and city clerk. The code is codified through Ordinance No. 1-2024, enacted September 17, 2024.