Permitting Authorities / City of Fayetteville, Arkansas - Building Safety Division

City of Fayetteville, Arkansas - Building Safety Division

Adopted code

The permitting authority for the City of Fayetteville, Arkansas (Washington County). Fayetteville's Building Safety Division, part of the Development Services Department, administers the Arkansas Fire Prevention Code (AFPC) - adopted by reference in City of Fayetteville Unified Development Code § 173.02(A) - together with the city's own Chapter 173 amendments covering construction documents, footings/foundations, concrete floors, crawl space, portable buildings and reroofing exemptions. Arkansas is a floor state (AFPC [A] 101.2.2) - Fayetteville must use the AFPC as its base and may only add more stringent provisions on top of it, never a different or less-stringent code. Notably, Fayetteville exempts routine residential reroofing from the building-permit requirement altogether, with no dollar or area threshold - see repair_permit_threshold.

Jurisdiction
City of Fayetteville, Arkansas
Jurisdiction type
city
Address
125 West Mountain Street, Fayetteville, AR 72701
Contact
  • url: https://www.fayetteville-ar.gov/538/Building-Safety
  • phone: 479-575-8238
Roofing permit required
Not required
Contractor registration required
Required
Registration details
  • license: STATE-LEVEL requirement, binding in Fayetteville as everywhere else in Arkansas - not a Fayetteville-specific credential. Ark. Code Ann. § 17-25-601 et seq. (Arkansas Residential Roofers Registration Law) provides, at § 17-25-603(a): "A person shall not act as a roofing contractor after July 1, 2021, unless a person is: (1) Granted a roofing contractor registration certificate by the Residential Contractors Committee; or (2) Exempt from certification under this subchapter." Violation is a Class A misdemeanor, each day a separate offense. Registration requires, per § 17-25-604(d): "(1) A surety bond in the minimum amount of fifteen thousand dollars ($15,000); (2) Proof of workers' compensation coverage ...; and (3) Any other information required by the committee." No dollar-value project threshold applies to the roofing subchapter itself (unlike the general residential tier's $2,000 exemption); the only exemptions are owner-builder/owner-occupant self-work, a broader Contractors Licensing Board license already covering roofing, or roofing work that is 50% or less of a mixed-scope home-improvement project (§ 17-25-610). Certificates expire annually (§ 17-25-609(a)); fee capped at $100 (§ 17-25-609(b)). CITY LAYER: City of Fayetteville Unified Development Code § 173.09 ("Homebuilders Licensing") separately adopts by reference "the provisions set forth in A.C.A. § 17-25-501 et seq." - the GENERAL residential building contractor/home-improvement licensing statute (Ark. Code Ann. § 17-25-501 et seq., a different subchapter from the roofing-specific one). That general statute's own exemption list, § 17-25-513(6), expressly excludes "[a] person or entity performing work as a roofing contractor as defined under § 17-25-601 et seq." from its scope, so Fayetteville's § 173.09 pass-through of the general licensing statute does not reach roofing contractors and imposes no additional city-specific roofing credential beyond the state roofing registration above.
Permit process note
Fayetteville's Building Safety Division is part of the Development Services Department, located at the Development Services Building, 125 West Mountain Street, Fayetteville, AR 72701 (479-575-8238; office hours Monday-Friday 8 a.m.-5 p.m.; inspection hours Monday-Friday 7:30 a.m.-4:30 p.m.). Permit applications, plan submittals and payments for Planning, Engineering, Building Safety, Fire Marshal and Business Licensing go through the city's online Civic Access(TM) portal (questions: 479-575-8233); the city also operates a "Same Day Permit" program under which qualifying projects submitted before 2 p.m. are routed for same-day processing and review. General Provisions at Unified Development Code § 173.01 govern permits city-wide: a permit fee must be paid before issuance (§ 173.01(A)(1)); a permit expires and becomes void if work has not commenced within six months or is abandoned for six months (§ 173.01(A)(2)); the permit applicant must notify the Building Safety Division when work is ready for inspection and provide ready access to the premises (§ 173.01(C)); and buildings may not be occupied before a Certificate of Occupancy is issued, with temporary certificates available for up to 30 days at a time (§ 173.01(F)). None of this administrative layer is roofing-specific; the substantive roofing rule is the reroofing permit exemption at § 173.02(B)(7) (see repair_permit_threshold).
Adopted code
Arkansas Fire Prevention Code (AFPC), Volume III, 2021 Edition (based on the 2021 International Residential Code), adopted statewide by the State Fire Marshal under Ark. Code Ann. § 12-13-105 - Arkansas is a FLOOR state, not a ceiling: AFPC Chapter 1 Administration, [A] 101.2.2, provides "Each district, county, municipality, or other political subdivision of this state shall only adopt and enforce the provisions of the Arkansas Fire Prevention Code, 2021 Edition. The AFPC 2021 Edition shall be the only foundation document available for modification by local jurisdictions should they choose to adopt more stringent provisions." The City of Fayetteville adopts the AFPC by reference at Unified Development Code § 173.02(A): "There is hereby adopted by the City Council, by reference thereto, the provisions set forth in the Arkansas Fire Prevention Code, with state adopted appendices, as may from time to time hereafter be amended and adopted by the State of Arkansas, save and except such portions of said code as may be deleted, modified, or amended herein." Fayetteville's own amendments to the Building Code and Fire Code are the complete, exhaustive list at § 173.02(B)(1)-(8) and § 173.02(C)(1)-(4): construction-document content requirements, footing/foundation design minimums (including a Hillside/Hilltop Overlay District engineered-foundation requirement), concrete floor slab-on-grade minimums, crawl space grading, sign-ordinance precedence, an 80-square-foot portable-building exemption, a reroofing permit exemption (see roofing_permit_required), an unfinished-project rule, and fire-code items on sprinklers, hydrant proximity, and R-1/R-2 occupant notification. None of these amendments touches Table R301.2(1), wind design speed, ground snow load, ice barrier, roof-covering layer limits, drip edge, or impact resistance (see those fields for the ABSENT/negative findings).
Mid-roof inspection
Not required — Fayetteville's Building Safety Division page lists only general inspection scheduling practice ("A minimum of one day's prior notice is required to request an inspection. Scheduling is based on availability.") and no roofing-specific or mid-roof/dry-in inspection stage is named on that page or anywhere in Unified Development Code Chapter 173, which was read in full. Because Fayetteville additionally exempts routine residential reroofing from the building-permit requirement altogether (§ 173.02(B)(7)), a permit-triggered mid-roof inspection would not arise for the ordinary residential reroof case in any event.
Impact-resistant roofing
Not required — Checked at both layers Fayetteville residential roofing actually runs through. STATE LAYER: Arkansas amends nothing in the IRC's roofing chapters (Chapter 8, Roof-Ceiling Construction, and Chapter 9, Roof Assemblies - both printed "No Changes" in the state's own 2021 AFPC rules-change document) or in Table R301.2(1), so the base, unamended 2021 IRC controls at the state level and Arkansas prints no statewide impact-resistance mandate. CITY LAYER: City of Fayetteville Unified Development Code § 173.02(B)(1)-(8) and § 173.02(C)(1)-(4) are the complete, exhaustive list of every amendment Fayetteville makes to the Building Code and Fire Prevention Code (12 numbered items, read in full) - grepped for "UL 2218" and "Class 4": zero matches. No provision in Chapter 173 addresses roof-covering impact resistance, UL 2218, or Class 4 rating.
Repair permit threshold
CITY-SPECIFIC, and unusually permissive - no dollar or area threshold at all. City of Fayetteville Unified Development Code § 173.02(B)(7), verbatim in full: "Reroofing. Reroofing of existing residential dwelling units including detached garages and portable buildings shall not require a permit. However, the project is not exempt from meeting all code requirements." A routine residential reroof in Fayetteville therefore needs no building permit regardless of project size or cost, but the finished work must still comply with every applicable AFPC/Building Code provision - the exemption is from the permit paperwork and inspection trigger, not from the substantive code.
Sales & use tax
9.750% combined in Fayetteville (Washington County) - state 6.500% (Arkansas Department of Finance and Administration, effective statewide since July 1, 2013) plus a Fayetteville city rate of 2.000% (effective January 1, 2007) plus a Washington County rate of 1.250% (effective July 1, 2021), per the DFA's current (July-September 2026) quarterly "List of Cities and Counties with Local Sales and Use Tax" table, which prints the row "Fayetteville 72-14 01/01/07 2.000% Washington 1.250% 3.250%" (3.250% total local, 9.750% grand total with the state rate). Rates are re-published quarterly; this figure should be re-verified against the then-current quarter's table before reuse in a future cycle.

Working an insurance claim in City of Fayetteville, Arkansas - Building Safety Division? Everything on this page — drip edge, ice & water shield, inspections, Class 4 rules — formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF) — one page, free.

Buy this jurisdiction's pack — $12 Delivered by email within minutes.

Questions about the City of Fayetteville, Arkansas - Building Safety Division pack?

Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.

By submitting, you agree to our Terms of Use and Privacy Policy.

Sources