Permitting Authorities / City of Davison - Building Department
Do you need a permit to replace a roof in Davison, MI?
Adopted code
City of Davison - Building Department
Yes, a permit is required to replace a roof in Davison, MI, issued by City of Davison - Building Department. The City of Davison's Applications / Permits page, read October 12, 2026, lists a "Roofing / Siding Permit" application whose Permit Type line reads "Roofing Siding Roof /Siding Combo", beside a separate "Building Permit" application, and its form says "Note: Permits for Electrical, Mechanical, and Plumbing must be obtained thru the State of Michigan." The page says "To schedule an inspection please call (810) 653-2191." and that permits may be returned to 200 E. Flint Street or placed in the drop box on the east side of the building. The Building, Planning & Zoning page says the Building Department's responsibilities include "Enforcement of the City's Building Codes" and "Issuance and inspection of permits such as construction, sidewalks, driveways, curb cuts, fences, and signs", and that "Payment method for Planning, Development & Building Permits: Cash, Check or Credit card". No fee schedule for roof permits is posted on those pages, so ask the department for the current fee. The City of Davison is a separate municipality from Davison Township, which has its own building department.
Roof code checklist: Davison, MI
Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.
Jurisdiction
City of Davison, Michigan
Address
200 E. Flint Street, Suite 2, Davison, MI 48423
Contact
- url: https://www.cityofdavisonmi.gov/488/Applications-Permits
- phone: 810-653-2191
Roofing permit required
Required
Contractor registration required
Required
Permit process note
The City of Davison's Applications / Permits page, read October 12, 2026, lists a "Roofing / Siding Permit" application whose Permit Type line reads "Roofing Siding Roof /Siding Combo", beside a separate "Building Permit" application, and its form says "Note: Permits for Electrical, Mechanical, and Plumbing must be obtained thru the State of Michigan." The page says "To schedule an inspection please call (810) 653-2191." and that permits may be returned to 200 E. Flint Street or placed in the drop box on the east side of the building. The Building, Planning & Zoning page says the Building Department's responsibilities include "Enforcement of the City's Building Codes" and "Issuance and inspection of permits such as construction, sidewalks, driveways, curb cuts, fences, and signs", and that "Payment method for Planning, Development & Building Permits: Cash, Check or Credit card". No fee schedule for roof permits is posted on those pages, so ask the department for the current fee. The City of Davison is a separate municipality from Davison Township, which has its own building department.
Adopted code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." The City of Davison's Building, Planning & Zoning page, read October 12, 2026, says the Building Department is responsible for "Enforcement of the City's Building Codes" and names no edition, and the city's permit forms name none. The city's codified ordinances are hosted by American Legal Publishing, which this directory could not open, so no codified building section was read for this record. LARA's Statewide Jurisdiction List names the City of Davison as its own building code enforcer.
Drip edge
Required — Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). The City of Davison's Building, Planning & Zoning and Applications / Permits pages and its permit forms were read for a local rule and state nothing further on drip edge; the city's codified ordinances were not read for this record.
About drip edge
Ice & water shield
Required — Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). The City of Davison's Building, Planning & Zoning and Applications / Permits pages and its permit forms were read for a local rule and state nothing further on ice barrier; the city's codified ordinances were not read for this record.
About ice & water barrier
Impact-resistant roofing
Not required — No impact-resistance requirement under state law. The 2015 Michigan Residential Code was searched in full and has no hail or impact rating rule for roof coverings: the words hail, impact and UL 2218 do not appear in it, and none of them appears in the roof assemblies chapter of the base 2015 International Residential Code either. Michigan applies one code statewide ("This act and the code apply throughout the state."), and the act gives the power to amend it to the state director, who adopts the model codes "with amendments, additions, or deletions as the director determines appropriate." The City of Davison's Building, Planning & Zoning and Applications / Permits pages and its permit forms were read for a local rule and state nothing further on impact resistance; the city's codified ordinances were not read for this record.
Repair permit threshold
The City of Davison's Applications / Permits page, read October 12, 2026, lists a "Roofing / Siding Permit" application beside its "Building Permit" application, and the form's Permit Type line reads "Roofing Siding Roof /Siding Combo". Because the city posts a dedicated roofing permit form, the record publishes that a reroof needs a permit. The page and the form state no dollar, area or ordinary-repair threshold below which roof work needs no permit. Under state law: "A building permit is not required for ordinary repairs of a building or structure." (MCL 125.1510), without a definition of ordinary repairs.
Roof layer limit / recover
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." The city's codified ordinances were not read for this record, so no local layer rule was read, and this record does not classify the local layer rule. The Building Department's pages and permit forms state no layer rule.
Deck & sheathing requirements
State law, from the base code. Michigan makes no amendment to the roof sheathing section of the 2015 International Residential Code, Section R803, which does not appear in the Michigan rule set, so it applies as published. Lumber roof sheathing follows Table R803.1: over rafters or beams 24 inches apart it must be at least 5/8 inch net thick. Wood structural panels must be identified "for grade, bond classification and performance category by a grade mark or certificate of inspection issued by an approved agency," and their spans may not exceed "the values set forth in Table R503.2.1.1(1), or APA E30." For a shingle roof the base code adds that "Asphalt shingles shall be fastened to solidly sheathed decks" (R905.2.1), and on any reroof "The structural roof components shall be capable of supporting the roof covering system" (R908.2). The City of Davison's Building, Planning & Zoning and Applications / Permits pages and its permit forms were read for a local rule and state nothing further on roof sheathing; the city's codified ordinances were not read for this record.
Sales & use tax
6%, statewide, with no local add-on. This is state law: the General Sales Tax Act sets the tax "equal to 6% of the gross proceeds of the business," the Use Tax Act sets "a total combined rate equal to 6%," and the Michigan Department of Treasury says "Michigan does not allow city or local units to impose sales tax." On a roofing job the roofer is the taxpayer on materials, because the Use Tax Act counts as a consumer "A person acquiring tangible personal property if engaged in the business of constructing, altering, repairing, or improving the real estate of others." Nothing on the City of Davison Building Department pages changes this.
Local roofing hub
More roof permit pages in Michigan
Related guides
The City of Davison's Building Department, at City Hall at 200 E. Flint Street in Davison, handles enforcement of the city's building codes and the issuance and inspection of permits, and the city posts a dedicated Roofing / Siding Permit application beside its Building Permit application. The City of Davison is a separate municipality from Davison Township. Michigan applies one residential code statewide, and for houses that is the 2015 Michigan Residential Code.
Working an insurance claim in Davison, MI? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).
Code items like drip edge and ice & water shield are what adjusters ask you to document.
Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.
Questions about the Davison, MI pack?
Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.