Yes, a permit is required to replace a roof in Township of Clay, MI, issued by Clay Township - Building Department. In Clay Township a reroof is permit work. The Building Department's page says "Permits are required for the following work:", and its list of examples includes "Tear Off, Re-Roof". The page also says "OPEN ROOF INSPECTIONS REQUIRED." with the date "Effective July 1, 2024". Permits "can be submitted in person, by mail, by email, faxed, or dropped off in our secure drop box", and "Building permits fees, which include processing, staff review and all required inspections, are based on the cost of construction." The page adds "When a contractor obtains a permit, the person who holds the license must sign the application." Building and zoning inspections are scheduled Monday through Thursday from about 9:00 am to 3:00 pm, and the page says "We require 24-hour notice for inspections"; inspections are requested by phone at 810-794-9320, Ext 147. The township office is open 7:30 AM to 5:30 PM, Monday through Thursday, closed 12 pm to 1 pm.
Roof code checklist: Township of Clay, MI
Each row comes from the sourced record on this page; full wording is in the table below. "Not published" means no official source for that item was found when the record was last verified.
Jurisdiction
Township of Clay, Michigan
Address
4710 Pointe Tremble Road, Clay, MI 48001
Contact
- url: https://www.claytwpmi.gov/buildingdept
- phone: 810-794-9320
Roofing permit required
Required
Contractor registration required
Required
Registration details
- state_level: Michigan licenses residential maintenance and alteration contractors under the Occupational Code, and that licence "includes the following crafts and trades" among which it names roofing (MCL 339.2404(3)); "A person shall not engage in or attempt to engage in the practice of an occupation regulated under this act" without the licence (MCL 339.601(1)). MCL 339.2403 lists who may work without one, including a project whose "aggregate contract price for the labor, material, and any other items for the undertaking or project is less than $600.00". This record does not decide whether a given roofer falls inside an exemption.
- city_level: The Clay Township Building Department's page says "If you are a new contractor to Clay or get a new license, we will need all license's including driver's license turned in with the application." and "When a contractor obtains a permit, the person who holds the license must sign the application." Its building permit application asks for the builder licence number and expiration date. The page posts no separate township contractor registration or fee. This record does not decide whether a given roofer falls inside a state exemption.
Permit process note
In Clay Township a reroof is permit work. The Building Department's page says "Permits are required for the following work:", and its list of examples includes "Tear Off, Re-Roof". The page also says "OPEN ROOF INSPECTIONS REQUIRED." with the date "Effective July 1, 2024". Permits "can be submitted in person, by mail, by email, faxed, or dropped off in our secure drop box", and "Building permits fees, which include processing, staff review and all required inspections, are based on the cost of construction." The page adds "When a contractor obtains a permit, the person who holds the license must sign the application." Building and zoning inspections are scheduled Monday through Thursday from about 9:00 am to 3:00 pm, and the page says "We require 24-hour notice for inspections"; inspections are requested by phone at 810-794-9320, Ext 147. The township office is open 7:30 AM to 5:30 PM, Monday through Thursday, closed 12 pm to 1 pm.
Adopted code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Township of Clay as its own building code enforcer. The Building Department's page says "The provisions of the code require any owner or authorized agent intending to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure" to apply for a permit, and the township's building permit application says "All installations shall be in conformance with the Michigan Building Code." The township's Dangerous Buildings Ordinance defines "Township Building Code" as "the building code administered and enforced in the township pursuant to the Stille-DeRossett-Hale Single State Construction Code Act". None of these names a residential code edition, and the township posts no building code ordinance.
Drip edge
Required — Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). The Building Department page, the building permit application and the township's posted ordinances were read for a local rule and state nothing further on drip edge.
About drip edge
Ice & water shield
Required — Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). The Building Department page, the building permit application and the township's posted ordinances were read for a local rule and state nothing further on ice barrier.
About ice & water barrier
Impact-resistant roofing
Not required — No impact-resistance requirement under state law. The 2015 Michigan Residential Code was searched in full and has no hail or impact rating rule for roof coverings: the words hail, impact and UL 2218 do not appear in it, and none of them appears in the roof assemblies chapter of the base 2015 International Residential Code either. Michigan applies one code statewide ("This act and the code apply throughout the state."), and the act gives the power to amend it to the state director, who adopts the model codes "with amendments, additions, or deletions as the director determines appropriate." The Building Department page, the building permit application and the township's posted ordinances were read for a local rule and state nothing further on impact resistance.
Repair permit threshold
No size or cost threshold is published. The Clay Township Building Department's page lists "Tear Off, Re-Roof" among the examples of work for which a permit is required, and states no point below which a reroof needs no permit. Under state law, "A building permit is not required for ordinary repairs of a building or structure." (MCL 125.1510), without a definition of ordinary repairs.
Roof layer limit / recover
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." The Clay Township Building Department's page and building permit application state no layer rule. The township posts no building code ordinance; its Dangerous Buildings Ordinance was read in full and its zoning ordinance was searched for roof covering provisions, and neither has a reroofing provision or amends Section R908.
Deck & sheathing requirements
State law, from the base code. Michigan makes no amendment to the roof sheathing section of the 2015 International Residential Code, Section R803, which does not appear in the Michigan rule set, so it applies as published. Lumber roof sheathing follows Table R803.1: over rafters or beams 24 inches apart it must be at least 5/8 inch net thick. Wood structural panels must be identified "for grade, bond classification and performance category by a grade mark or certificate of inspection issued by an approved agency," and their spans may not exceed "the values set forth in Table R503.2.1.1(1), or APA E30." For a shingle roof the base code adds that "Asphalt shingles shall be fastened to solidly sheathed decks" (R905.2.1), and on any reroof "The structural roof components shall be capable of supporting the roof covering system" (R908.2). The Building Department page, the building permit application and the township's posted ordinances were read for a local rule and state nothing further on roof sheathing.
Sales & use tax
6%, statewide, with no local add-on. This is state law: the General Sales Tax Act sets the tax "equal to 6% of the gross proceeds of the business," the Use Tax Act sets "a total combined rate equal to 6%," and the Michigan Department of Treasury says "Michigan does not allow city or local units to impose sales tax." On a roofing job the roofer is the taxpayer on materials, because the Use Tax Act counts as a consumer "A person acquiring tangible personal property if engaged in the business of constructing, altering, repairing, or improving the real estate of others." Nothing on the Clay Township Building Department page changes this.
Local roofing hub
More roof permit pages in Michigan
Related guides
Clay Township's Building Department, at the township offices at 4710 Pointe Tremble Road in St. Clair County, issues building permits, lists tear-off and re-roof work among the work that needs one, and does the inspections. The State of Michigan's Statewide Jurisdiction List names the Township of Clay as its own building code enforcer. Michigan's single state construction code applies, and for houses that is the 2015 Michigan Residential Code.
Working an insurance claim in Township of Clay, MI? Everything on this page (drip edge, ice & water shield, inspections, Class 4 rules) formatted as a claim-ready evidence pack: verbatim ordinance quotes, code section cites, verification dates, and official source links, ready to attach to a supplement. See a real sample pack (PDF, 4 pages, free).
Code items like drip edge and ice & water shield are what adjusters ask you to document.
Buy this jurisdiction's pack: $12 Delivered by email within minutes. Digital download: all sales are final once delivered, except for a failed delivery, a defective file, a duplicate purchase, or a pack materially different from its description. See Section 6 of our Terms of Use.
Questions about the Township of Clay, MI pack?
Not ready to buy, or need a different jurisdiction? Tell us and we’ll reply directly.