Jurisdiction
Township of Bear Creek, Michigan (Emmet County)
Address
373 North Division Road, Petoskey, MI 49770
Contact
- url: https://bearcreektownshipmi.gov/building-department/
- phone: 231-347-3204
Roofing permit required
Required
Contractor registration required
Required
Registration details
- state_level: Michigan licenses residential maintenance and alteration contractors under the Occupational Code, and that licence "includes the following crafts and trades" among which it names roofing (MCL 339.2404(3)); "A person shall not engage in or attempt to engage in the practice of an occupation regulated under this act" without the licence (MCL 339.601(1)). MCL 339.2403 lists who may work without one, including a project whose "aggregate contract price for the labor, material, and any other items for the undertaking or project is less than $600.00". This record does not decide whether a given roofer falls inside an exemption.
- city_level: Bear Creek Township's Building Permit Application for Roofing-Siding-Windows-Doors has a contractor identification block marked "CONTRACTOR IDENTIFICATION (LICENSED CONTRACTOR ONLY)" that asks for a license number and expiration date, a tax ID number, a workers compensation carrier and an MESC number, and the Building Department's pages name no separate township contractor registration. The township's ordinances were not read for this record. This record does not decide whether a given roofer falls inside a state exemption.
Permit process note
Bear Creek Township's Building Department, read October 11, 2026, posts a Building Permit Application for Roofing-Siding-Windows-Doors that prices a residential roof at "ROOFING RESIDENTIAL: $4.00 PER SQUARE WITH MINIMUM FEE OF $130.00 ALONG WITH $65.00 APPLICATION FEE", a total minimum fee for roofing, siding, doors and windows of $195.00, and says to call in inspections at 231-347-3204, Monday through Friday, 8:00 to 4:00; commercial fees are by call or visit. Its Notice to Contractors dated July 27, 2022 says "ALL REQUIRED PERMITS SHALL BE ISSUED BEFORE WORK IS STARTED.", says "Building permit applications now require two signatures: 1. Homeowner and 2. Contractor." and says "A $200.00 penalty will be accessed to work started without a permit"; the roofing application says projects started before the permit is obtained are charged an additional $50.00 fee. Applications are submitted online, and the instructions say "Upon receipt of your permit application, the Building Department will assess fees and send you an invoice." The FAQ says "EMMET COUNTY COVERS PLUMBING AND MECHANICAL FOR BEAR CREEK TOWNSHIP", so plumbing and mechanical permits go to Emmet County at 231-348-1735, and the township issues the electrical permit. The township's building department office is open 8 to 3, Monday through Friday, with building and electrical inspections by appointment.
Adopted code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Township of Bear Creek in Emmet County as its own building code enforcer for building and electrical work and assigns mechanical and plumbing work to Emmet County. The Building Department's FAQ, which carries no date, says the entire state of Michigan is under the 2015 Michigan Residential Building Code for one and two family dwellings. The township's ordinances are posted on a documents site that this record could not open, so the ordinance text was not read.
Drip edge
Required — Required on asphalt shingle roofs by state law. Michigan makes no amendment to the drip edge rule of the 2015 International Residential Code, Section R905.2.8.5, which applies as published: "A drip edge shall be provided at eaves and rake edges of shingle roofs." Segments overlap by at least 2 inches, the drip edge extends at least 1/4 inch below the roof sheathing and at least 2 inches back onto the deck, it is fastened at no more than 12 inches on center, and underlayment goes over it at the eaves and under it at the rakes. A reroof is held to the same rule, because "Materials and methods of application used for re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9" (R908.1). The Bear Creek Township Building Department pages, its roofing permit application and its FAQ were read for a local rule and state nothing further on drip edge.
About drip edge
Ice & water shield
Required — Required everywhere in Michigan by state law. Michigan fills in the climatic design table of the 2015 code once for the whole state (Rule 516, Table R301.2(1)), and its ice barrier underlayment column reads Yes. The state footnote calls for Yes "for areas where the average daily temperature in January is 25 degrees Fahrenheit" or less, or where ice damming has caused damage. The base code then requires an ice barrier "for asphalt shingles, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles and wood shakes," running "from the lowest edges of all roof surfaces to a point not less than 24 inches (610 mm) inside the exterior wall line of the building" (R905.1.2). Detached accessory structures without conditioned floor area are exempt. On a tear-off, an existing ice barrier that is adhered to the deck may stay and be covered with an additional layer (R908.3, Exception). The Bear Creek Township Building Department pages, its roofing permit application and its FAQ were read for a local rule and state nothing further on ice barrier.
About ice & water barrier
Impact-resistant roofing
Not required — No impact-resistance requirement under state law. The 2015 Michigan Residential Code was searched in full and has no hail or impact rating rule for roof coverings: the words hail, impact and UL 2218 do not appear in it, and none of them appears in the roof assemblies chapter of the base 2015 International Residential Code either. Michigan applies one code statewide ("This act and the code apply throughout the state."), and the act gives the power to amend it to the state director, who adopts the model codes "with amendments, additions, or deletions as the director determines appropriate." The Bear Creek Township Building Department pages, its roofing permit application and its FAQ were read for a local rule and state nothing further on impact resistance.
Repair permit threshold
Bear Creek Township publishes a dedicated roofing permit and no size or cost threshold. Its Building Permit Application for Roofing-Siding-Windows-Doors has a Roofing box and prices a residential roof at "ROOFING RESIDENTIAL: $4.00 PER SQUARE WITH MINIMUM FEE OF $130.00 ALONG WITH $65.00 APPLICATION FEE". The Building Department's FAQ says "Other projects requiring permits include additions, decks, siding and re-shingling and remodeling projects." and its Notice to Contractors dated July 27, 2022 says "We require building permits for roofing, siding, and windows". Under state law, "A building permit is not required for ordinary repairs of a building or structure." (MCL 125.1510), without a definition of ordinary repairs.
Roof layer limit / recover
Two layers at most, under state law. Michigan builds one- and two-family homes to the 2015 Michigan Residential Code, which adopts the 2015 International Residential Code and makes no amendment to its reroofing section, Section R908; the Michigan rule set was searched in full and R908 does not appear in it. The base section therefore applies as the International Code Council publishes it. Section R908.3.1.1 lists the conditions under which a new roof may not be laid over an existing one, and the third is "Where the existing roof has two or more applications of any type of roof covering." One existing layer may be covered once; a roof that already carries two layers is torn off to the deck. The same section also bars covering a roof that is water soaked or too deteriorated to serve as a base, and covering "slate, clay, cement or asbestos-cement tile." The Bear Creek Township Building Department pages, its roofing permit application and its FAQ state no layer rule. The township's ordinances are posted on a documents site that this record could not open, so their text was not read; this record states the state rule and does not classify the township's own text.
Deck & sheathing requirements
State law, from the base code. Michigan makes no amendment to the roof sheathing section of the 2015 International Residential Code, Section R803, which does not appear in the Michigan rule set, so it applies as published. Lumber roof sheathing follows Table R803.1: over rafters or beams 24 inches apart it must be at least 5/8 inch net thick. Wood structural panels must be identified "for grade, bond classification and performance category by a grade mark or certificate of inspection issued by an approved agency," and their spans may not exceed "the values set forth in Table R503.2.1.1(1), or APA E30." For a shingle roof the base code adds that "Asphalt shingles shall be fastened to solidly sheathed decks" (R905.2.1), and on any reroof "The structural roof components shall be capable of supporting the roof covering system" (R908.2). The Bear Creek Township Building Department pages, its roofing permit application and its FAQ were read for a local rule and state nothing further on roof sheathing.
Sales & use tax
6%, statewide, with no local add-on. This is state law: the General Sales Tax Act sets the tax "equal to 6% of the gross proceeds of the business," the Use Tax Act sets "a total combined rate equal to 6%," and the Michigan Department of Treasury says "Michigan does not allow city or local units to impose sales tax." On a roofing job the roofer is the taxpayer on materials, because the Use Tax Act counts as a consumer "A person acquiring tangible personal property if engaged in the business of constructing, altering, repairing, or improving the real estate of others." Nothing on the Bear Creek Township Building Department pages changes this.