Home / Roofing by City / Upper Allen Township, Pennsylvania

Roofing in Upper Allen Township, Pennsylvania

No, Upper Allen Township, PA does not require a permit for like-for-like roof replacement (Upper Allen Township - Community Development Department). In a historic district, Upper Allen Township's Community Development Department requires a building permit for roof work after a Certificate of Appropriateness; elsewhere it says residential roof replacements need no permit. The department's "Do I Need a Permit?" page (read October 6, 2026) says under ROOFS "Residential roof replacements do not require reviews or permits. Unless they are located within a Historic District." It adds "All non-residential roof repairs and replacements require a Building permit" and "If the property is located in a historic district, then a Building permit is required after receiving a Certificate of Appropriateness." For a property in a floodway, floodplain or other special flood hazard area the same page says "A Zoning Permit is required for ALL interior and exterior improvements, regardless of whether the list below says no permit is required." The page also says "If your project involves new construction, demolition, an addition or alterations, or extension of electrical, plumbing, or HVAC services, then the answer is yes," "If you do not see your proposed project, please contact the Township for more information," and "Please keep in mind, this information is intended as a guide only." Section 112-8.B(8) of the Township Code (read October 6, 2026) says "Building permits shall be required for all residential alterations and renovations, subject only to certain established exceptions set forth in the Uniform Construction Code," and names no roof work; Section 112-8 makes no change to the code's permit section, R105. The Uniform Construction Code's exceptions include "An ordinary repair does not require a permit" (34 Pa. Code 403.62), which defines no ordinary repair and sets no area or cost limit. For a building in a historic district, Section 155-8 says the code official "shall not issue a permit for any erection, reconstruction, alteration, restoration, demolition or razing of all or a part of any building in an Historic District until the governing body of Upper Allen Township has issued a certificate of appropriateness." The Township's 2025 Schedule of Fees (Resolution 1104) charges residential building permits "$75.50 minimum for the first $1,000.00 of construction cost" plus "$13.00 per $1,000.00 thereafter" and has no roofing line. The enacted text names no roof work either way; the no-permit line is the department's stated practice, and this record does not decide whether it is the department's reading of the Uniform Construction Code's exceptions. Under state law, Act 45 section 104(b)(5) and (6) list "Alterations to residential buildings which do not make structural changes or changes to means of egress" and "Repairs to residential buildings" among work the Act does not apply to, "except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503"; section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied"; and 34 Pa. Code 403.62(c) says "A permit is not required for the exceptions listed in § 403.1(b) (relating to scope) and the following, if the work does not violate a law or ordinance." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). The Department of Labor and Industry's register of municipal code change ordinances lists an Upper Allen Township ordinance that "Requires a building permit for all residential alterations and repairs, and establishes certain exceptions," with an approval letter mailed November 7, 2006, "Enacted 4 / 18 / 07." Read for this answer: Chapter 112 of the Township Code, Construction Codes, Uniform (Sections 112-1 to 112-8), its Uniform Construction Code ordinance with its amendments, in full; Chapter 133, Fees; Chapter 155, Historic Districts; a search of the whole Township Code for "roof" and for "reroofing," which found no permit provision naming roof work; the department's Building, Community Development and "Do I Need a Permit?" pages; its residential building permit application; and the 2025 Schedule of Fees (Resolution 1104), the one its forms page links. Permit applications go to the Community Development Department during business hours, and some can be made online through the Township's Apply for a Permit page; the 2025 Schedule of Fees says "Permit fees double if work commences before permit is obtained and fees paid." The Township Office at 100 Gettysburg Pike is open Monday to Friday, 8:00 a.m. to 4:30 p.m.; the Community Development Department's telephone is 717-591-3767. This hub aggregates roofing permit and contractor-registration requirements for Upper Allen Township, Pennsylvania, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Upper Allen Township

Roofing permit and contractor-licensing rules in Upper Allen Township are set locally by Upper Allen Township - Community Development Department. Pennsylvania issues no state roofing licence, but its Home Improvement Consumer Protection Act requires a contractor to register with the Attorney General’s Bureau of Consumer Protection before doing home improvement work, which the Act defines to include roofs on jobs over $500, unless the contractor’s home improvement work totalled less than $5,000 in the previous tax year — and the Uniform Construction Code applies to buildings throughout the Commonwealth as a minimum a municipality may exceed but not fall below, with ordinary repairs to a house outside it unless a local ordinance brings them in, so whether a reroof needs a permit is a municipal question — always confirm the current requirements with the authority before starting work.

Roofing permit
Not required
Contractor registration
Required
Adopted building code
The 2021 International Residential Code, as adopted by the State in the Pennsylvania Uniform Construction Code (UCC). 34 Pa. Code 403.21(a)(7) adopts "The 'International Residential Code of 2021,' except that:" followed by the State's list of exclusions and modifications, effective January 1, 2026 (55 Pa.B. 7701). None of the State's changes touches Chapter 9, Roof Assemblies, or Section R803, Roof Sheathing, so those apply as the International Code Council publishes them. Work on existing buildings is also pointed to the State's existing-building code: "The repair, alteration, change of occupancy, addition and relocation of existing buildings must comply with Chapter 34 of the 'International Building Code of 2021' or with the 'International Existing Building Code of 2021'" (34 Pa. Code 403.21(f)). The UCC is the minimum everywhere in the state: "no municipality may propose or enact any ordinance which is less than the minimum requirement of the Uniform Construction Code" (Pennsylvania Construction Code Act, Act 45 of 1999, section 503(b)). The Act also lists work it "shall not apply to", including "Alterations to residential buildings which do not make structural changes or changes to means of egress" or to "Repairs to residential buildings," in each case "except as might be required by ordinances" kept in force under section 303(b)(1) or adopted under section 503 (Act 45 section 104(b)(5) and (6); 34 Pa. Code 403.1(b)(8) and (9)). The Act defines a repair as "The reconstruction or renewal of any part of an existing building for the purpose of its maintenance." So whether the code's roofing rules reach a given house reroof depends on the municipality's own ordinances. Everything above is Pennsylvania state law, the same in every municipality. Locally, Upper Allen Township administers the code itself: Section 112-2 of the Township Code says "The Township hereby elects to administer and enforce the provisions of the PCCA," Section 112-5 has a Township employee serve as "the municipal Building Code Official (BCO) to act on behalf of the Township," and the Community Development Department at 100 Gettysburg Pike, Mechanicsburg, says its "Building Inspectors are responsible for reviewing and issuing building and occupancy permits." Section 112-3 adopts the Uniform Construction Code, "as amended from time to time," as the Municipal Building Code of the Township. Section 112-8 fills in the design data of Table R301.2(1), including "Ice shield underlayment required: yes," and changes nothing in the code's roofing provisions. Section 112-8 of the Township Code makes its local changes to the text of the "2018 International Residential Code for One and Two Family Dwellings," and the department's Building page names the "International Building Code (IBC) and Uniform Construction Code (UCC)" without an edition; this record has not read the 2018 edition's text.
Permit process
In a historic district, Upper Allen Township's Community Development Department requires a building permit for roof work after a Certificate of Appropriateness; elsewhere it says residential roof replacements need no permit. The department's "Do I Need a Permit?" page (read October 6, 2026) says under ROOFS "Residential roof replacements do not require reviews or permits. Unless they are located within a Historic District." It adds "All non-residential roof repairs and replacements require a Building permit" and "If the property is located in a historic district, then a Building permit is required after receiving a Certificate of Appropriateness." For a property in a floodway, floodplain or other special flood hazard area the same page says "A Zoning Permit is required for ALL interior and exterior improvements, regardless of whether the list below says no permit is required." The page also says "If your project involves new construction, demolition, an addition or alterations, or extension of electrical, plumbing, or HVAC services, then the answer is yes," "If you do not see your proposed project, please contact the Township for more information," and "Please keep in mind, this information is intended as a guide only." Section 112-8.B(8) of the Township Code (read October 6, 2026) says "Building permits shall be required for all residential alterations and renovations, subject only to certain established exceptions set forth in the Uniform Construction Code," and names no roof work; Section 112-8 makes no change to the code's permit section, R105. The Uniform Construction Code's exceptions include "An ordinary repair does not require a permit" (34 Pa. Code 403.62), which defines no ordinary repair and sets no area or cost limit. For a building in a historic district, Section 155-8 says the code official "shall not issue a permit for any erection, reconstruction, alteration, restoration, demolition or razing of all or a part of any building in an Historic District until the governing body of Upper Allen Township has issued a certificate of appropriateness." The Township's 2025 Schedule of Fees (Resolution 1104) charges residential building permits "$75.50 minimum for the first $1,000.00 of construction cost" plus "$13.00 per $1,000.00 thereafter" and has no roofing line. The enacted text names no roof work either way; the no-permit line is the department's stated practice, and this record does not decide whether it is the department's reading of the Uniform Construction Code's exceptions. Under state law, Act 45 section 104(b)(5) and (6) list "Alterations to residential buildings which do not make structural changes or changes to means of egress" and "Repairs to residential buildings" among work the Act does not apply to, "except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503"; section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied"; and 34 Pa. Code 403.62(c) says "A permit is not required for the exceptions listed in § 403.1(b) (relating to scope) and the following, if the work does not violate a law or ordinance." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). The Department of Labor and Industry's register of municipal code change ordinances lists an Upper Allen Township ordinance that "Requires a building permit for all residential alterations and repairs, and establishes certain exceptions," with an approval letter mailed November 7, 2006, "Enacted 4 / 18 / 07." Read for this answer: Chapter 112 of the Township Code, Construction Codes, Uniform (Sections 112-1 to 112-8), its Uniform Construction Code ordinance with its amendments, in full; Chapter 133, Fees; Chapter 155, Historic Districts; a search of the whole Township Code for "roof" and for "reroofing," which found no permit provision naming roof work; the department's Building, Community Development and "Do I Need a Permit?" pages; its residential building permit application; and the 2025 Schedule of Fees (Resolution 1104), the one its forms page links. Permit applications go to the Community Development Department during business hours, and some can be made online through the Township's Apply for a Permit page; the 2025 Schedule of Fees says "Permit fees double if work commences before permit is obtained and fees paid." The Township Office at 100 Gettysburg Pike is open Monday to Friday, 8:00 a.m. to 4:30 p.m.; the Community Development Department's telephone is 717-591-3767.

View the full Upper Allen Township permitting authority record →

Roofing materials for Upper Allen Township

Compare roofing material families — service life, weight, cost band, and durability — for a Upper Allen Township reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources