Hail beltYes — a permit is required to replace a roof in Stanley, ND, issued by City of Stanley, North Dakota - Planning and Zoning Administrator. Stanley City Hall is at 221 S Main St, PO Box 249, Stanley, ND 58784, on 701-628-2225, [email protected], open Monday to Friday 8:00 am to 5:00 pm. WHO DOES WHAT. Ordinance Section 5.0703 designates the Building Inspector to ENFORCE the ordinance and the Planning and Zoning Administrator to ADMINISTER it, "including the receiving of applications, the inspection of premises, the issuing of certificates of occupancy, and the issuing of building permits". Section 5.0704 then routes the approval through both the Administrator and the City Council: a permit is "approved by the Planning and Zoning Administrator and issued by the City Council". Build the Council's meeting calendar into any start date. WHAT THE APPLICATION TAKES. The City's Building Permit Application asks for the applicant, mailing address, building dimensions and materials used, and requires a drawing that "must indicate placement of structure showing footage from lot lines/setbacks from all property lines on all sides", with the note that you "May attach copy of floor plan/pre-existing plan for improvement instead of drawing". The fee "Must be paid at the time of submission of the building permit" and is non-refundable. The form is signed off by the Building Official as APPROVED or DECLINED. THE FORMS THE CITY PUBLISHES, all as downloads on its Permit Applications page: Building Permit, General Contractors License Application, Demolition Permit, Infrastructure Permit, Conditional Use Permit, Variance Permit, Rezone Application, Plat Lots Permit, Annexation Application, Sign Permit, Consent Form (legal size required, used for fences on a shared property line), Fireworks Permit, Mobile Vendor Food Permit and Special Event Mobile Vendor Food Permit. OCCUPANCY. The permit form carries a use-and-occupancy clause: "No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made, until the building official has issued a certificate of occupancy.". Stanley, North Dakota sits in one of the country's most hail-prone regions. This hub aggregates Stanley's roofing permit and contractor-registration requirements and impact-resistant material options — every fact linked to its sourced directory record.
Roofing permits & building code in Stanley
Roofing permit and contractor-licensing rules in Stanley are set locally by City of Stanley, North Dakota - Planning and Zoning Administrator. North Dakota licenses contractors at the state level under N.D.C.C. 43-07-02, which bars acting as a contractor on work costing more than $4,000 without a licence, and cities stack their own licensing on top of it — the city requirement is usually the one that bites first — while the State Building Code adopted under N.D.C.C. chapter 54-21.3 is administered locally, so a city may carry its own adopted edition and amendments — always confirm the current requirements with the authority before starting work.
- state_level: North Dakota requires a contractor licence from the Secretary of State above a dollar threshold, and the threshold is per job rather than per year. NDCC 43-07-02(1): "A person may not engage in the business nor act in the capacity of a contractor within this state when the cost, value, or price per job exceeds the sum of four thousand dollars nor may that person maintain any claim, action, suit, or proceeding in any court of this state related to the person's business or capacity as a contractor without first having a license as provided in this chapter." Roofing is not named in the chapter, but it falls inside the definition of contractor at 43-07-01(1), which covers "any person engaged in the business of construction, repair, alteration, dismantling, or demolition of ... buildings" and expressly "includes subcontractor," so a roofing sub is covered on its own account. The classes are value tiers rather than trades - there is no roofing classification - and the licence year runs "March second through March first" under 43-07-01(2). Working unlicensed above the threshold is a class A misdemeanour under 43-07-02(2) and bars the contractor from maintaining a court claim in North Dakota arising from the work, including a claim to be paid.
- city_level: STANLEY LICENSES CONTRACTORS ITSELF, AND ITS THRESHOLD IS LOWER THAN THE STATE'S. The City publishes a City of Stanley General Contractor License Application whose instruction 1 reads: "Contractors working on any project where the cost, value, or price per job or contract exceeds $2,500.00 must hold a North Dakota Contractors License and must Register with the City of Stanley." So between $2,500 and $4,000 a job can require the CITY registration while sitting below the state licence threshold - check the arithmetic on a small re-roof before assuming neither applies. HOW IT WORKS. The application asks which class of North Dakota licence the applicant holds - A, B, C or D - and states that under North Dakota Century Code Chapter 43-07-07 "the contractor's class and fee are based on how much the cost, value, or price is per job". It tells an applicant without a state licence to stop and apply to the North Dakota Secretary of State first. It requires the business name as registered in North Dakota. It notes that NDCC 43-07-04 requires a certificate of insurance showing liability coverage, filed with the Secretary of State as certificate holder, and adds that "Each contractor is required before the start of the project to show proof of liability insurance to the City of Stanley." THE FEE IS $25.00, and the City licence "expires the same date that the North Dakota general contractor's license expires", so the two run together. AND THE PERMIT WILL NOT ISSUE WITHOUT IT. Planning and Zoning Ordinance Section 5.0704: "A permit shall not be issued to any party that does not have a licensed contractor with the State of North Dakota doing the contract work for construction over the amount of four thousand dollars ($4,000.00). A person may provide his or her own labor when doing work on property in which he or she holds recorded title." That last sentence is the owner-builder exception and it is limited to the owner's own labour on property they hold recorded title to.
Impact-resistant roofing materials for Stanley hail
Stanley, North Dakota sits in one of the country's most hail-prone regions. For hail exposure, the highest impact rating a roof covering can earn is UL 2218 Class 4. These cataloged material categories reach Class 4:
Class 4 impact-resistant materials
Browse every option on the Class 4 impact-resistant materials hub, and read the Class 4 impact-resistant shingles buyer's guide. Many insurers offer premium credits for a documented Class 4 roof — confirm terms with your carrier.
Local permitting authority
Roofing guides
Sources
- stanleynd.com verified 2026-09-10
- stanleynd.com verified 2026-09-10
- ndlegis.gov verified 2026-09-10
- stanleynd.com verified 2026-09-10
- stanleynd.com verified 2026-09-10
- medialibrary.nd.gov verified 2026-09-10
- ndlegis.gov verified 2026-09-10
- tax.nd.gov verified 2026-09-10
- tax.nd.gov verified 2026-09-10