Home / Roofing by City / St. Charles, Michigan

Roofing in St. Charles, Michigan

Yes, a permit is required to replace a roof in St. Charles, MI, issued by Village of St. Charles - Building Permits. The Village of St. Charles has published nothing specific to reroofing, so the state's general permit rule applies: "before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit." Its Building Permits page says "Permits can be obtained by downloading them from this website" and lists a Building Permit, Electrical, Mechanical, Plumbing and Sign Permit and a Zoning Permit form. The building permit guidelines require, for new houses, a property address from the Saginaw County Road Commission, a copy of the deed and tax statement and a drainage plan, and say "MAKE CHECK PAYABLE TO VILLAGE OF ST. CHARLES"; they list footing, foundation, rough-in and final building inspections and do not mention a reroof. The application states "Authority: 1972 PA 230". Sec. 8-22 of the village's ordinances sets permit fees by village council resolution, and no fee schedule was found on the village's pages, so ask the village office, 989-865-8287, for the current fee. The village's contact page lists office hours of Monday-Friday 8 AM-5 PM. This hub aggregates roofing permit and contractor-registration requirements for St. Charles, Michigan, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in St. Charles

Roofing permit and contractor-licensing rules in St. Charles are set locally by Village of St. Charles - Building Permits. Michigan licenses residential roofers at the state level — the Occupational Code’s residential maintenance and alteration contractor licence names roofing among its trades, with exemptions that include a job whose whole contract price is under $600 — and some cities add a local contractor registration on top, while the Michigan Residential Code applies throughout the state, so a city, village, township or county enforces the state code rather than writing its own roofing rules — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." The Village of St. Charles's Code of Ordinances, Chapter 8 (Buildings and Building Regulations), designates the village's building official as the enforcing agency under the state act (Sec. 8-19) and adopts "The 2012 International Property Maintenance Code" (Sec. 8-48) and "The Abatement of Dangerous Buildings Code, 1997 edition" (Sec. 8-72); it adopts no residential dwelling code, and a Property Maintenance Code or dangerous buildings code is not an older edition of the residential code. The village's Building Permits page and its building permit guidelines name no residential code edition, and this record states the 2015 Michigan Residential Code for the reasons above. LARA's Statewide Jurisdiction List names the Village of St. Charles as its own building code enforcer.
Permit process
The Village of St. Charles has published nothing specific to reroofing, so the state's general permit rule applies: "before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit." Its Building Permits page says "Permits can be obtained by downloading them from this website" and lists a Building Permit, Electrical, Mechanical, Plumbing and Sign Permit and a Zoning Permit form. The building permit guidelines require, for new houses, a property address from the Saginaw County Road Commission, a copy of the deed and tax statement and a drainage plan, and say "MAKE CHECK PAYABLE TO VILLAGE OF ST. CHARLES"; they list footing, foundation, rough-in and final building inspections and do not mention a reroof. The application states "Authority: 1972 PA 230". Sec. 8-22 of the village's ordinances sets permit fees by village council resolution, and no fee schedule was found on the village's pages, so ask the village office, 989-865-8287, for the current fee. The village's contact page lists office hours of Monday-Friday 8 AM-5 PM.

View the full St. Charles permitting authority record →

Roofing materials for St. Charles

Compare roofing material families — service life, weight, cost band, and durability — for a St. Charles reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources