Home / Roofing by City / Ridley Park, Pennsylvania

Roofing in Ridley Park, Pennsylvania

Yes, a permit is required to replace a roof in Ridley Park, PA, issued by Ridley Park Borough - Code Department. Ridley Park Borough publishes a dedicated Roofing Permit form and a "Roofing and Siding" permit fee. The Borough publishes a dedicated "Ridley Park Roofing Permit" form (read October 9, 2026) that asks "Will the existing roof coverings be removed?", the roof covering and decking to be used, and roof ventilation, and says "I acknowledge that this permit is for UCC compliance only." The Borough's Building Code Enforcement Permit Fee Schedule, Resolution 2022-5, lists among its residential permits "Roofing and Siding $35 per $1000 with $104.50 min." Neither limits the roofing permit to any part of a reroof. Chapter 73 of the Borough Code adopts the Uniform Construction Code by reference (Ord. No. 1140, 2004) and names no roof work either way. Under state law, Act 45 says the Act "shall not apply to" "Alterations to residential buildings which do not make structural changes or changes to means of egress, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" or to "Repairs to residential buildings, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" (section 104(b)(5) and (6)), and of a municipal ordinance that adds to the code, section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). In practice, expect the Borough to require a roofing permit for a reroof. Its Permits & Forms page says "Work started before a permit is issued will be issued a Work Stop Order and charged double the permit application price," and the fee schedule says "Any job started without obtaining an approved permit first. will result in double the permit fees." For a property on the Borough's historic (H.A.R.B.) list, the Permits & Forms page asks for a "Like-for-Like" permit "if no changes are being made to the structure or style" and a "Certificate of Appropriateness" if there are changes. Applications go to the Borough by email, in person or by mail, with a copy of the contract and insurance certificates, and the Borough asks for them "at least 2 weeks before the job date." The roofing form asks the applicant to confirm that an ice barrier "will be provided from the eave/rake edge to a point 2' inside the exterior wall line, and pictures will be taken during the installation." Inspections and code questions go to Linn Architects at 610-566-7044, option 2. Borough Hall is open Monday to Friday, 8:30 a.m. to 4:00 p.m., at 610-532-2100. Read for this answer: Chapter 73 of the Borough Code, Building Construction, in full; every page of a search of the whole Borough Code for "roof" and for "reroofing"; the Permits & Forms page; the Roofing Permit and Building/Demo Permit forms; and the fee schedule, Resolution 2022-5. This hub aggregates roofing permit and contractor-registration requirements for Ridley Park, Pennsylvania, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Ridley Park

Roofing permit and contractor-licensing rules in Ridley Park are set locally by Ridley Park Borough - Code Department. Pennsylvania issues no state roofing licence, but its Home Improvement Consumer Protection Act requires a contractor to register with the Attorney General’s Bureau of Consumer Protection before doing home improvement work, which the Act defines to include roofs on jobs over $500, unless the contractor’s home improvement work totalled less than $5,000 in the previous tax year — and the Uniform Construction Code applies to buildings throughout the Commonwealth as a minimum a municipality may exceed but not fall below, with ordinary repairs to a house outside it unless a local ordinance brings them in, so whether a reroof needs a permit is a municipal question — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
The 2021 International Residential Code, as adopted by the State in the Pennsylvania Uniform Construction Code (UCC). 34 Pa. Code 403.21(a)(7) adopts "The 'International Residential Code of 2021,' except that:" followed by the State's list of exclusions and modifications, effective January 1, 2026 (55 Pa.B. 7701). None of the State's changes touches Chapter 9, Roof Assemblies, or Section R803, Roof Sheathing, so those apply as the International Code Council publishes them. Work on existing buildings is also pointed to the State's existing-building code: "The repair, alteration, change of occupancy, addition and relocation of existing buildings must comply with Chapter 34 of the 'International Building Code of 2021' or with the 'International Existing Building Code of 2021'" (34 Pa. Code 403.21(f)). The UCC is the minimum everywhere in the state: "no municipality may propose or enact any ordinance which is less than the minimum requirement of the Uniform Construction Code" (Pennsylvania Construction Code Act, Act 45 of 1999, section 503(b)). The Act also lists work it "shall not apply to", including "Alterations to residential buildings which do not make structural changes or changes to means of egress" or to "Repairs to residential buildings," in each case "except as might be required by ordinances" kept in force under section 303(b)(1) or adopted under section 503 (Act 45 section 104(b)(5) and (6); 34 Pa. Code 403.1(b)(8) and (9)). The Act defines a repair as "The reconstruction or renewal of any part of an existing building for the purpose of its maintenance." So whether the code's roofing rules reach a given house reroof depends on the municipality's own ordinances. Everything above is Pennsylvania state law, the same in every municipality. Locally, Ridley Park Borough takes permit applications at Borough Hall, 105 East Ward Street, "Attention: Code Department," and Chapter 73 of the Borough Code says "Ridley Park Borough hereby elects to administer and enforce the provisions of the Pennsylvania Construction Code Act." The Borough's own Roofing Permit and Building/Demo Permit forms say "All inspection requests or code questions should be directed to Linn Architects." Section 73-2 adopts the Uniform Construction Code "as amended from time to time" as the municipal building code; Chapter 73 changes nothing in the code's roofing provisions. Article II of Chapter 73 still prints the Borough's 1998 adoption of the "CABO One- and Two-Family Dwelling Code, 1995 Edition," which Section 73-3.2 keeps in force so far as it equals or exceeds the Uniform Construction Code, and the Borough's permit pages and forms name no edition; this record has not read the 1995 edition's text and does not decide which edition the Borough applies.
Permit process
Ridley Park Borough publishes a dedicated Roofing Permit form and a "Roofing and Siding" permit fee. The Borough publishes a dedicated "Ridley Park Roofing Permit" form (read October 9, 2026) that asks "Will the existing roof coverings be removed?", the roof covering and decking to be used, and roof ventilation, and says "I acknowledge that this permit is for UCC compliance only." The Borough's Building Code Enforcement Permit Fee Schedule, Resolution 2022-5, lists among its residential permits "Roofing and Siding $35 per $1000 with $104.50 min." Neither limits the roofing permit to any part of a reroof. Chapter 73 of the Borough Code adopts the Uniform Construction Code by reference (Ord. No. 1140, 2004) and names no roof work either way. Under state law, Act 45 says the Act "shall not apply to" "Alterations to residential buildings which do not make structural changes or changes to means of egress, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" or to "Repairs to residential buildings, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" (section 104(b)(5) and (6)), and of a municipal ordinance that adds to the code, section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). In practice, expect the Borough to require a roofing permit for a reroof. Its Permits & Forms page says "Work started before a permit is issued will be issued a Work Stop Order and charged double the permit application price," and the fee schedule says "Any job started without obtaining an approved permit first. will result in double the permit fees." For a property on the Borough's historic (H.A.R.B.) list, the Permits & Forms page asks for a "Like-for-Like" permit "if no changes are being made to the structure or style" and a "Certificate of Appropriateness" if there are changes. Applications go to the Borough by email, in person or by mail, with a copy of the contract and insurance certificates, and the Borough asks for them "at least 2 weeks before the job date." The roofing form asks the applicant to confirm that an ice barrier "will be provided from the eave/rake edge to a point 2' inside the exterior wall line, and pictures will be taken during the installation." Inspections and code questions go to Linn Architects at 610-566-7044, option 2. Borough Hall is open Monday to Friday, 8:30 a.m. to 4:00 p.m., at 610-532-2100. Read for this answer: Chapter 73 of the Borough Code, Building Construction, in full; every page of a search of the whole Borough Code for "roof" and for "reroofing"; the Permits & Forms page; the Roofing Permit and Building/Demo Permit forms; and the fee schedule, Resolution 2022-5.

View the full Ridley Park permitting authority record →

Roofing materials for Ridley Park

Compare roofing material families — service life, weight, cost band, and durability — for a Ridley Park reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources