Home / Roofing by City / Red Hill, Pennsylvania

Roofing in Red Hill, Pennsylvania

No, Red Hill, PA does not require a permit for like-for-like roof replacement (Red Hill Borough - Building and Zoning Permits). Red Hill Borough's code says no permit is required for installation or replacement of roofing on an existing building provided there are no structural changes. Section 5-102.1 of the Borough Code, "Work Exempt from Permit (§ R105.2 of International Residential Code)" (Ord. 433, October 13, 2004, as amended by Ord. 435, February 9, 2005; item A(7) added by Ord. No. 2020-572, December 9, 2020; read October 12, 2026), says "Permits shall not be required for the following. Exemption from the permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction." Its building list includes "Installation or replacement of roofing on an existing building, including replacement of some or all boards or sheeting on the roof deck provided there are no structural changes." The condition is that there be no structural changes; the exemption names roofing and roof-deck boards or sheeting. Section 5-105 keeps building code ordinances adopted on or before July 1, 1999 "which equal or exceed the requirements of the UCC" in effect, and this record does not decide how that section bears on Section 5-102.1. Chapter 4 of the Borough Code (Buildings) has no permit or roofing provision. The Borough's 2026 fee schedule (Resolution No. 2026-04, effective March 12, 2026, read as a scanned document) prices residential work under "Alterations and Renovations" at "1.5% of total cost of construction (materials and labor)" and has no roofing line. The Borough's Building Permit Application offers "Alteration" among its boxes of proposed construction and names no roofing, and its Zoning Permit Application and zoning fee lines name no roof work other than roof signs. A search of the whole Borough Code for "roof" and for "reroofing" found, beyond definitions and stormwater and sign provisions, only Section 27-318, the Residential Office Preservation Overlay District, which applies to Main Street frontage properties that opt into it by recording a facade easement and says that when changes are proposed to an existing building, "including, but not limited to, roofing," the applicant agrees to have the plan reviewed by an historical consultant; that overlay is a zoning condition on those properties and does not speak to an ordinary house reroof. Under state law, Act 45 section 104(b)(5) and (6) list "Alterations to residential buildings which do not make structural changes or changes to means of egress" and "Repairs to residential buildings" among work the Act does not apply to, "except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503," and 34 Pa. Code 403.62(c) says "A permit is not required for the exceptions listed in § 403.1(b) (relating to scope) and the following, if the work does not violate a law or ordinance." Work that needs a permit and goes ahead without one risks the Borough's fee line "Work without a permit or commencing will result in the permit fee being DOUBLED" and the penalty in Section 5-107, a summary offense punished by "a fine of not more than $1,000 and costs." Permit applications go to the Borough office, and the Forms page says "Code and Zoning Officials have fifteen (15) business days to review and approve or deny a permit application once all required information, documentation, and project requirements have been submitted and satisfied." The Borough office is open Monday to Thursday, 10 am to 2 pm, at 215-679-2040. Read for this record: Chapter 5, Part 1 of the Borough Code (Sections 5-101 to 5-111, the Pennsylvania Uniform Construction Code), in full; Chapter 4 (Buildings); every page of a search of the whole Borough Code for "roof" and for "reroofing"; Section 27-318; the Forms, Documents and Permit Applications and Administration pages; the 2026 fee schedule; and the Building Permit and Zoning Permit Applications. This hub aggregates roofing permit and contractor-registration requirements for Red Hill, Pennsylvania, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Red Hill

Roofing permit and contractor-licensing rules in Red Hill are set locally by Red Hill Borough - Building and Zoning Permits. Pennsylvania issues no state roofing licence, but its Home Improvement Consumer Protection Act requires a contractor to register with the Attorney General’s Bureau of Consumer Protection before doing home improvement work, which the Act defines to include roofs on jobs over $500, unless the contractor’s home improvement work totalled less than $5,000 in the previous tax year — and the Uniform Construction Code applies to buildings throughout the Commonwealth as a minimum a municipality may exceed but not fall below, with ordinary repairs to a house outside it unless a local ordinance brings them in, so whether a reroof needs a permit is a municipal question — always confirm the current requirements with the authority before starting work.

Roofing permit
Not required
Contractor registration
Required
Adopted building code
The 2021 International Residential Code, as adopted by the State in the Pennsylvania Uniform Construction Code (UCC). 34 Pa. Code 403.21(a)(7) adopts "The 'International Residential Code of 2021,' except that:" followed by the State's list of exclusions and modifications, effective January 1, 2026 (55 Pa.B. 7701). None of the State's changes touches Chapter 9, Roof Assemblies, or Section R803, Roof Sheathing, so those apply as the International Code Council publishes them. Work on existing buildings is also pointed to the State's existing-building code: "The repair, alteration, change of occupancy, addition and relocation of existing buildings must comply with Chapter 34 of the 'International Building Code of 2021' or with the 'International Existing Building Code of 2021'" (34 Pa. Code 403.21(f)). The UCC is the minimum everywhere in the state: "no municipality may propose or enact any ordinance which is less than the minimum requirement of the Uniform Construction Code" (Pennsylvania Construction Code Act, Act 45 of 1999, section 503(b)). The Act also lists work it "shall not apply to", including "Alterations to residential buildings which do not make structural changes or changes to means of egress" or to "Repairs to residential buildings," in each case "except as might be required by ordinances" kept in force under section 303(b)(1) or adopted under section 503 (Act 45 section 104(b)(5) and (6); 34 Pa. Code 403.1(b)(8) and (9)). The Act defines a repair as "The reconstruction or renewal of any part of an existing building for the purpose of its maintenance." So whether the code's roofing rules reach a given house reroof depends on the municipality's own ordinances. Everything above is Pennsylvania state law, the same in every municipality. Locally, Red Hill Borough issues permits through its Borough office, at 56 West Fourth Street: Section 5-101 of the Borough Code says the Borough "hereby elects to administer and enforce the provisions of the Pennsylvania Construction Code Act," Section 5-102 adopts the Uniform Construction Code "as amended from time to time" as the building code of the Borough, the Borough's Forms page says "All permit applications must be sent directly to the borough office," and its Administration page lists an administrative assistant as the "Building, Zoning , U&O, Residential Rental & Commercial Fire Safety Clerk." Section 5-103 lets Borough Council choose by resolution among a Borough code official, retained third-party agencies and other arrangements, and the pages read do not say which is in use. Section 5-102.1 changes the code's permit exemptions only, as quoted in the permit fields, and nothing in Chapter 5, Part 1 changes the code's roofing provisions. The Borough's pages name no construction code edition; its fee schedule refers to "the 2018 IRC definition of a residential building, and any subsequent revisions" and names no other edition; the text above is the 2021 edition's, and this record has not read the 2018 edition's text and does not decide which edition the Borough applies.
Permit process
Red Hill Borough's code says no permit is required for installation or replacement of roofing on an existing building provided there are no structural changes. Section 5-102.1 of the Borough Code, "Work Exempt from Permit (§ R105.2 of International Residential Code)" (Ord. 433, October 13, 2004, as amended by Ord. 435, February 9, 2005; item A(7) added by Ord. No. 2020-572, December 9, 2020; read October 12, 2026), says "Permits shall not be required for the following. Exemption from the permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction." Its building list includes "Installation or replacement of roofing on an existing building, including replacement of some or all boards or sheeting on the roof deck provided there are no structural changes." The condition is that there be no structural changes; the exemption names roofing and roof-deck boards or sheeting. Section 5-105 keeps building code ordinances adopted on or before July 1, 1999 "which equal or exceed the requirements of the UCC" in effect, and this record does not decide how that section bears on Section 5-102.1. Chapter 4 of the Borough Code (Buildings) has no permit or roofing provision. The Borough's 2026 fee schedule (Resolution No. 2026-04, effective March 12, 2026, read as a scanned document) prices residential work under "Alterations and Renovations" at "1.5% of total cost of construction (materials and labor)" and has no roofing line. The Borough's Building Permit Application offers "Alteration" among its boxes of proposed construction and names no roofing, and its Zoning Permit Application and zoning fee lines name no roof work other than roof signs. A search of the whole Borough Code for "roof" and for "reroofing" found, beyond definitions and stormwater and sign provisions, only Section 27-318, the Residential Office Preservation Overlay District, which applies to Main Street frontage properties that opt into it by recording a facade easement and says that when changes are proposed to an existing building, "including, but not limited to, roofing," the applicant agrees to have the plan reviewed by an historical consultant; that overlay is a zoning condition on those properties and does not speak to an ordinary house reroof. Under state law, Act 45 section 104(b)(5) and (6) list "Alterations to residential buildings which do not make structural changes or changes to means of egress" and "Repairs to residential buildings" among work the Act does not apply to, "except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503," and 34 Pa. Code 403.62(c) says "A permit is not required for the exceptions listed in § 403.1(b) (relating to scope) and the following, if the work does not violate a law or ordinance." Work that needs a permit and goes ahead without one risks the Borough's fee line "Work without a permit or commencing will result in the permit fee being DOUBLED" and the penalty in Section 5-107, a summary offense punished by "a fine of not more than $1,000 and costs." Permit applications go to the Borough office, and the Forms page says "Code and Zoning Officials have fifteen (15) business days to review and approve or deny a permit application once all required information, documentation, and project requirements have been submitted and satisfied." The Borough office is open Monday to Thursday, 10 am to 2 pm, at 215-679-2040. Read for this record: Chapter 5, Part 1 of the Borough Code (Sections 5-101 to 5-111, the Pennsylvania Uniform Construction Code), in full; Chapter 4 (Buildings); every page of a search of the whole Borough Code for "roof" and for "reroofing"; Section 27-318; the Forms, Documents and Permit Applications and Administration pages; the 2026 fee schedule; and the Building Permit and Zoning Permit Applications.

View the full Red Hill permitting authority record →

Roofing materials for Red Hill

Compare roofing material families — service life, weight, cost band, and durability — for a Red Hill reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources