Home / Roofing by City / Post Falls, Idaho

Roofing in Post Falls, Idaho

Yes, a permit is required to replace a roof in Post Falls, ID, issued by City of Post Falls - Community Development Department, Building Division. Post Falls takes building applications through its Community Development Portal, where the City states you can "apply, upload plans, pay fees online, schedule inspections, and view inspection results". An account is tied to the email address it is created with; the City suggests one account per company rather than one per employee, and warns that a shared generic account gives everyone with that password access to every permit filed under it. INSPECTION SCHEDULING IS THE PART THAT COSTS A CREW A DAY. The City states that inspections run Monday to Friday, 9am to 3:30pm, except holidays, that requests received before 11:59pm are scheduled for the following business day, and that same-day inspections are not allowed. There is a dedicated inspection line at 208-457-3334; a request must leave the permit number, job address, inspection type and the date wanted, or it cannot be scheduled, and requests left after midnight the night before cannot be taken for the following day. The Building Division does not schedule morning or afternoon slots, so the job has to be ready first thing. The Building Division counter is on the 1st floor of City Hall, 408 N Spokane Street, open 8am to 5pm Monday through Friday. Since 2015 the City, rather than the State, issues all plumbing and electrical permits and inspections for work in Post Falls; permits issued before June 7, 2015 for plumbing and July 9, 2015 for electrical remain with the State. Appeals from a decision of the Building Official are heard by the City's Building Code Board of Appeals, whose application fee the City's schedule sets at $150.00. This hub aggregates roofing permit and contractor-registration requirements for Post Falls, Idaho, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Post Falls

Roofing permit and contractor-licensing rules in Post Falls are set locally by City of Post Falls - Community Development Department, Building Division. Idaho roofers come under the Idaho Contractor Registration Act (Idaho Code 54-5201 et seq.), which makes it unlawful to work as a contractor without registering with the Idaho Contractors Board in the Division of Occupational and Professional Licenses, exempts only a casual or minor job whose labour and materials together come to less than $2,000, and requires the contractor’s registration number on the building permit, while a city or county that issues building permits must adopt the residential code edition set by the Idaho Building Code Board and may amend its roofing provisions only on a finding of good cause for building or life safety after a public hearing — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
LOCALLY ENACTED, ON A STATE-MANDATED EDITION. Post Falls Municipal Code 15.04.020 adopts "The 2018 International Residential Code (IRC), prepared by the International Code Council, Inc., as adopted by the State of Idaho through the Idaho Building Code Board, together with any amendments or revisions to the IRC made by the Idaho Building Code Board through the negotiated rulemaking process ... with the following exceptions or amendments", enacted by Ordinance 1328 of 2017 and amended by Ordinance 1405 of 2020. Post Falls Municipal Code 15.04.020, the City's own adopting section, lists nineteen exceptions and amendments to the 2018 International Residential Code, and none of them touches Chapter 9, Roof Assemblies, or Chapter 8, Roof-Ceiling Construction; they reach occupancy classification, plan submittal and construction documents, snow loads, garage separation, under-stair protection, flood-resistant construction, footings and foundation reinforcement, and which parts and appendices of the code are adopted. Two of the nineteen matter to a roofer even though neither is a roofing rule: item 8 replaces Section R301.2.3 and sets a minimum roof design snow load of 40 psf, and item 19 adopts no appendices except Appendix J, Existing Buildings and Structures, with named exclusions, and Appendix K, Sound Transmission. Item 18 records that Parts VII Plumbing and VIII Electrical of the IRC are not adopted, because the City runs those trades on separate codes. The rest of Chapter 15.04 adopts the 2018 International Building Code (15.04.010), the 2018 International Energy Conservation Code (15.04.030), the 2018 International Fuel Gas Code (15.04.040), the 2018 International Mechanical Code (15.04.050), the 2018 International Existing Building Code (15.04.060), the 2017 Idaho State Plumbing Code (15.04.070), the 2023 National Electrical Code (15.04.080) and the 2009 International Property Maintenance Code (15.04.090). The City's own Current Adopted Codes and Design Criteria sheet lists the same suite and adds ICC A117.1-2009 for accessibility. Post Falls Municipal Code 15.04.110 makes the Building Official the administrative authority for all of those codes and provides that any provision of them "that are more restrictive than the provisions of other local or State codes take precedence over such local or State Code". THE STATE FRAMEWORK: Idaho's residential code is set by the Idaho Building Code Board, not by the city. IDAPA 24.39.30.600.03 adopts the "International Residential Code, 2018 Edition ... Parts I, II, III, and IX of the 2018 Edition for one (1)- and two (2)-family dwellings", effective July 1, 2024, together with a list of state amendments; Idaho Code 39-4116(2) requires a local government that issues building permits and performs code enforcement to adopt the Idaho residential code parts I-III and IX by ordinance. Parts IV through VIII -- energy, mechanical, fuel gas, plumbing and electrical -- are not part of the Idaho residential code (Idaho Code 39-4109(1)(b)); roofing sits in Part III and is included. Idaho Code 39-4116(2) also bars a local jurisdiction from adopting provisions of a later IRC edition the Board has not adopted, so a city cannot be ahead of the state. Idaho Code 39-4116(6): "Permits shall be governed by the laws in effect at the time the permit application is received."
Registration details
  • state_level: STATEWIDE, AND INDEPENDENT OF WHATEVER THIS JURISDICTION REQUIRES. Idaho Code 54-5204(1), in the Idaho Contractor Registration Act (Title 54, Chapter 52): "On and after January 1, 2006, it shall be unlawful for any person to engage in the business of, or hold himself out as, a contractor within this state without being registered as required in this chapter." A roofer is inside the definitions rather than at their edge: "Construction" means "the performance of building, altering, repairing, adding to, subtracting from, improving, reconstructing, moving, excavating, wrecking or demolishing any building ... or improvement to real property, or to do any part thereof" (54-5203(2)), and "Contractor" means any person who "undertakes, offers to undertake, purports to have the capacity to undertake, or submits a bid to, or does himself or by or through others, perform construction" (54-5203(3)(a)). Roofing is not separately licensed in Idaho, so this registration is the whole of the state credential. THRESHOLD: 54-5205(2)(f) exempts work on "one (1) undertaking or project considered casual, minor, or inconsequential, whether by one (1) or more contracts, the aggregate contract price of which, for labor and materials and all other items, is less than two thousand dollars ($2,000)" -- a per-project figure covering labour and materials together, not annual revenue, and the same paragraph voids the exemption where the work is part of a larger project or where one job is split into sub-$2,000 contracts. A residential reroof is rarely under $2,000. An owner working on his own residential property is exempt (54-5205(2)(l)), as is an owner who hires a registered contractor (54-5205(2)(k)); an employee on wages is exempt but an unregistered subcontractor is not (54-5205(2)(a)). CONSEQUENCES OF NOT REGISTERING, and a homeowner should check: an unregistered contractor "shall be deemed to have conclusively waived any right to place a lien upon real property" (54-5208); may not "bring or maintain any action in any court of this state for the collection of compensation" without proving registration throughout the work (54-5217(2)); and is guilty of a misdemeanor punishable by a fine up to $1,000, up to six months in county jail, or both (54-5217(1)). AT THE PERMIT COUNTER: 54-5209(1) requires every county, municipality or district that issues building permits to request the contractor's Idaho registration number and print it on the face of the permit, or else print "no contractor registration provided"; 54-5209(2) requires the permit to be posted at the site so that statement is visible. WHAT IT TAKES: an application under oath, proof of worker's compensation coverage or a statement why it is not required, and a general liability policy including products and completed operations coverage of not less than $300,000 single limit (54-5210(1)). It is a registration, not a competency licence -- there is no examination. Administered by the Idaho Contractors Board within the Division of Occupational and Professional Licenses (54-5206(1)); registrations can be checked by name at the Division's public search.
  • city_level: Post Falls adds no contractor credential of its own, and it enforces the state one at the counter. Title 5 of the Post Falls Municipal Code, Business Licenses and Regulations, contains eight chapters -- alcoholic beverage control, secondhand and junk dealers, hotel and motel registers, door to door solicitation, merchant and security police, bathhouses and massage parlors, mobile food vending, and general business license -- and none of them is a construction-trade, contractor or roofing credential. What the City does have is a general business licence at Chapter 5.32, which applies to "all wholesale and retail businesses and all activities, occupational callings, trades, pursuits or professions that conduct business from a location within the City of Post Falls with the object of gain, profit, benefit or advantage" (5.32.020), requires the licence before engaging in business (5.32.030(A)) and runs for one calendar year so long as ownership, management, nature of business and location are unchanged. That is a general business registration rather than a trade credential, and whether it reaches a roofing contractor with no Post Falls business location is a question for the Community Development Department. What Post Falls does require on a permit is the state number: its residential plan submittal requirements list, among the items a completed building permit application must carry, "Owner and/or contractor name & registration number, address, phone numbers, signed and dated".
Permit process
Post Falls takes building applications through its Community Development Portal, where the City states you can "apply, upload plans, pay fees online, schedule inspections, and view inspection results". An account is tied to the email address it is created with; the City suggests one account per company rather than one per employee, and warns that a shared generic account gives everyone with that password access to every permit filed under it. INSPECTION SCHEDULING IS THE PART THAT COSTS A CREW A DAY. The City states that inspections run Monday to Friday, 9am to 3:30pm, except holidays, that requests received before 11:59pm are scheduled for the following business day, and that same-day inspections are not allowed. There is a dedicated inspection line at 208-457-3334; a request must leave the permit number, job address, inspection type and the date wanted, or it cannot be scheduled, and requests left after midnight the night before cannot be taken for the following day. The Building Division does not schedule morning or afternoon slots, so the job has to be ready first thing. The Building Division counter is on the 1st floor of City Hall, 408 N Spokane Street, open 8am to 5pm Monday through Friday. Since 2015 the City, rather than the State, issues all plumbing and electrical permits and inspections for work in Post Falls; permits issued before June 7, 2015 for plumbing and July 9, 2015 for electrical remain with the State. Appeals from a decision of the Building Official are heard by the City's Building Code Board of Appeals, whose application fee the City's schedule sets at $150.00.

View the full Post Falls permitting authority record →

Roofing materials for Post Falls

Compare roofing material families — service life, weight, cost band, and durability — for a Post Falls reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources