Home / Roofing by City / Mount Pleasant, Wisconsin

Roofing in Mount Pleasant, Wisconsin

Hail belt

Yes — a permit is required to replace a roof in Mount Pleasant, WI, issued by Village of Mount Pleasant, Wisconsin - Building Inspection. Mount Pleasant takes permit applications online. The Village states that it "accepts online applications for building permits and inspections, and several other services," through a system built by BS&A Software, and that an applicant "must have an account with BS&A in order to use the Village's current system," with a free account created on the vendor's site; the Village publishes a walkthrough for it. The Roof-Siding-Window paper form is marked "For reference only" and points applicants to the online portal. Building Inspection is at 8811 Campus Drive on 262-664-7824 or 262-664-7825. On timing, Municipal Code section 14-8(n) provides that all work must begin within 180 days from the date the permit is issued or as otherwise stated on the permit approval, that an extension must be applied for to carry on past the permit's time limit and carries its own fee, and that additions and alterations to a one- or two-family dwelling must be finished within two years of issue. Permit fees are set by the Village Board under Chapter 30 of the Code, must be paid before the permit issues, and are nonrefundable. The permit card must be posted at the front of the property, visible from the public roadway and protected from deterioration, and where there are no visible address numbers the applicant must put up temporary numbers at least three inches tall. A property owner pulling the permit personally must include the cautionary statement the Village publishes for owners. Inspections are arranged by calling or emailing Building Inspection. Mount Pleasant, Wisconsin sits in one of the country's most hail-prone regions. This hub aggregates Mount Pleasant's roofing permit and contractor-registration requirements and impact-resistant material options — every fact linked to its sourced directory record.

Roofing permits & building code in Mount Pleasant

Roofing permit and contractor-licensing rules in Mount Pleasant are set locally by Village of Mount Pleasant, Wisconsin - Building Inspection. Wisconsin requires a state credential before a residential building permit can be issued — under Wis. Admin. Code SPS 305.31 the permit applicant must hold a Department of Safety and Professional Services Dwelling Contractor or Dwelling Contractor-Restricted certification — and the state Uniform Dwelling Code governs one- and two-family construction statewide, so a city sets its own permit administration rather than its own roofing-code provisions — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
STATE CODE, ADOPTED BY THE VILLAGE AND EXTENDED TO PRE-1980 HOUSES. One- and two-family dwellings in Mount Pleasant are built to the Wisconsin Uniform Dwelling Code, chs. SPS 320 to 325 of the Wisconsin Administrative Code. That code is Wisconsin's own text rather than an adoption of the International Residential Code, which is why its roofing rules read differently from the IRC and why no IRC edition year applies to a house here. Municipal Code section 14-5 provides that "The Village Board hereby adopts following Wisconsin Administrative Codes and all amendments thereto by reference," listing at (e) "Chapters SPS 320-325 Uniform Dwelling Code (UDC)" along with SPS 302 fees, SPS 305 credentials, SPS 316 electrical, SPS 318 elevators, SPS 326 manufactured homes, SPS 328 smoke and carbon monoxide detectors, the commercial building code at SPS 361-366, SPS 371 solar energy systems, SPS 375-379 for buildings constructed before 1914 and SPS 390 public swimming pools. The words "and all amendments thereto" make the adoption a floating one rather than a frozen edition, and the same section sets the tie-breaker: "The Wisconsin Administrative Code shall apply when any conflict between this code and the Wisconsin Administrative Code arises." Section 14-6 then applies the Mount Pleasant Building Code to "new construction, additions, or alterations" of, among other things, one- and two-family dwellings, with express exceptions only for children's play apparatus and landscaping features. Commercial and multifamily buildings run on the separate Wisconsin Commercial Building Code and are not the subject of the residential fields recorded here. Article I of Chapter 14, which is the whole of the Village building code content, sections 14-1 through 14-40, was read in full, and it adds no roof-assembly requirement of its own - no layer rule, no ice barrier rule, no drip edge and no fastening schedule. The chapter was recodified by Ordinance No. 25-2021 on November 8, 2021.
Registration details
  • license: A PAIR OF STATE CREDENTIALS, AND THE STATE HALF ATTACHES TO PULLING THE PERMIT. State level: Wisconsin requires a contractor credential to obtain a building permit for a one- or two-family dwelling. The contracting business must hold a Dwelling Contractor certification from the Department of Safety and Professional Services, which rests on proof of financial responsibility - a bond or liability insurance, plus worker's compensation and unemployment insurance statements - and must hold or employ someone holding a Dwelling Contractor Qualifier certification, which requires at least 12 hours of approved coursework in construction law, construction codes and construction business practices. A restricted version of the certification is issued to an applicant bonding under 25,000 dollars; that is a bond-size distinction, not a narrower scope of work. There is no separate roofing licence in Wisconsin - a roofer holds the same dwelling contractor credential a framer or a siding contractor holds. An owner who resides or will reside in the dwelling and pulls the permit personally is exempt. Note that the state requirement is written as a condition on obtaining a building permit, and Wisconsin has not settled whether a like-for-like reroof needs a uniform dwelling code permit at all, so ask before assuming it is triggered on a job the municipality does not permit. The certification reaches houses of every vintage: Wis. Stat. 101.615(3) applies the certification sections to a permit application to perform work on a dwelling whose initial construction commenced before, on or after December 1, 1978, so the age carve-out that limits the construction standards does not limit the credential. Village level: Mount Pleasant issues no credential of its own and enforces the state pair on the face of its roofing permit form. Municipal Code section 14-5(b) adopts "Chapter SPS 305, Licenses, Certifications and Registrations" of the Wisconsin Administrative Code by reference, and section 14-12(a) requires that "Inspectors certified in accordance with Chapter SPS 305 shall perform inspections." The Village Roof-Siding-Window Permit Application has fields for the installation contractor, the Contractor License No. with its expiry date and the DCQ License No. with its expiry date, and its footnote states that "A contractor license is only required for a contractor to perform work on 1 and 2 family homes." Where the owner pulls the permit, the form directs them to disregard the contractor portion and to include the cautionary statement instead. Article I of Chapter 14 was read in full and creates no Village roofing licence or registration, and neither does the Village licensing chapter, whose fourteen articles cover direct sellers, amusements, pool and billiards, massage, junk and salvage, tents and temporary structures, dance halls, security guards, closing out sales, tobacco retailers, festivals, fees and pet shops.
Permit process
Mount Pleasant takes permit applications online. The Village states that it "accepts online applications for building permits and inspections, and several other services," through a system built by BS&A Software, and that an applicant "must have an account with BS&A in order to use the Village's current system," with a free account created on the vendor's site; the Village publishes a walkthrough for it. The Roof-Siding-Window paper form is marked "For reference only" and points applicants to the online portal. Building Inspection is at 8811 Campus Drive on 262-664-7824 or 262-664-7825. On timing, Municipal Code section 14-8(n) provides that all work must begin within 180 days from the date the permit is issued or as otherwise stated on the permit approval, that an extension must be applied for to carry on past the permit's time limit and carries its own fee, and that additions and alterations to a one- or two-family dwelling must be finished within two years of issue. Permit fees are set by the Village Board under Chapter 30 of the Code, must be paid before the permit issues, and are nonrefundable. The permit card must be posted at the front of the property, visible from the public roadway and protected from deterioration, and where there are no visible address numbers the applicant must put up temporary numbers at least three inches tall. A property owner pulling the permit personally must include the cautionary statement the Village publishes for owners. Inspections are arranged by calling or emailing Building Inspection.

View the full Mount Pleasant permitting authority record →

Impact-resistant roofing materials for Mount Pleasant hail

Mount Pleasant, Wisconsin sits in one of the country's most hail-prone regions. For hail exposure, the highest impact rating a roof covering can earn is UL 2218 Class 4. These cataloged material categories reach Class 4:

Browse every option on the Class 4 impact-resistant materials hub, and read the Class 4 impact-resistant shingles buyer's guide. Many insurers offer premium credits for a documented Class 4 roof — confirm terms with your carrier.

Sources