Home / Roofing by City / Lower Makefield Township, Pennsylvania

Roofing in Lower Makefield Township, Pennsylvania

Yes, a permit is required to replace a roof in Lower Makefield Township, PA, issued by Lower Makefield Township - Community Development Department. Section 97-3 of the Township Code (Ord. No. 342, adopted July 7, 2004) makes these changes to the Uniform Construction Code: "Section 403.1 is amended to delete the exclusions contained in subsection (b)"; "Section 403.62 (Permit requirements and exemptions) is amended to delete subsection (c)"; and "The Code is amended to delete, to the extent permissible, any exclusion of repairs/nonstructural alterations for homeowners contained in the Code." It names no roof work. Section 403.62 has been amended since 2004 (in 2006 and 2009), and this record does not decide which of its current subsections Section 97-3 reaches, including the sentence "An ordinary repair does not require a permit" now in 403.62(d). The Community Development Department's General Instructions for Permit Applications (read October 6, 2026) say "A permit is always required for any addition or structural modification to your existing living space," list other permit work without naming roofing, and add "Please know that this list is not inclusive; permits for other activities may be required." The 2026 fee schedule's residential (R-3 and R-4) building permit fees name no roof work; its only roofing line, "Includes roofing, doors, windows, etc. requiring no structurual changes to building or structure," sits under "Miscellaneous Renovations for use groups other than R-3." The department's pages read for this record say nothing on reroofing either way. Under state law, Act 45 says the Act "shall not apply to" "Alterations to residential buildings which do not make structural changes or changes to means of egress, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" or to "Repairs to residential buildings, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" (section 104(b)(5) and (6)), and of a municipal ordinance that adds to the code, section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). In practice, expect the Township to treat a reroof as permit work under Section 97-3; the pages read for this record state no penalty for starting without a permit. Applications go through the Township's online permit portal, and the instructions say the Township "must be listed as" certificate holder "on a current Certificate of Insurance for all contractors, electricians and/or plumbers for all applications." Residential alteration permits cost 1.25% of construction cost, minimum $100, and the department asks for up to 15 business days for residential permits. Read for this answer: Chapter 97 of the Township Code, Construction Code, Uniform (Sections 97-1 to 97-7), in full; a search of the whole Township Code for "roof," which found no other permit provision naming roof work; the General Instructions for Permit Applications; the Township's permit portal list of permit types; and the 2026 fee schedule. Permit questions go to 267-274-1126; inspections are scheduled through the portal or at 267-274-1121. Office hours are 8:00 a.m. to 4:30 p.m., Monday to Friday. This hub aggregates roofing permit and contractor-registration requirements for Lower Makefield Township, Pennsylvania, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Lower Makefield Township

Roofing permit and contractor-licensing rules in Lower Makefield Township are set locally by Lower Makefield Township - Community Development Department. Pennsylvania issues no state roofing licence, but its Home Improvement Consumer Protection Act requires a contractor to register with the Attorney General’s Bureau of Consumer Protection before doing home improvement work, which the Act defines to include roofs on jobs over $500, unless the contractor’s home improvement work totalled less than $5,000 in the previous tax year — and the Uniform Construction Code applies to buildings throughout the Commonwealth as a minimum a municipality may exceed but not fall below, with ordinary repairs to a house outside it unless a local ordinance brings them in, so whether a reroof needs a permit is a municipal question — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
The 2021 International Residential Code, as adopted by the State in the Pennsylvania Uniform Construction Code (UCC). 34 Pa. Code 403.21(a)(7) adopts "The 'International Residential Code of 2021,' except that:" followed by the State's list of exclusions and modifications, effective January 1, 2026 (55 Pa.B. 7701). None of the State's changes touches Chapter 9, Roof Assemblies, or Section R803, Roof Sheathing, so those apply as the International Code Council publishes them. Work on existing buildings is also pointed to the State's existing-building code: "The repair, alteration, change of occupancy, addition and relocation of existing buildings must comply with Chapter 34 of the 'International Building Code of 2021' or with the 'International Existing Building Code of 2021'" (34 Pa. Code 403.21(f)). The UCC is the minimum everywhere in the state: "no municipality may propose or enact any ordinance which is less than the minimum requirement of the Uniform Construction Code" (Pennsylvania Construction Code Act, Act 45 of 1999, section 503(b)). The Act also lists work it "shall not apply to", including "Alterations to residential buildings which do not make structural changes or changes to means of egress" or to "Repairs to residential buildings," in each case "except as might be required by ordinances" kept in force under section 303(b)(1) or adopted under section 503 (Act 45 section 104(b)(5) and (6); 34 Pa. Code 403.1(b)(8) and (9)). The Act defines a repair as "The reconstruction or renewal of any part of an existing building for the purpose of its maintenance." So whether the code's roofing rules reach a given house reroof depends on the municipality's own ordinances. Everything above is Pennsylvania state law, the same in every municipality. Locally, Lower Makefield Township administers the code itself: Section 97-1 of the Township Code says the Township "hereby elects to administer and enforce the provisions of the Pennsylvania Construction Code, Act 45 of 1999," and its Community Development Department is "responsible for the administration of the Township" building codes and takes permit applications through the Township's online portal. Section 97-2 adopts the Uniform Construction Code "as amended from time to time" as the Township's building code. Section 97-3 of the Township Code (Ord. No. 342, adopted July 7, 2004) makes these changes to the Uniform Construction Code: "Section 403.1 is amended to delete the exclusions contained in subsection (b)"; "Section 403.62 (Permit requirements and exemptions) is amended to delete subsection (c)"; and "The Code is amended to delete, to the extent permissible, any exclusion of repairs/nonstructural alterations for homeowners contained in the Code." It names no roof work. Section 403.62 has been amended since 2004 (in 2006 and 2009), and this record does not decide which of its current subsections Section 97-3 reaches, including the sentence "An ordinary repair does not require a permit" now in 403.62(d). The Township's permit portal describes its UCC Building Permit under the State's 2021 codes, effective January 1, 2026. Chapter 97 changes nothing in the code's roofing provisions.
Permit process
Section 97-3 of the Township Code (Ord. No. 342, adopted July 7, 2004) makes these changes to the Uniform Construction Code: "Section 403.1 is amended to delete the exclusions contained in subsection (b)"; "Section 403.62 (Permit requirements and exemptions) is amended to delete subsection (c)"; and "The Code is amended to delete, to the extent permissible, any exclusion of repairs/nonstructural alterations for homeowners contained in the Code." It names no roof work. Section 403.62 has been amended since 2004 (in 2006 and 2009), and this record does not decide which of its current subsections Section 97-3 reaches, including the sentence "An ordinary repair does not require a permit" now in 403.62(d). The Community Development Department's General Instructions for Permit Applications (read October 6, 2026) say "A permit is always required for any addition or structural modification to your existing living space," list other permit work without naming roofing, and add "Please know that this list is not inclusive; permits for other activities may be required." The 2026 fee schedule's residential (R-3 and R-4) building permit fees name no roof work; its only roofing line, "Includes roofing, doors, windows, etc. requiring no structurual changes to building or structure," sits under "Miscellaneous Renovations for use groups other than R-3." The department's pages read for this record say nothing on reroofing either way. Under state law, Act 45 says the Act "shall not apply to" "Alterations to residential buildings which do not make structural changes or changes to means of egress, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" or to "Repairs to residential buildings, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" (section 104(b)(5) and (6)), and of a municipal ordinance that adds to the code, section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). In practice, expect the Township to treat a reroof as permit work under Section 97-3; the pages read for this record state no penalty for starting without a permit. Applications go through the Township's online permit portal, and the instructions say the Township "must be listed as" certificate holder "on a current Certificate of Insurance for all contractors, electricians and/or plumbers for all applications." Residential alteration permits cost 1.25% of construction cost, minimum $100, and the department asks for up to 15 business days for residential permits. Read for this answer: Chapter 97 of the Township Code, Construction Code, Uniform (Sections 97-1 to 97-7), in full; a search of the whole Township Code for "roof," which found no other permit provision naming roof work; the General Instructions for Permit Applications; the Township's permit portal list of permit types; and the 2026 fee schedule. Permit questions go to 267-274-1126; inspections are scheduled through the portal or at 267-274-1121. Office hours are 8:00 a.m. to 4:30 p.m., Monday to Friday.

View the full Lower Makefield Township permitting authority record →

Roofing materials for Lower Makefield Township

Compare roofing material families — service life, weight, cost band, and durability — for a Lower Makefield Township reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources