Home / Roofing by City / Howard Township, Michigan

Roofing in Howard Township, Michigan

Yes, a permit is required to replace a roof in Howard Township, MI, issued by Howard Charter Township - Building Department. Howard Charter Township's Building Department page says "Zoning compliance required - Application available on Zoning Page" and offers a Plan Review Application, Building Permit Application, Demo Permit Application and separate electrical, plumbing and mechanical applications; it names no roofing permit and no reroof rule. Completed applications go to the Building Permit Inspector at Howard Township, 1345 Barron Lake Rd, Niles, MI 49120, with checks payable to Howard Township, and the inspector's listed office hours are Wednesday 9am to 12pm at 269-998-2765. The building permit application is the state's form BCC-324 (04/2024); it lists a $75.00 fee to re-open an expired permit and a $50.00 certificate of occupancy fee and says the first $100.00 of an application is non-refundable, and the township posts no fee schedule by type of work. The township's building guide says "Failing to complete required inspections may result in stop work orders, tear outs, redoes, fines and extra costs to the contractor and/or owner". The township hall is open Tuesday through Friday 9am to 5pm at 269-684-0072. This hub aggregates roofing permit and contractor-registration requirements for Howard Township, Michigan, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Howard Township

Roofing permit and contractor-licensing rules in Howard Township are set locally by Howard Charter Township - Building Department. Michigan licenses residential roofers at the state level — the Occupational Code’s residential maintenance and alteration contractor licence names roofing among its trades, with exemptions that include a job whose whole contract price is under $600 — and some cities add a local contractor registration on top, while the Michigan Residential Code applies throughout the state, so a city, village, township or county enforces the state code rather than writing its own roofing rules — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Township of Howard in Cass County as its own building code enforcer. The township's building permit application, the state form BCC-324 (04/2024), says "All installations shall be in compliance with the Michigan Building Codes." and lists "Residential - Buildings Regulated by the Michigan Residential Code"; neither that application nor the township's building guide names an edition, and no township building ordinance was found on the township's site, whose ordinances page says "Please contact the Township Office for copies of an Ordinance at 269-684-0072".
Permit process
Howard Charter Township's Building Department page says "Zoning compliance required - Application available on Zoning Page" and offers a Plan Review Application, Building Permit Application, Demo Permit Application and separate electrical, plumbing and mechanical applications; it names no roofing permit and no reroof rule. Completed applications go to the Building Permit Inspector at Howard Township, 1345 Barron Lake Rd, Niles, MI 49120, with checks payable to Howard Township, and the inspector's listed office hours are Wednesday 9am to 12pm at 269-998-2765. The building permit application is the state's form BCC-324 (04/2024); it lists a $75.00 fee to re-open an expired permit and a $50.00 certificate of occupancy fee and says the first $100.00 of an application is non-refundable, and the township posts no fee schedule by type of work. The township's building guide says "Failing to complete required inspections may result in stop work orders, tear outs, redoes, fines and extra costs to the contractor and/or owner". The township hall is open Tuesday through Friday 9am to 5pm at 269-684-0072.

View the full Howard Township permitting authority record →

Roofing materials for Howard Township

Compare roofing material families — service life, weight, cost band, and durability — for a Howard Township reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources