Home / Roofing by City / Hazleton, Pennsylvania

Roofing in Hazleton, Pennsylvania

Yes, a permit is required to replace a roof in Hazleton, PA, issued by City of Hazleton - Licenses & Permits Office. Read October 6, 2026, the City's Permits and Licenses page says "Building permits are required for any interior renovations to your property including plumbing, electrical and general repair. Building permits are also required for exterior renovations including new siding, roof or sidewalk, the addition of sheds and fences and paving, and blacktop and concrete work." Section 180-13 of the City Code (Ord. No. 2015-8, amended by Ord. No. 2022-5), headed "Work authorization permit required for types of work exempt from Uniform Construction Code," says a City work authorization permit "shall be required of an owner or authorized agent to construct, enlarge, alter, repair, move, demolish or change" listed work, including "Alterations to residential buildings which do not make structural changes or changes to the means of egress" and "Repairs to residential buildings, with the exception of painting, papering, tiling, carpeting and similar work." It names no roof work. Under state law, Act 45 says the Act "shall not apply to" "Alterations to residential buildings which do not make structural changes or changes to means of egress, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" or to "Repairs to residential buildings, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" (section 104(b)(5) and (6)), and of a municipal ordinance that adds to the code, section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). The Department of Labor and Industry's register of municipal code change ordinances lists two Hazleton City filings: one that "Requires a building permit for all residential alterations and repairs, except for painting, papering, tiling, carpeting and similar finish work," enacted June 18, 2009, and shown as rescinded January 22, 2014; and one that "Requires a building permit for all repairs to residential buildings with the exception of painting, papering, tiling, carpeting and similar work," with an approval letter mailed January 7, 2014. In practice, plan on a City permit for any reroof, as the City's permit page says. Section 180-9 says "Failure to obtain a construction work permit, those activities and fees outlined in the currently effective fee schedule, shall result in a penalty of two times the cost of obtaining the permit, plus administrative fees," and Section 180-12 says a third offense "shall result in suspension of the license of the contractor performing the work for the remainder of the calendar year." The City's fee schedule lists "180-15 Work Permits" at $60.00 and refers UCC permits to "See UCC Fee Schedule"; the permit page says to call the License & Permits office at (570) 459-4960 for the cost of a building permit and that "permit applications can require up to 15 days for a residential property." It adds "All outstanding fees and fines must be paid up before a permit can be issued. This includes property taxes, garbage, water and sewer." Section 180-13 also requires the work authorization permit to be "posted in a conspicuous area where the work is being done and visible from an exterior public access area." Separately, Section 399-1 makes owners of a building "with a metal roof" near a sidewalk, street or neighboring property responsible to "install snow cleats, barriers, or other such structural impediments" where sliding snow and ice could cause harm. The offices are at City Hall, 40 North Church Street, third floor, Monday to Friday, 8:30 a.m. to 4:00 p.m.; office main phone (570) 459-4925. This hub aggregates roofing permit and contractor-registration requirements for Hazleton, Pennsylvania, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Hazleton

Roofing permit and contractor-licensing rules in Hazleton are set locally by City of Hazleton - Licenses & Permits Office. Pennsylvania issues no state roofing licence, but its Home Improvement Consumer Protection Act requires a contractor to register with the Attorney General’s Bureau of Consumer Protection before doing home improvement work, which the Act defines to include roofs on jobs over $500, unless the contractor’s home improvement work totalled less than $5,000 in the previous tax year — and the Uniform Construction Code applies to buildings throughout the Commonwealth as a minimum a municipality may exceed but not fall below, with ordinary repairs to a house outside it unless a local ordinance brings them in, so whether a reroof needs a permit is a municipal question — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
The 2021 International Residential Code, as adopted by the State in the Pennsylvania Uniform Construction Code (UCC). 34 Pa. Code 403.21(a)(7) adopts "The 'International Residential Code of 2021,' except that:" followed by the State's list of exclusions and modifications, effective January 1, 2026 (55 Pa.B. 7701). None of the State's changes touches Chapter 9, Roof Assemblies, or Section R803, Roof Sheathing, so those apply as the International Code Council publishes them. Work on existing buildings is also pointed to the State's existing-building code: "The repair, alteration, change of occupancy, addition and relocation of existing buildings must comply with Chapter 34 of the 'International Building Code of 2021' or with the 'International Existing Building Code of 2021'" (34 Pa. Code 403.21(f)). The UCC is the minimum everywhere in the state: "no municipality may propose or enact any ordinance which is less than the minimum requirement of the Uniform Construction Code" (Pennsylvania Construction Code Act, Act 45 of 1999, section 503(b)). The Act also lists work it "shall not apply to", including "Alterations to residential buildings which do not make structural changes or changes to means of egress" or to "Repairs to residential buildings," in each case "except as might be required by ordinances" kept in force under section 303(b)(1) or adopted under section 503 (Act 45 section 104(b)(5) and (6); 34 Pa. Code 403.1(b)(8) and (9)). The Act defines a repair as "The reconstruction or renewal of any part of an existing building for the purpose of its maintenance." So whether the code's roofing rules reach a given house reroof depends on the municipality's own ordinances. Everything above is Pennsylvania state law, the same in every municipality. Locally, the City of Hazleton administers the code itself: Section 180-1 of the City Code says "This municipality hereby elects to administer and enforce the provisions of the Pennsylvania Construction Code Act," its Permits and Licenses page answers "When do I need to obtain a building permit?" and sends fee questions to the License & Permits office, and its Building Inspections page lists the City's PAUCC Building Inspector with office hours at City Hall. Section 180-3 lets the City act through its own code official or a retained third-party agency; the pages read do not say which arrangement the inspector works under. Chapter 180 of the City Code, Construction Codes (Articles I to III, Sections 180-1 to 180-17), read in full, adopts the Uniform Construction Code "as amended from time to time" (Section 180-2, amended by Ord. No. 2022-5) and changes nothing in the code's roofing provisions; it names no code edition. Section 180-13 of the City Code (Ord. No. 2015-8, amended by Ord. No. 2022-5), headed "Work authorization permit required for types of work exempt from Uniform Construction Code," says a City work authorization permit "shall be required of an owner or authorized agent to construct, enlarge, alter, repair, move, demolish or change" listed work, including "Alterations to residential buildings which do not make structural changes or changes to the means of egress" and "Repairs to residential buildings, with the exception of painting, papering, tiling, carpeting and similar work." It names no roof work. The City's Building Inspections page links its design criteria as "Design Criteria (Prevailing Code 2018 Edition of IBC)" and the City's code names no edition; the text above is the 2021 edition's, and the 2018 edition's text was not read for this record. The City names roof work as permit work on its permit page, quoted in the permit entries of this record.
Registration details
  • state_level: Home Improvement Consumer Protection Act, Act 132 of 2008, 73 P.S. 517.1 et seq.: registration with the Attorney General's Bureau of Consumer Protection before performing any home improvement over $500 (section 2, section 3(a)); persons whose home improvements totalled less than $5,000 in the previous taxable year are not "contractors" (section 2). Section 12 precludes local registration or licensing of home improvement contractors, with carve-outs for building permits, pre-existing tested trade licences, and local insurance standards adopted before January 1, 2006.
  • city_level: Chapter 184 of the City Code requires a City contractor licence and fee for contractors working for commercial or industrial entities, and Section 184-2 says "Contractors performing work for private residences as defined above are not subject to this license"; Section 184-3 asks every contractor for proof of $500,000/$500,000 liability insurance at licence application. The City's Permits and Licenses page says "Anyone conducting business within the Hazleton city limits must pay a license fee," a general business licence.
Permit process
Read October 6, 2026, the City's Permits and Licenses page says "Building permits are required for any interior renovations to your property including plumbing, electrical and general repair. Building permits are also required for exterior renovations including new siding, roof or sidewalk, the addition of sheds and fences and paving, and blacktop and concrete work." Section 180-13 of the City Code (Ord. No. 2015-8, amended by Ord. No. 2022-5), headed "Work authorization permit required for types of work exempt from Uniform Construction Code," says a City work authorization permit "shall be required of an owner or authorized agent to construct, enlarge, alter, repair, move, demolish or change" listed work, including "Alterations to residential buildings which do not make structural changes or changes to the means of egress" and "Repairs to residential buildings, with the exception of painting, papering, tiling, carpeting and similar work." It names no roof work. Under state law, Act 45 says the Act "shall not apply to" "Alterations to residential buildings which do not make structural changes or changes to means of egress, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" or to "Repairs to residential buildings, except as might be required by ordinances in effect pursuant to section 303(b)(1) or adopted pursuant to section 503" (section 104(b)(5) and (6)), and of a municipal ordinance that adds to the code, section 503(c) says "An ordinance under this subsection shall not be effective nor enforceable unless subsections (d), (e), (f), (g), (h) and (i) have been satisfied." This record does not decide whether the municipality's requirement is one adopted under section 503 or kept in effect by section 303(b)(1). The Department of Labor and Industry's register of municipal code change ordinances lists two Hazleton City filings: one that "Requires a building permit for all residential alterations and repairs, except for painting, papering, tiling, carpeting and similar finish work," enacted June 18, 2009, and shown as rescinded January 22, 2014; and one that "Requires a building permit for all repairs to residential buildings with the exception of painting, papering, tiling, carpeting and similar work," with an approval letter mailed January 7, 2014. In practice, plan on a City permit for any reroof, as the City's permit page says. Section 180-9 says "Failure to obtain a construction work permit, those activities and fees outlined in the currently effective fee schedule, shall result in a penalty of two times the cost of obtaining the permit, plus administrative fees," and Section 180-12 says a third offense "shall result in suspension of the license of the contractor performing the work for the remainder of the calendar year." The City's fee schedule lists "180-15 Work Permits" at $60.00 and refers UCC permits to "See UCC Fee Schedule"; the permit page says to call the License & Permits office at (570) 459-4960 for the cost of a building permit and that "permit applications can require up to 15 days for a residential property." It adds "All outstanding fees and fines must be paid up before a permit can be issued. This includes property taxes, garbage, water and sewer." Section 180-13 also requires the work authorization permit to be "posted in a conspicuous area where the work is being done and visible from an exterior public access area." Separately, Section 399-1 makes owners of a building "with a metal roof" near a sidewalk, street or neighboring property responsible to "install snow cleats, barriers, or other such structural impediments" where sliding snow and ice could cause harm. The offices are at City Hall, 40 North Church Street, third floor, Monday to Friday, 8:30 a.m. to 4:00 p.m.; office main phone (570) 459-4925.

View the full Hazleton permitting authority record →

Roofing materials for Hazleton

Compare roofing material families — service life, weight, cost band, and durability — for a Hazleton reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources