Home / Roofing by City / Conway, Arkansas

Roofing in Conway, Arkansas

Hail belt

Yes — a permit is required to replace a roof in Conway, AR, issued by City of Conway, Arkansas - Building Permits & Inspections Department. The Building Permits & Inspections Department sits at 1111 Main St, Conway, AR 72032; phone (501) 450-6107, email [email protected]. The City's own guidance states individual permits are required for electrical, plumbing, gas, and mechanical work in addition to the building permit, and impact fees apply to all new one- and two-family dwellings. Applications may be submitted online through the City's Civic Access Portal (Tyler EnerGov) at https://conwayar-energovweb.tylerhost.net/apps/SelfService#/home, which the City states are "given priority in processing," or in person between 8:00 a.m. and 4:30 p.m. Per the City's guidance: "Trade permit applications may take 1-2 business days to process. Residential permit review may take up to 3-5 business days. Commercial permit review may take 2-3 weeks." Commencing work before permit issuance doubles the applicable permit fee (Sec. 11.16.06). Building permit fees are calculated based on total under-roof square footage regardless of whether the space is heated/cooled, with stated minimums per category (New Construction, Addition, Remodeling, Accessory). Conway, Arkansas sits in one of the country's most hail-prone regions. This hub aggregates Conway's roofing permit and contractor-registration requirements and impact-resistant material options — every fact linked to its sourced directory record.

Roofing permits & building code in Conway

Roofing permit and contractor-licensing rules in Conway are set locally by City of Conway, Arkansas - Building Permits & Inspections Department. Arkansas registers roofing contractors under a statute written for roofing alone — A.C.A. 17-25-601 et seq. has required a roofing contractor registration certificate from the Residential Contractors Committee since July 1, 2021, with a $15,000 surety bond, proof of workers’ compensation, and annual renewal, and there is no dollar threshold below which it stops applying, so a roofer is covered on any job while the general residential contractor tier expressly exempts roofing — and the Arkansas Fire Prevention Code is a floor a city may build on but not fall below, so local amendments only add requirements — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
Conway Municipal Code Sec. 11.16.01 (Adoption of.) states, verbatim: "There is hereby adopted by the City of Conway, Arkansas, pursuant to A.C.A. § 14-55-207(a), for the purpose of establishing rules and regulations for the construction, alteration, removal, demolition, equipment, use and occupancy, location and maintenance of buildings and structures, including permits and penalties, that certain building code known as the International Arkansas Fire Prevention Code Volumes II and III, 2007 edition thereof, as well as subsequent editions as adopted by the State of Arkansas, of which not less than three (3) copies of each of the codes... have been and are on file in the office of the Clerk/Treasurer of the City... and from the date on which this chapter shall take effect, the provisions thereof shall be controlling in the construction of all buildings and other structures within the corporate limits of the City, except as regulated by other ordinances of this Code." (Amended by Ord. No. O-24-65, § 1, 9-24-2024, the current codified version.) This is a rolling reference clause, not a fixed-year adoption: it tracks whatever edition the State of Arkansas currently has in force. Arkansas's own Fire Prevention Code is itself a statewide floor, not a ceiling: AFPC [A] 101.2.2 (Locally adopted codes) provides that "Each district, county, municipality, or other political subdivision of this state shall only adopt and enforce the provisions of the Arkansas Fire Prevention Code, 2021 Edition[; t]he AFPC 2021 Edition shall be the only foundation document available for modification by local jurisdictions should they choose to adopt more stringent provisions." The City's own current-codes notice to the public (a Building Permits & Inspections Department PDF, filename dated Sept. 2024 - consistent with the O-24-65 amendment date) confirms which edition Sec. 11.16.01's rolling clause resolves to today, listing: "2021 Arkansas Fire Prevention Code / 2021 International Building Code / 2021 International Mechanical Code / 2020 National Electrical Code / 2018 Arkansas Plumbing Code / 2018 Arkansas Gas Code / 2017 ANSI / 2014 Arkansas Energy Code." Chapter 11.16 (all four of its sections - 11.16.01 Adoption, 11.16.05 fire-district limits, 11.16.06 fee-schedule amendments, 11.16.07 site drainage) and Chapter 11.32 (City Building Department, both sections) were read in full and contain no city-specific amendment to the IRC's roofing chapters (8 or 9); the only local amendments found anywhere in Title 11 are the permit fee schedule (11.16.06), the historic fire-district boundary description (11.16.05), and the site-drainage review carve-outs (11.16.07) - none roofing-specific.
Registration details
  • license: STATE-LEVEL requirement, applies in Conway exactly as everywhere else in Arkansas. Ark. Code Ann. § 17-25-601 et seq. (the Arkansas Residential Roofers Registration Law) requires, verbatim, at § 17-25-603(a): "A person shall not act as a roofing contractor after July 1, 2021, unless a person is: (1) Granted a roofing contractor registration certificate by the Residential Contractors Committee; or (2) Exempt from certification under this subchapter." Operating without one is, per § 17-25-603(b), "upon conviction guilty of a Class A misdemeanor with each day in violation of the requirement to constitute a separate offense." To obtain the certificate, § 17-25-604(d) requires "(1) A surety bond in the minimum amount of fifteen thousand dollars ($15,000); (2) Proof of workers' compensation coverage as required under § 11-9-401 et seq.; and (3) Any other information required by the committee." The certificate expires one year after issuance and the fee is capped at $100 (§ 17-25-609). This roofing-specific registration is a distinct regime from Arkansas's general residential building contractor license (Ark. Code Ann. § 17-25-501 et seq.), which expressly exempts roofing contractors at § 17-25-513(6): "A person or entity performing work as a roofing contractor as defined under § 17-25-601 et seq." is exempted from that general subchapter's licensing requirement. CITY LAYER: Conway Municipal Code Title 4 (Business Licenses and Regulations) was walked in full (20 chapters: Advertising, Ambulance Service, Beverage Permit, Used Tire Dealers, Door-to-Door Solicitors and Peddlers, Skating Rinks, Sunday Sales, Taxicabs, Electric/Gas/Telephone Franchise chapters, Act 9 Industries, Wrecker and Towing Service, Yard Sales, Cable Television, Alltel Communications Franchise, Pawnshops, franchise chapters for Conway Regional Medical Center and Lightcore, and Ice Cream Vendors) and contains no general contractor-registration or contractor-business-license chapter. No separate Conway contractor registration requirement was found beyond the state roofing registration above.
Permit process
The Building Permits & Inspections Department sits at 1111 Main St, Conway, AR 72032; phone (501) 450-6107, email [email protected]. The City's own guidance states individual permits are required for electrical, plumbing, gas, and mechanical work in addition to the building permit, and impact fees apply to all new one- and two-family dwellings. Applications may be submitted online through the City's Civic Access Portal (Tyler EnerGov) at https://conwayar-energovweb.tylerhost.net/apps/SelfService#/home, which the City states are "given priority in processing," or in person between 8:00 a.m. and 4:30 p.m. Per the City's guidance: "Trade permit applications may take 1-2 business days to process. Residential permit review may take up to 3-5 business days. Commercial permit review may take 2-3 weeks." Commencing work before permit issuance doubles the applicable permit fee (Sec. 11.16.06). Building permit fees are calculated based on total under-roof square footage regardless of whether the space is heated/cooled, with stated minimums per category (New Construction, Addition, Remodeling, Accessory).

View the full Conway permitting authority record →

Impact-resistant roofing materials for Conway hail

Conway, Arkansas sits in one of the country's most hail-prone regions. For hail exposure, the highest impact rating a roof covering can earn is UL 2218 Class 4. These cataloged material categories reach Class 4:

Browse every option on the Class 4 impact-resistant materials hub, and read the Class 4 impact-resistant shingles buyer's guide. Many insurers offer premium credits for a documented Class 4 roof — confirm terms with your carrier.

Sources