Home / Roofing by City / Byron, Michigan

Roofing in Byron, Michigan

Yes, a permit is required to replace a roof in Byron, MI, issued by Village of Byron - Village Office. In the Village of Byron the village office handles zoning and the county handles building permits: the Building / Zoning page says "Building, Mechanical, Plumbing and Electric - These Permits are handled by Shiawassee County" and gives the county line 989-743-2396, and its zoning permit form says work "shall not be commenced until it has been approved and inspected by the Zoning Administrator". Shiawassee County's own 2025 jurisdiction list, created on 8/15/2025, shows Byron as Local in its Zoning, Building and Electrical columns and County in its Mechanical and Plumbing columns, which differs from the village page; this record reports both, and the village page is the current instruction to applicants. The county's building permit application says "Building work shall not be started until the permit has been issued by the Shiawassee County Building & Trades Dept". The village accepts zoning permit payments at the village office, 146 S Saginaw Street, by check by mail or in person, or by credit card online, and a Permit Waiver form states "Does not require a Zoning Permit!". The village page posts a code enforcement phone line, 810-252-0565, and no building fee schedule. This hub aggregates roofing permit and contractor-registration requirements for Byron, Michigan, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Byron

Roofing permit and contractor-licensing rules in Byron are set locally by Village of Byron - Village Office. Michigan licenses residential roofers at the state level — the Occupational Code’s residential maintenance and alteration contractor licence names roofing among its trades, with exemptions that include a job whose whole contract price is under $600 — and some cities add a local contractor registration on top, while the Michigan Residential Code applies throughout the state, so a city, village, township or county enforces the state code rather than writing its own roofing rules — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." The Village of Byron's Building / Zoning page and its zoning permit form name no residential code edition; the form says the work is installed "in accordance with the local zoning, building, sewer/water, and, any required drain code". The village's ordinances page was not found among the pages the village site links for this record, so no codified building chapter was read. This record states the 2015 Michigan Residential Code for the reasons above.
Permit process
In the Village of Byron the village office handles zoning and the county handles building permits: the Building / Zoning page says "Building, Mechanical, Plumbing and Electric - These Permits are handled by Shiawassee County" and gives the county line 989-743-2396, and its zoning permit form says work "shall not be commenced until it has been approved and inspected by the Zoning Administrator". Shiawassee County's own 2025 jurisdiction list, created on 8/15/2025, shows Byron as Local in its Zoning, Building and Electrical columns and County in its Mechanical and Plumbing columns, which differs from the village page; this record reports both, and the village page is the current instruction to applicants. The county's building permit application says "Building work shall not be started until the permit has been issued by the Shiawassee County Building & Trades Dept". The village accepts zoning permit payments at the village office, 146 S Saginaw Street, by check by mail or in person, or by credit card online, and a Permit Waiver form states "Does not require a Zoning Permit!". The village page posts a code enforcement phone line, 810-252-0565, and no building fee schedule.

View the full Byron permitting authority record →

Roofing materials for Byron

Compare roofing material families — service life, weight, cost band, and durability — for a Byron reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources