Home / Roofing by City / Berkley, Michigan

Roofing in Berkley, Michigan

Yes, a permit is required to replace a roof in Berkley, MI, issued by City of Berkley - Community Development Department. The City of Berkley has its own roof permit: the Community Development Department posts a "Roof Permit Application" packet and takes roof permits online through BSA Online. The packet's Roof Specifications sheet lists the city's steps: "Strip shingles from house and haul away", "Replace any damaged wood", "Call for open roof inspection", "Install ice and water shield on eaves edge", "Install #15 felt on entire roof", "Install metal drip edge on eave and rake edges", "Flash & counterflash chimney" and "No staples to be used." Applications can be filed online, by email, by mail, in the City Hall dropbox or in person, and "A copy of your certificate of insurance must be on file with the building division before any permits will be issued." Inspection requests go to the building division by email and must be in "by 3:00 pm to be included on the following day's inspection schedule"; building inspections run Monday through Friday, 9:30 am to 1:00 pm. The office (248-658-3320) is open Monday through Friday, 8:30 AM to 5 PM, closed 1 to 2 PM. Where a permit is pulled, the city's fee schedule charges a building permit fee of $50.00 for the first $1,000.00 of construction value and $20.00 for each additional $1,000.00, $50.00 for the first inspection and $45.00 for each additional inspection, and a $35.00 "Residential Maintenance and Alteration" contractor registration. This hub aggregates roofing permit and contractor-registration requirements for Berkley, Michigan, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Berkley

Roofing permit and contractor-licensing rules in Berkley are set locally by City of Berkley - Community Development Department. Michigan licenses residential roofers at the state level — the Occupational Code’s residential maintenance and alteration contractor licence names roofing among its trades, with exemptions that include a job whose whole contract price is under $600 — and some cities add a local contractor registration on top, while the Michigan Residential Code applies throughout the state, so a city, village, township or county enforces the state code rather than writing its own roofing rules — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the City of Berkley as its own building code enforcer. Berkley's codified Sec. 26-1 adopts "Michigan Residential Code", which names no residential code edition; the reprinted code page in the city's roof permit packet, dated September 2001, names the "2000 MICHIGAN RESIDENTIAL CODE"; that text was not read, and this record states the 2015 Michigan Residential Code for the reasons above.
Permit process
The City of Berkley has its own roof permit: the Community Development Department posts a "Roof Permit Application" packet and takes roof permits online through BSA Online. The packet's Roof Specifications sheet lists the city's steps: "Strip shingles from house and haul away", "Replace any damaged wood", "Call for open roof inspection", "Install ice and water shield on eaves edge", "Install #15 felt on entire roof", "Install metal drip edge on eave and rake edges", "Flash & counterflash chimney" and "No staples to be used." Applications can be filed online, by email, by mail, in the City Hall dropbox or in person, and "A copy of your certificate of insurance must be on file with the building division before any permits will be issued." Inspection requests go to the building division by email and must be in "by 3:00 pm to be included on the following day's inspection schedule"; building inspections run Monday through Friday, 9:30 am to 1:00 pm. The office (248-658-3320) is open Monday through Friday, 8:30 AM to 5 PM, closed 1 to 2 PM. Where a permit is pulled, the city's fee schedule charges a building permit fee of $50.00 for the first $1,000.00 of construction value and $20.00 for each additional $1,000.00, $50.00 for the first inspection and $45.00 for each additional inspection, and a $35.00 "Residential Maintenance and Alteration" contractor registration.

View the full Berkley permitting authority record →

Roofing materials for Berkley

Compare roofing material families — service life, weight, cost band, and durability — for a Berkley reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources