Yes, a permit is required to replace a roof in Bath Township, MI, issued by Charter Township of Bath - Building Department. In Bath Charter Township a reroof starts with the township's no-cost maintenance permit: the Building Department says "By completing a maintenance permit, the building department can determine if the work requires a building permit. There is no charge for a maintenance permit." Its maintenance permits cover "Re-shingling a roof requiring no structural repairs", while a building permit is required for "Replacing or repairing a roof structure (eaves, rafters, trusses, etc.)", and "If a damaged truss, rafter, or eave is discovered when re-shingling a roof, a building permit will be required to make the structural repair." The department says "Contact us with your questions on what type of permit is needed." A building permit package is an application, plot plan, recorded deed and three sets of drawings, and review "should take one week"; trade permits can be issued the same day. To schedule an inspection, call (517) 641-4238, and post the permit's hard card where the inspector can see it from the road. The township says "Bath Charter Township doesn't require a registration; however, a copy of the license is kept on file." Fees are set by township board resolution (Section 14-32), and no fee schedule is posted on the Building Department page, so ask the department for the current fee. This hub aggregates roofing permit and contractor-registration requirements for Bath Township, Michigan, along with sourced roofing material references — every fact linked to its directory record.

Roofing permits & building code in Bath Township

Roofing permit and contractor-licensing rules in Bath Township are set locally by Charter Township of Bath - Building Department. Michigan licenses residential roofers at the state level — the Occupational Code’s residential maintenance and alteration contractor licence names roofing among its trades, with exemptions that include a job whose whole contract price is under $600 — and some cities add a local contractor registration on top, while the Michigan Residential Code applies throughout the state, so a city, village, township or county enforces the state code rather than writing its own roofing rules — always confirm the current requirements with the authority before starting work.

Roofing permit
Required
Contractor registration
Required
Adopted building code
2015 Michigan Residential Code. This is state law and it is the same in every Michigan city, village, township and county: the state construction code act says "This act and the code apply throughout the state," and the Michigan Residential Code rule adopts "the international residential code, 2015 edition" with the state amendments in R 408.30500 to R 408.30547g. A 2021 edition was filed with the secretary of state in 2025 but has not taken effect. On July 7, 2025 the Michigan Court of Claims entered a stipulated order in Home Builders Assoc et al. v LARA et al., and the Michigan Department of Licensing and Regulatory Affairs (LARA) says that while that order remains in place "the 2015 versions of the IRC and residential provisions of the IECC standards currently adopted, in part, by each rule set will remain valid and in effect." LARA's Statewide Jurisdiction List names the Charter Township of Bath as its own building code enforcer. Section 14-31 of the township's Code of Ordinances designates the enforcing agency and names no edition. The Building Department's page quotes a pool barrier rule as "an excerpt from the 2009 Michigan Residential Code referring to swimming pools and fences"; the page does not say which edition the department enforces for roofs, and the 2009 text was not read for this record.
Permit process
In Bath Charter Township a reroof starts with the township's no-cost maintenance permit: the Building Department says "By completing a maintenance permit, the building department can determine if the work requires a building permit. There is no charge for a maintenance permit." Its maintenance permits cover "Re-shingling a roof requiring no structural repairs", while a building permit is required for "Replacing or repairing a roof structure (eaves, rafters, trusses, etc.)", and "If a damaged truss, rafter, or eave is discovered when re-shingling a roof, a building permit will be required to make the structural repair." The department says "Contact us with your questions on what type of permit is needed." A building permit package is an application, plot plan, recorded deed and three sets of drawings, and review "should take one week"; trade permits can be issued the same day. To schedule an inspection, call (517) 641-4238, and post the permit's hard card where the inspector can see it from the road. The township says "Bath Charter Township doesn't require a registration; however, a copy of the license is kept on file." Fees are set by township board resolution (Section 14-32), and no fee schedule is posted on the Building Department page, so ask the department for the current fee.

View the full Bath Township permitting authority record →

Roofing materials for Bath Township

Compare roofing material families — service life, weight, cost band, and durability — for a Bath Township reroof. Every material entry in the directory carries a cited, dated source.

Start with all roofing materials or the asphalt vs. metal vs. tile comparison.

Sources