Permitting Authorities / City of Tualatin - Building Division

Do you need a permit to replace a roof in Tualatin, OR?

Adopted code

City of Tualatin - Building Division

The City of Tualatin Building Division, at 10699 SW Herman Road, issues building permits in Tualatin; its own page says it issues more than 2,000 permits a year in the city. The Oregon Residential Specialty Code, the State's code for one- and two-family dwellings, applies in Tualatin as it does in every Oregon city. This listing covers the office's contact details and the rules state law sets for every Oregon town; it does not cover Tualatin's own permit rules.

Jurisdiction
City of Tualatin, Oregon
Jurisdiction type
city
Address
10699 SW Herman Road, Tualatin, OR 97062
Contact
  • url: https://tualatinoregon.gov/building
  • phone: 503-691-3044
Contractor registration required
Required
Adopted code
The 2026 Oregon Residential Specialty Code (ORSC), the State's code for one- and two-family dwellings, adopted by the Building Codes Division in OAR 918-480-0005, which provides that "The Low-Rise Residential Dwelling Code, identified in ORS 455.610, will be known as the Oregon Residential Specialty Code." The 2026 ORSC "is based on the 2024 edition of the International Residential Code for One-and Two-Family Dwellings (IRC), with Oregon specific amendments" and took effect October 1, 2026. Its administrative chapter, Chapter 1, has been mandatory since that date. For its construction chapters (Chapters 2 to 44, including Chapter 9, Roof Assemblies) the rule set a six-month phase-in ending March 31, 2027, during which the 2023 ORSC, based on the 2021 IRC, also remained adopted and building departments had to accept plans designed to either edition; the 2026 edition is mandatory from April 1, 2027. Under the rule, "Code requirements in effect at the time a plan review or permit application is filed controls the construction under the application unless the applicant agrees to be controlled by subsequent changes." The code is the same in every city and county: "The state building code shall be applicable and uniform throughout this state and in all municipalities, and no municipality shall enact or enforce any ordinance, rule or regulation relating to the same matters encompassed by the state building code but which provides different requirements unless authorized by the Director of the Department of Consumer and Business Services" (ORS 455.040(1)). A city may therefore have a different local requirement only with the director's authorization, and this record did not read whether this city holds any such authorization. Where a city does not run a building inspection program, the county administers the code inside the city, and where the county does not, the State does (ORS 455.148(5) and (6)). In Tualatin the code is administered by the City's own Building Division, whose page says the division issues more than 2,000 permits each year in Tualatin.
Sales & use tax
None. Oregon has no general sales tax, so neither the materials nor the labour on a reroof carries a state sales tax. The Oregon Department of Revenue says: "Oregon doesn't have a general sales or use/transaction tax."

Sources

Roofing questions: Tualatin, OR

Do roofing contractors need a license or registration in Tualatin, OR?

Yes.

What building code does Tualatin, OR use?

The 2026 Oregon Residential Specialty Code (ORSC), the State's code for one- and two-family dwellings, adopted by the Building Codes Division in OAR 918-480-0005, which provides that "The Low-Rise Residential Dwelling Code, identified in ORS 455.610, will be known as the Oregon Residential Specialty Code." The 2026 ORSC "is based on the 2024 edition of the International Residential Code for One-and Two-Family Dwellings (IRC), with Oregon specific amendments" and took effect October 1, 2026. Its administrative chapter, Chapter 1, has been mandatory since that date. For its construction chapters (Chapters 2 to 44, including Chapter 9, Roof Assemblies) the rule set a six-month phase-in ending March 31, 2027, during which the 2023 ORSC, based on the 2021 IRC, also remained adopted and building departments had to accept plans designed to either edition; the 2026 edition is mandatory from April 1, 2027. Under the rule, "Code requirements in effect at the time a plan review or permit application is filed controls the construction under the application unless the applicant agrees to be controlled by subsequent changes." The code is the same in every city and county: "The state building code shall be applicable and uniform throughout this state and in all municipalities, and no municipality shall enact or enforce any ordinance, rule or regulation relating to the same matters encompassed by the state building code but which provides different requirements unless authorized by the Director of the Department of Consumer and Business Services" (ORS 455.040(1)). A city may therefore have a different local requirement only with the director's authorization, and this record did not read whether this city holds any such authorization. Where a city does not run a building inspection program, the county administers the code inside the city, and where the county does not, the State does (ORS 455.148(5) and (6)). In Tualatin the code is administered by the City's own Building Division, whose page says the division issues more than 2,000 permits each year in Tualatin.