Permitting Authorities / Town of Ridgway - Building Department

Town of Ridgway - Building Department

Adopted code

The building permit authority for the Town of Ridgway, Ouray County. The Building Official reviews building permits, performs inspections, and enforces the Ridgway Municipal Code under the town's adopted 2018 International Building and Residential Codes (RMC Chapter 6, Section 1), as amended.

Jurisdiction
Town of Ridgway, Colorado
Jurisdiction type
city
Address
201 North Railroad Street, Ridgway, CO 81432
Contact
  • url: https://townofridgway.colorado.gov/i-want-to/building-department
  • phone: 970-626-5308
  • email: [email protected]
Roofing permit required
true
Permit process note
The Town's Building Department page states: "The Building Official is responsible for building permit review, inspections and code enforcement. The Town of Ridgway has adopted the 2018 International Codes, as amended in RMC 6-1. Please call the building office to confirm permit requirements before starting any work. All plumbing and electrical permits are handled by the State of Colorado." The town's 2018 IRC amendments (Ridgway Municipal Code Section 6-1-1, Section R105.2 "Work exempt from [building] permit") add: "11. Re-roofing less than 200 square feet. 12. Re-siding with similar materials less than 200 square feet," meaning re-roofing at or above 200 square feet requires a building permit under the town's own code language; roofing_permit_ required is set true on that basis for typical whole-roof jobs. The same amendments require a $75 town site permit for the enlarged 150-sq-ft accessory-structure exemption, a $75 site permit for exempt fences under 6 feet, and a $75 site permit for exempt low decks, and state permit fees generally follow Appendix L of the 2018 IRC (plan review fees at 65% of the building permit fee). Work must commence within 180 days of permit issuance. A Building Permit Application & Applicant Checklist, Demolition, Encroachment, Fire Suppression Tap, Flood Plain Development, Sign, Site, Stove, and Water & Sewer Tap applications are published on the Building Department page; there is no separate re-roofing-specific application form. No wildfire/ignition-resistant or "Class A" roofing material requirement was found in RMC Chapter 6, Section 1.
Inspection requirements
"A Certificate of Occupancy (CO) must be obtained before any building can be occupied." Inspections are scheduled by calling Building Official Jordan Batchelder at 970-626-5308 x216, and "a minimum 48-hour notice for planned inspections is very much appreciated." All plumbing and electrical permits/inspections are handled by the State of Colorado, not the town.
Adopted code
Ridgway Municipal Code Section 6-1-1(A)-(B) (amended by Ord. 9-2019): "There is hereby adopted... The International Building Code, 2018 Edition, including Appendices E, I and J... There is hereby adopted... The International Residential Code, 2018 Edition, including Appendices E, F, G, H, J, L, M, Q, R and S..." both as published by the International Code Council, with local amendments to sections including 101.4.3 (Plumbing, per the state-adopted IPC), 101.4.8 (Electrical, per the state-adopted Electrical Code), 104.10.1 (Flood Hazard Areas per RMC 6-2), 105.2/R105.2 (work exempt from permit, described above), 107.1 (architectural/structural documents must be prepared by a Colorado-licensed architect/engineer), and 109.2 (permit fees per Appendix L of the 2018 IRC).