Permitting Authorities / Arkansas / City of Mountain Home - Building Inspection Department (Building Permits)

Do you need a permit to replace a roof in Mountain Home, AR?

Adopted code

City of Mountain Home - Building Inspection Department (Building Permits)

No, Mountain Home, AR does not require a permit for like-for-like roof replacement (City of Mountain Home - Building Inspection Department (Building Permits)). The City's Permits page states: "The Building Inspection Departments handles the processing of the following permits and licenses:" and lists a Residential Building Permit. The City's Do I need a Permit? page lists "Roofing" under "Permit not needed:" in its Building section with no condition. That page cites City ordinances 11.08.01-11.08.05 (Building), which this record did not read.

Jurisdiction
City of Mountain Home, Arkansas
Jurisdiction type
city
Address
720 South Hickory Street, Mountain Home, AR 72653
Contact
  • url: https://www.mountainhomear.gov/planning-and-engineering
  • phone: 870-425-2550
Roofing permit required
Not required
Contractor registration required
Required
Registration details
  • state_level: STATEWIDE. The roofing contractor registration subchapter, Ark. Code Ann. 17-25-601 et seq., provides at 17-25-603(a): "A person shall not act as a roofing contractor after July 1, 2021, unless a person is: (1) Granted a roofing contractor registration certificate by the Residential Contractors Committee; or (2) Exempt from certification under this subchapter." Failing to procure a certificate is, upon conviction, a Class A misdemeanor, with each day a separate offense (17-25-603(b)). Section 17-25-601(4) defines a roofing contractor as "a person, including a subcontractor or nonresident roofing contractor, that in the ordinary course of business" either "Engages in the business of residential roofing services for a fee" or "Offers to engage in or solicits residential roofing-related services, including construction, installation, renovation, repair, maintenance, alteration, and waterproofing". The definition excludes persons engaged in demolition or in cleanup of construction waste, employees or day laborers working under the direct supervision of a roofing contractor, and persons exempt from the subchapter (17-25-601(4)(B)). Section 17-25-610 exempts "The owner of a single-family residence acting as his or her own roofing contractor on his or her own property"; "A person that acts as a roofing contractor in the construction of his or her residence unless he or she builds more than one (1) residence during a calendar year"; "A person licensed as a contractor by a licensing agency, board, or commission of the State of Arkansas if the person is performing work within the scope of the license held by the person"; a contractor licensed by the Contractors Licensing Board who holds a classification that authorizes roofing; and, under 17-25-610(5), a home improvement contractor or residential building contractor only if that contractor is in compliance with all requirements to do business in the State, including municipal or county requirements, the roofing services "do not constitute more than fifty percent (50%) of the total project cost", and the contractor "Does not authorize agents, employees, or representatives of the home improvement contractor or the residential building contractor to engage in door-to-door sales of roofing services." An applicant must attach "A surety bond in the minimum amount of fifteen thousand dollars ($15,000)" (17-25-604(d)(1)) and proof of workers' compensation coverage (17-25-604(d)(2)). The certificate expires "one (1) year after the date of issuance unless otherwise provided by the committee" (17-25-609(a)). The committee may charge "a fee not to exceed one hundred dollars ($100)" for a new certificate or a renewal (17-25-609(b)), and its rule states: "New and renewal registration fees shall be twenty dollars ($20.00)." (17 CAR 295-204(a)) The committee may revoke the certificate of a roofing contractor found guilty of "Engaging in roofing services without obtaining a proper permit as may be required by a local authority" (17-25-607(d)(8)). A roofing contractor that performs work or enters into a contract in violation of the subchapter shall not bring an action to enforce the contract with a consumer or for quantum meruit (17-25-611). The Contractors Licensing Board's application page states that a Residential Roofer Registration is needed for roofing projects "more than $2,000, including but not limited to, labor and material". That dollar figure is the page's: sections 17-25-603 and 17-25-610 state no dollar amount, and the two thousand dollar exemption in 17-25-513(3) belongs to the separate home improvement and residential building license subchapter, from whose licensing requirements 17-25-513(6) exempts a person performing work as a roofing contractor. The same page states that "Contractors who have a Residential Builders or Residential Remodelers License DO NOT NEED the Registration", without the conditions in 17-25-610(5), and that a contractor holding a Home Improvement License in the roofing classification would need to apply for it. The same page states of the separate commercial license: "A commercial license is needed if a contractor performs work of $50,000 or more, including, but not limited to, labor and materials, on a commercial project. Any project that is not a single-family residence is a commercial project." Section 17-25-101(a)(1) sets the same $50,000 line, and 17 CAR 255-101(6)(A) defines single-family residences as "any project consisting of one (1) but not more than four (4) units constructed for residential occupancy". Under that chapter, 17-25-301(b)(2) provides: "It shall be unlawful for the building inspector or other authority to issue or allow the issuance of a building permit unless and until the applicant has furnished evidence that he or she is either exempt from the provisions of this chapter or is duly licensed under this chapter to carry out or superintend the work for which the permit has been applied." Registration is with the State and is what the boolean on this record turns on.
  • city_level: The City's Adopted Codes and Permitting Fees sheet states: "All Contractors (General and Subcontractors) conducting business inside the corporate limits of Mountain Home are required to obtain a business license." This is a general business license, not a roofing license.
Permit process note
The City's Permits page states: "The Building Inspection Departments handles the processing of the following permits and licenses:" and lists a Residential Building Permit. The City's Do I need a Permit? page lists "Roofing" under "Permit not needed:" in its Building section with no condition. That page cites City ordinances 11.08.01-11.08.05 (Building), which this record did not read.
Adopted code
Arkansas has a statewide fire prevention code, adopted by the State Fire Marshal. The Arkansas Department of Labor and Licensing's Contractors Licensing Board page states: "The Arkansas Building Code is adopted by the State Fire Marshal's office. It is a part of the Fire Prevention Code. The Code applies Statewide, even in rural and unincorporated areas." The same page states that "The Arkansas Fire Prevention Code is a three volume set", that Volume III is known as the "Residential Code", and that "The Code is based on the International Fire, Building, and Residential Codes, with some Arkansas changes." The Helpful Links page of the State Fire Marshal's Office lists "Arkansas Fire Prevention Code 2021, Volume III Residential". The only Fire Marshal rule text this record read is a filing with the Arkansas Legislature, stamped received by the Bureau of Legislative Research on April 27, 2022, and titled "2021 ARKANSAS FIRE PREVENTION CODE RULES CHANGES". It is a marked-up draft: "Deletions noted by word strikethroughs and additions are noted by word underlining." Its orders read "effective TBD". In its Fire Code part, as underlined new text, [A] 101.2.2 (Locally adopted codes) reads: "Each district, county, municipality, or other political subdivision of this state shall only adopt and enforce the provisions of the Arkansas Fire Prevention Code, 2021 Edition. The AFPC 2021 Edition shall be the only foundation document available for modification by local jurisdictions should they choose to adopt more stringent provisions." Its definitions read: "INTERNATIONAL RESIDENTIAL CODE shall mean the Arkansas Fire Prevention Code, Volume III." Its Volume III part, headed "PROPOSED CHANGES TO VOLUME III OF III VOLUMES", lists "Chapter 8, Roof-Ceiling Construction--No Changes" and "Chapter 9, Roof Assemblies--No Changes". This record did not read the 2021 code as published and does not state that the filing was adopted as filed. Everything above is Arkansas state material, the same in every city and town. Mountain Home's Adopted Codes and Permitting Fees sheet lists, under "Current Adopted Codes:", "2021 Arkansas Fire prevention Code Vol. 1, 2, & 3".
Sales & use tax
9.875% combined = Arkansas state rate 6.500% + Mountain Home City List rate 2.125% (effective 07/01/21) + Baxter County rate 1.250% (effective 01/01/19), per the Arkansas Department of Finance and Administration's October - December 2026 "List of Cities and Counties with Local Sales and Use Tax". The City List prints "Mountain Home 03-01 07/01/21 2.125% Baxter 1.250% 3.375%" and the County List prints "Baxter County 03-00 01/01/19 1.250%". City List rate 2.125% + county rate 1.250% = the row's total of 3.375%; adding the state rate gives 9.875%. The Department's State Sales & Use Tax Rates page lists the state sales and use tax at 6.500%, effective 07/01/2013. For a roofer, 26 CAR 30-1003 of the Code of Arkansas Rules (contractors, in the Department of Finance and Administration's gross receipts tax rules) provides at (a)(1)(B): "All contractors are deemed to be consumers or users of all tangible personal property including materials, supplies, and equipment used or consumed by them in performing any contract, and the sales of all such property to contractors are taxable sales." Subdivision (a)(1)(C) adds: "The contractor must pay tax at the time of purchase or pay tax at the time the materials are withdrawn from stock for use in the performance of the contract." Under the heading "Permitted business", (d)(1)(A) provides: "A business holding a sales tax permit should purchase all materials used in its construction, repair, and retail business exempt from sales tax as sales for resale." Under (d)(1)(B)(i), "Any materials used in the performance of nontaxable services are not taxed to the customer." Under (d)(1)(B)(ii), "However, the business must self-assess, report, and pay sales tax as a withdrawal from inventory (stock) on the purchase price of the materials." Under the heading "Nonpermitted business", (d)(2)(A) provides: "A business that is not required to hold a sales tax permit must pay tax on all purchases of materials." Subsection (f) provides: "If a business performs both taxable and nontaxable services or if a business sells tangible personal property at retail, then the business is required to obtain a sales tax permit." and "If no taxable services are performed and no retail sales are made by the business, then a sales tax permit is not required." Subdivision (b)(1)(A) lists "roofs" among the "nonmechanical, passive, or manually operated components of buildings or other improvements or structures affixed to real estate" and provides that their "initial installation, alteration, addition, cleaning (with exceptions noted in subdivision (c)(2) of this section), refinishing, replacement, or repair" are not taxable services; subdivision (c)(2)(B) provides that "The cleaning of the interior or exterior of any building or structure, including vents, ducts, windows, walls, ceilings, or floors, is a taxable service." This record states the rate for a sale in this town; it does not say whose local rate applies to a roofer's purchase of materials.

The Building Inspection Department handles the processing of residential building permits in the City of Mountain Home, Arkansas (Baxter County), from City Hall, 720 South Hickory Street. The City's Adopted Codes and Permitting Fees sheet lists the 2021 Arkansas Fire Prevention Code, Volumes 1, 2 and 3, among its current adopted codes. This listing covers the office's contact details, the Arkansas roofing contractor registration rule, the state fire prevention code statements and the local sales tax rate, and the code facts quoted below; it does not cover every local permit rule.

Sources

Roofing questions: Mountain Home, AR

Do you need a permit to replace a roof in Mountain Home, AR?

No, Mountain Home, AR does not require a permit to replace a roof.

Do roofing contractors need a license or registration in Mountain Home, AR?

Yes.

What building code does Mountain Home, AR use?

Arkansas has a statewide fire prevention code, adopted by the State Fire Marshal. The Arkansas Department of Labor and Licensing's Contractors Licensing Board page states: "The Arkansas Building Code is adopted by the State Fire Marshal's office. It is a part of the Fire Prevention Code. The Code applies Statewide, even in rural and unincorporated areas." The same page states that "The Arkansas Fire Prevention Code is a three volume set", that Volume III is known as the "Residential Code", and that "The Code is based on the International Fire, Building, and Residential Codes, with some Arkansas changes." The Helpful Links page of the State Fire Marshal's Office lists "Arkansas Fire Prevention Code 2021, Volume III Residential". The only Fire Marshal rule text this record read is a filing with the Arkansas Legislature, stamped received by the Bureau of Legislative Research on April 27, 2022, and titled "2021 ARKANSAS FIRE PREVENTION CODE RULES CHANGES". It is a marked-up draft: "Deletions noted by word strikethroughs and additions are noted by word underlining." Its orders read "effective TBD". In its Fire Code part, as underlined new text, [A] 101.2.2 (Locally adopted codes) reads: "Each district, county, municipality, or other political subdivision of this state shall only adopt and enforce the provisions of the Arkansas Fire Prevention Code, 2021 Edition. The AFPC 2021 Edition shall be the only foundation document available for modification by local jurisdictions should they choose to adopt more stringent provisions." Its definitions read: "INTERNATIONAL RESIDENTIAL CODE shall mean the Arkansas Fire Prevention Code, Volume III." Its Volume III part, headed "PROPOSED CHANGES TO VOLUME III OF III VOLUMES", lists "Chapter 8, Roof-Ceiling Construction--No Changes" and "Chapter 9, Roof Assemblies--No Changes". This record did not read the 2021 code as published and does not state that the filing was adopted as filed. Everything above is Arkansas state material, the same in every city and town. Mountain Home's Adopted Codes and Permitting Fees sheet lists, under "Current Adopted Codes:", "2021 Arkansas Fire prevention Code Vol. 1, 2, & 3".