Permitting Authorities / Town of Mead - Building Division

Town of Mead - Building Division

Adopted code

The Town of Mead, Colorado operates its own Building Division, which checks plans, performs inspections, and keeps project records for construction in town, with SAFEbuilt providing plan review and inspection staff. A building permit is required for most construction projects, including re-roofing.

Jurisdiction
Town of Mead, Colorado
Jurisdiction type
city
Address
441 Third Street, Mead, CO 80542
Contact
  • url: https://www.townofmead.org/building
  • phone: 970-535-4477
Permit portal
Roofing permit required
true
Permit process note
A building permit is required for most construction projects — the Town's "Do I Need A Building Permit?" page lists re-roofing among the projects requiring a permit (along with siding replacement, window replacement, and PV solar systems). Gutters and downspouts do not require a permit. Homeowners are advised to call the Building Division at 970-535-4477 with questions before starting a project.
Inspection requirements
Inspection requests are handled by SAFEbuilt (303-774-0454); the Town's building contacts include a SAFEbuilt building official (970-545-3555) and a permit technician (970-805-4197).
Adopted code
2024 editions of the International Building, Residential, Mechanical, Plumbing, Fuel Gas, Energy Conservation, Property Maintenance, Existing Building, and Pool and Spa Codes and the National Electrical Code (Ordinance 1092), plus the 2021 International Fire Code (Ordinance 1036) and Weld County on-site wastewater regulations (Ordinance 892).

Sources