Permitting Authorities / City of Longview - Community Development Department

Do you need a permit to replace a roof in Longview, WA?

Adopted code

City of Longview - Community Development Department

The City of Longview Community Development Department, through its Building Division at Longview City Hall, 1525 Broadway St, reviews plans, inspects buildings and issues building permits in Longview, in Cowlitz County. The Washington State Building Code applies in Longview as it does in every Washington city. This listing covers the office's contact details and the rules state law sets for every Washington town; it does not cover Longview's own permit rules.

Jurisdiction
City of Longview, Washington
Jurisdiction type
city
Address
1525 Broadway St, Longview, WA 98632
Contact
  • url: https://www.mylongview.com/478/Permits-Inspections
  • phone: 360-442-5086
Permit portal
Contractor registration required
Required
Adopted code
The 2021 International Residential Code, as adopted and amended by the State Building Code Council in chapter 51-51 of the Washington Administrative Code. WAC 51-51-003 adopts "The 2021 edition of the International Residential Code as published by the International Code Council" by reference "with the following additions, deletions, and exceptions," and WAC 51-51-008 says it "shall become effective in all counties and cities of this state on March 15, 2024." State law makes this code mandatory everywhere: "there shall be in effect in all counties and cities the state building code" (RCW 19.27.031(1)), which "shall be enforced by the counties and cities" (RCW 19.27.050). The State's changes to Chapter 9, Roof Assemblies, consist of one section on secondary roof drains and overflow scuppers (WAC 51-51-0903, Section R903.4.1). A city or county may amend the state code, but "the amendments shall not result in a code that is less than the minimum performance standards and objectives contained in the state building code," and "no amendment ... that affects single-family or multifamily residential buildings shall be effective unless the amendment is approved by the building code council" (RCW 19.27.060(1) and (1)(a)). Amendments to administrative provisions need not be submitted for that approval if they "do not alter the construction requirements" (WAC 51-04-030(4), Exception). This record did not read this city's own amendments to the state code. Everything above is Washington state law, the same in every city. In Longview the Community Development Department's Building Division regulates building and use of structures through the application of adopted codes and ordinances, including plan review and inspections.

Sources

Roofing questions: Longview, WA

Do roofing contractors need a license or registration in Longview, WA?

Yes.

What building code does Longview, WA use?

The 2021 International Residential Code, as adopted and amended by the State Building Code Council in chapter 51-51 of the Washington Administrative Code. WAC 51-51-003 adopts "The 2021 edition of the International Residential Code as published by the International Code Council" by reference "with the following additions, deletions, and exceptions," and WAC 51-51-008 says it "shall become effective in all counties and cities of this state on March 15, 2024." State law makes this code mandatory everywhere: "there shall be in effect in all counties and cities the state building code" (RCW 19.27.031(1)), which "shall be enforced by the counties and cities" (RCW 19.27.050). The State's changes to Chapter 9, Roof Assemblies, consist of one section on secondary roof drains and overflow scuppers (WAC 51-51-0903, Section R903.4.1). A city or county may amend the state code, but "the amendments shall not result in a code that is less than the minimum performance standards and objectives contained in the state building code," and "no amendment ... that affects single-family or multifamily residential buildings shall be effective unless the amendment is approved by the building code council" (RCW 19.27.060(1) and (1)(a)). Amendments to administrative provisions need not be submitted for that approval if they "do not alter the construction requirements" (WAC 51-04-030(4), Exception). This record did not read this city's own amendments to the state code. Everything above is Washington state law, the same in every city. In Longview the Community Development Department's Building Division regulates building and use of structures through the application of adopted codes and ordinances, including plan review and inspections.