Permitting Authorities / Missouri / City of Lakeshire - Building Commissioner

Do you need a permit to replace a roof in Lakeshire, MO?

Adopted code

City of Lakeshire - Building Commissioner

The Building Commissioner takes building permit applications in the City of Lakeshire, Missouri (St. Louis County), and presents each request to the Board of Aldermen for approval; the City's contacts page gives City Hall, 10000 Puttington Drive, as its address. This listing covers the office's contact details, the local sales tax rate, and the permit facts quoted below; it does not cover every local permit rule.

Jurisdiction
City of Lakeshire, Missouri
Jurisdiction type
city
Address
10000 Puttington Drive, Lakeshire, MO 63123
Contact
  • url: https://lakeshiremo.gov/building-permits/
  • phone: 314-631-6222
Permit process note
The City's Building Permits page states: "Building permits are required but not limited to the following:" and lists accessory structures and sheds, room additions, decks, "Any structural changes", garages and mechanical permits, among others. It states that when applying "you must submit four (4) copies of drawings and four (4) copies of your plot plan along with the permit fee to the Building Commissioner for review and on-site inspection." It adds: "The city of Lakeshire will complete all necessary structural and mechanical inspections." It states: "Upon his review, the Building Commissioner will present the request to the Board of Aldermen for approval." It says the Board meets once a month, on the second Monday, and that "plans must be submitted two (2) weeks prior to the meeting." A permit "is valid for a six-month period". After City approval the homeowner or contractor "must submit the plans to St. Louis County to apply for Electrical or Plumbing permits". The City's building permit form states: "The cost of the permit is $7.00 per thousand - $7.00 minimum."
Adopted code
RSMo 67.280 lets a community with the power to do so adopt a technical code by reference: "Any community, if the community otherwise has the power under the law to adopt such an ordinance, may adopt or repeal an ordinance which incorporates by reference the provisions of any code or portions of any code". This record did not read Lakeshire's own code ordinance or amendments.
Sales & use tax
Lakeshire's combined sales tax rate is 9.238% (use tax 4.225%), jurisdiction code 40088-189-000, per the Missouri Department of Revenue's Jurisdiction and Total Rate Database for the fourth quarter of 2026. Missouri's own state rate is 4.225%; the rest is local. Sales tax follows "the combined state and local rate at the location of the seller", so this rate applies to purchases from a seller in the town. For a re-roof, 12 CSR 10-112.010(1) provides that "a contractor is the final user and consumer of the materials and supplies used and consumed in fulfilling a construction contract and which become part of a completed real property improvement," so, in general, the roofer pays tax when it buys the materials. Under 12 CSR 10-112.010(3)(A), "In general, title passes after installation is complete, unless the contractor and purchaser expressly agree otherwise." Where title passes after attachment the contractor "is subject to tax on its purchase of the tangible personal property and does not collect tax on its transfer of ownership or title of the item." Where it passes before attachment the contractor "does not pay tax on its purchase, but must collect tax on the sale price of the item."

Sources