Permitting Authorities / Missouri / City of Granby - City Hall (Building Permits)

Do you need a permit to replace a roof in Granby, MO?

Adopted code

City of Granby - City Hall (Building Permits)

City Hall issues building permits in the City of Granby, Missouri (Newton County), from 414 N Main St. The City's Ordinance No. 955 adopts the 2018 International Building Code, with amendments, and the 2018 International Plumbing and Mechanical Codes. This listing covers the office's contact details and the local sales tax rate, the City's contractor licence rule, and the code facts quoted below; it does not cover every local permit rule.

Jurisdiction
City of Granby, Missouri
Jurisdiction type
city
Address
414 N Main St, Granby, MO 64844
Contact
  • url: https://granby-mo.com/building-codes-and-permits
  • phone: 417-472-6556
Contractor registration required
Required
Registration details
  • state_level: Missouri has no statewide roofing contractor licence: the index of Chapter 324 of the Revised Statutes of Missouri, the chapter on occupations and professions, lists no section on roofing contractors.
  • city_level: The City's Residential Building Permit Application and Inspection Procedure says: "Any contractors (general, electrical, plumbing, mechanical etc) working on the planned building site must be properly licensed with the City of Granby". Ordinance No. 951, Section 505.090(A), bars contracting work of any kind in the City unless the person holds an unrevoked contractor's license issued by the City. Section 505.090(C) lets an owner do work on the owner's single-family dwelling on listed conditions, with the required permit. The application says work will not commence until contractors are licensed with the City. Section 505.100 sets a license fee of $100.00 and requires liability insurance; the City's Contractor License Application lists $25.00 for a business inside the city limits and $50.00 outside, for a license running October 1 to September 30.
Permit process note
Ordinance No. 951, Section 505.010, requires a building permit from the City Clerk before a building or structure is erected, constructed, reconstructed, demolished or moved, or an existing structure is added on to. The City's Residential Building Permit Application and Inspection Procedure names new work, fencing and additions and does not name roofing. It says the application is reviewed by the Code Enforcement Official (Mayor), and that a permit is valid for one year after issuance and work must commence within 180 days. Section 505.050 lists a residential building permit at $25.00.
Adopted code
RSMo 67.280 lets a community with the power to do so adopt a technical code by reference: "Any community, if the community otherwise has the power under the law to adopt such an ordinance, may adopt or repeal an ordinance which incorporates by reference the provisions of any code or portions of any code". The City's Ordinance No. 955 (Chapter 510) adopts the "International Building Code 2018 Edition, including Appendix Chapters C, F, G, I and J" with local amendments, and adopts the International Plumbing Code 2018 Edition and the International Mechanical Code 2018 Edition; the ordinance names no International Residential Code. Ordinance No. 955 was passed and approved May 8, 2025 and says it takes effect upon passage. It also adopts the 2017 National Electrical Code. This record did not read the rest of Granby's code ordinance.
Deck & sheathing requirements
Ordinance No. 955, Section 510.010(B), item 6, Roof, amends the 2018 International Building Code. It sets a roof minimum "of thirty (30) pounds per square foot, whether utilizing framing or trusses." It gives as examples rafters or trusses 24 inches on center with 7/16 OSB with clips, with clips required on all spans more than 16 inches on center, and, for metal roofs, rafters or trusses on 4 foot centers with purlins on 2 foot centers.
Sales & use tax
Granby's combined sales tax rate is 8.475% (use tax 4.225%), jurisdiction code 28108-145-000, per the Missouri Department of Revenue's Jurisdiction and Total Rate Database for the fourth quarter of 2026. Missouri's own state rate is 4.225%; the rest is local. Sales tax follows "the combined state and local rate at the location of the seller", so this rate applies to purchases from a seller in the town. For a re-roof, 12 CSR 10-112.010(1) provides that "a contractor is the final user and consumer of the materials and supplies used and consumed in fulfilling a construction contract and which become part of a completed real property improvement," so, in general, the roofer pays tax when it buys the materials. Under 12 CSR 10-112.010(3)(A), "In general, title passes after installation is complete, unless the contractor and purchaser expressly agree otherwise." Where title passes after attachment the contractor "is subject to tax on its purchase of the tangible personal property and does not collect tax on its transfer of ownership or title of the item." Where it passes before attachment the contractor "does not pay tax on its purchase, but must collect tax on the sale price of the item."

Sources

Roofing questions: Granby, MO

Do roofing contractors need a license or registration in Granby, MO?

Yes.

What building code does Granby, MO use?

RSMo 67.280 lets a community with the power to do so adopt a technical code by reference: "Any community, if the community otherwise has the power under the law to adopt such an ordinance, may adopt or repeal an ordinance which incorporates by reference the provisions of any code or portions of any code". The City's Ordinance No. 955 (Chapter 510) adopts the "International Building Code 2018 Edition, including Appendix Chapters C, F, G, I and J" with local amendments, and adopts the International Plumbing Code 2018 Edition and the International Mechanical Code 2018 Edition; the ordinance names no International Residential Code. Ordinance No. 955 was passed and approved May 8, 2025 and says it takes effect upon passage. It also adopts the 2017 National Electrical Code. This record did not read the rest of Granby's code ordinance.